• 제목/요약/키워드: process plans

검색결과 1,289건 처리시간 0.029초

거주자참여 코하우징의 평면조정에서 나타난 계획과정의 특성 - 코디네이터회사에 의한 성미산마을 코하우징 사례연구 - (The Characteristics in the Planning Process of Co-housing: Modification of Plans by Residents' Participation - Case of Co-housing Built by a Coordination Company in Seongmisan Village -)

  • 박경옥;이상운;류현수
    • 한국주거학회논문집
    • /
    • 제24권4호
    • /
    • pp.61-73
    • /
    • 2013
  • The purpose of this study is to provide information needed to the construction of the co-housing in the urban area. This study focused on the characteristics of co-housing in its planning process of private house & common space; 'economy', 'creativity' & 'sociality'. The object of this study is co-housing in 'Seongmi-san Village' in Seoul, which was built by a coordination company with residents' participation. The methods are investigating interview materials, floor plans of 9 households, & common space plans produced in the coordination process from the basic plan of private house & common space to the final plan. The results are as follows. 1) The size and plan of private house differed from each other. The water pipe location differed from each floor, so that there were difficulties in construction. In conclusion, these made no 'economy', but brought high 'creativity'. 2) The 'sociality' would be estimated as high because there were various types of resident participation; resident interviews on the planning, workshops for private housing plan, and workshops for common space.

NC 데이터 정량화를 통한 고품질 사출금형 NC 가공데이터 선정 방안 (Development of a System for Selecting High-Quality Mold Manufacturing NC Data Using Evaluating the NC Data)

  • 허은영;김보현;김동원
    • 한국정밀공학회지
    • /
    • 제23권4호
    • /
    • pp.99-108
    • /
    • 2006
  • Since mold industries are regarded as belonging to three types of bad business, capable young people are reluctant to work in this field. The industries are hard to employ skilled workers who have much experience and knowledge On the mold manufacturing. Thus, effective CAM systems are required for unskilled workers to create process plans and NC data for the manufacturing, and process plans play important roles in the downstream manufacturing processes, such as NC machining, polishing, and final assembly. This study proposes a decision support system that facilitates unskilled workers to easily select high quality NC-data, as well as to increase productivity. The proposed system is assumed to follow a CAM operation scenario that consists of next three steps: 1) identifying several process plans and enumerating feasible unit machining operations (UMOs) from material and part surface information, 2) creating all feasible NC-data based on UMOs using a commercial CAM system, 3) selecting the best NC data among the feasible NC data using four screening criteria, such as machining accuracy, machining allowance, cutting load, and processing time. A case study on the machining of a camera core mold is provided to demonstrate the proposed system.

농업생산기반시설 경관형성에 관련된 제도, 심의 및 정책 여건에 관한 연구 (Studies on the Government Act, Deliberation, and Policy related with Landscape Formation of Agricultural Production Facilities)

  • 김영태;조동범
    • 농촌계획
    • /
    • 제25권3호
    • /
    • pp.67-75
    • /
    • 2019
  • Agricultural production facilities that have been established to support improving food production, farm income, and reduction of farming time have remarkable achievements as value-neutral devices or infrastructures, but recently they are pointed out as a factor that hinders landscape by changing the contextual values of rural area. Despite this timelessness, research on the landscape design of agricultural production facilities has not been conducted until now. Based on these research necessities, this study aims to improve the process of reviewing the landscape of agricultural production facilities by analyzing the impact of activities, policies, plans. The results of this study are as follows. First, the analysis of the literature and the related data were carried out. This presents the structural limitations of why landscape review is difficult in the process of reviewing plans and the limitations of current landscape laws, deliberations, and plans. The process of reviewing the plan has formed a functionally oriented closed network, and the government policy does not properly control the landscape design of agricultural production facilities. From the viewpoint of the study, results can be used as basic data for the study of the lack of agricultural production facilities and landscape.

협업 공정계획을 위한 생산흐름 분석 시뮬레이션 통합 (Production Flow Analysis Simulation Integration for Collaborative Process Planning)

  • 이주연;노상도
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 춘계학술대회 논문집
    • /
    • pp.987-992
    • /
    • 2005
  • Manufacturing companies should perform process planning and its evaluation concurrently with new product developments so that they can be highly competitive in the modern market. Process planners should make decisions in the manner of concurrent and collaborative engineering in order to reduce the manufacturing preparation time and cost when developing new products. Automated generation of analysis models from the integrated database, which contains process and material information, reduces time to prepare analyses and makes the models reliable. In this research, we developed a web-based system for concurrent and collaborative system for production flow analysis, using web, database, and simulation technology. An integrated database is designed to automatically generate analysis models from process and material plans without reworking the data. This system enables process planners to evaluate their decision fast and share their opinions with others easily. With this system, it is possible to save time and cost for assembly process and material planning, and reliability of process plans can be improved

  • PDF

Optimal Sampling Plans of Reliability Using the Complex Number Function in the Complex System

  • Oh, Chung Hwan;Lee, Jong Chul;Cho, Nam Ho
    • 품질경영학회지
    • /
    • 제20권1호
    • /
    • pp.158-167
    • /
    • 1992
  • This paper represents the new techniques for optimal sampling plans of reliability applying the mathematical complex number(real and imaginary number) in the complex system of reliability. The research formulation represent a mathematical model Which preserves all essential aspects of the main and auxiliary factors of the research objectives. It is important to formule the problem in good agreement with the objective of the research considering the main and auxilary factors which affect the system performance. This model was repeatedly tested to determine the required statistical chatacteristics which in themselves determine the actual and standard distributions. The evaluation programs and techniques are developed for establishing criteria for sampling plans of reliability effectiveness, and the evaluation of system performance was based on the complex stochastic process(derived by the Runge-Kutta method. by kolmogorv's criterion and the transform of a solution to a Sturon-Liouville equation.) The special structure of this mathematical model is exploited to develop the optimal sampling plans of reliability in the complex system.

  • PDF

확률적으로 종속적인 비평형 다단계 샘플링검사법의 설계 및 평가 (Design and Estimation of Multiple Acceptance Sampling Plans for Stochastically Dependent Nonstationary Processes)

  • 김원경
    • 대한산업공학회지
    • /
    • 제25권1호
    • /
    • pp.8-20
    • /
    • 1999
  • In this paper, a design and estimation procedure for the stochastically dependent nonstationary multiple acceptance sampling plans is developed. At first, the rough-cut acceptance and rejection numbers are given as an initial solution from the corresponding sequential sampling plan. A Monte-Carlo algorithm is used to find the acceptance and rejection probabilities of a lot. The conditional probability formula for a sample path is found. The acceptance and rejection probabilities are found when a decision boundary is given. Several decision criteria and the design procedure to select optimal plans are suggested. The formula for measuring performance of these sampling plans is developed. Type I and II error probabilities are also estimated. As a special case, by setting the stage size as 1 in a dependent sampling plan, a sequential sampling plan satisfying type I and II error probabilities is more accurate and a smaller average sample number can be found. In a numerical example, a Polya dependent process is examined. The sampling performances are shown to compare the selection scheme and the effect of the change of the dependency factor.

  • PDF

A Comparative Study of the Gwangju Metropolitan City area D regional health plan and regional social welfare plan

  • Jeon, Seong Nam;Choi, Young Ho
    • 한국컴퓨터정보학회논문지
    • /
    • 제20권12호
    • /
    • pp.153-161
    • /
    • 2015
  • This study is intended to provide a basis for the planning of local governments to, analyzed in Gwangju Metropolitan City area D sixth regional health plans and Tertiary regional social welfare plans, establishing phase, the evaluation phase side. Based on the study results suggest the following implications. First, Specifically, it should be established to systematically planning process. Second, Plan's vision, key challenges, businesses are logical and details should be provided consistently. Third, It should be evaluated focusing on residents of the area change. Fourth, Change of plan indicators, performance indicators, etc. must be presented in detail.

개발단계의 제품 인증을 위한 베이지언 2단계 신뢰성 실증시험의 통계적 설계 (A Statistical Design of Bayesian Two-Stage Reliability Demonstration Test for Product Qualification in Development Process)

  • 서순근
    • 대한산업공학회지
    • /
    • 제43권2호
    • /
    • pp.147-153
    • /
    • 2017
  • In order to demonstrate a target reliability with a specified confidence level, a new two-stage Bayesian Reliability Demonstration Test (RDT) plans that is known to be more effective than a corresponding single-stage one is proposed and developed by Bayesian framework with beta prior distribution for Weibull life time distribution. A numerical example is provided to illustrate the proposed RDT plans and compared with other non-Bayesian and Bayesian plans. Comparative results show that the proposed Bayesian two-stage plans have some merits in terms of required and expected testing time and probability of acceptance.

철도시스템 안전확보를 위한 네트워크망 구축 방안 연구 (Plans for constructing National transportation Networks for security of Railway System Safety)

  • 홍선호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.612-617
    • /
    • 2005
  • Safety of railway systems is made by understanding causes and process of railway accidents and grasping contents of a many of accidents. Now, Being carried out a research and analysis about an extensive areas(the whole country, the metropolitan area, the five metropolitan cities, the city of three hundred thousands and over of people) and field, thereafter the National Transportation (Railway) Database has been constructed and developed to prepare the base that reduced an overlapping survey using a standardized-material offer. A purpose of this research is to derive plans to apply National transport DB including information in the field of transportation systems to domestic railway safety management. The research analyses the present conditions of establishing national transport DB, and reviews problems when that use to railway system. As being based in this, the research derived definitions and using plans of layers available to use, and plans of establishing and systematizing information for desirable railway network.

  • PDF

Mix/Path 분리에 의한 장기전력수급계획 대안생성 (Development of Alternative Long-term Electric Resource Plans by Mix/Path 2-Stage Procedure)

  • 권영한;김창수;진병문
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.871-874
    • /
    • 1996
  • It is practically very important in multi-criteria long-tenn IRP process to develop the set of candidate resource plans that meet following two conditions. First, the number of resource plans should not be too large for computer job. Second, the unknown best plan should exist among the set of candidate plans. In this paper, several novel procedures are developed. The main idea of the procedures is the two-stage approach. The first stage is to find the set of feasible resource capacity mixes in given target year(s). And, the second stage is to find the set of alternative paths of resource options for each resource mix determined in the first stage.

  • PDF