Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 1996.07b
- /
- Pages.871-874
- /
- 1996
Development of Alternative Long-term Electric Resource Plans by Mix/Path 2-Stage Procedure
Mix/Path 분리에 의한 장기전력수급계획 대안생성
- Kwun, Young-Han (Korea Electrotechnology Research Institute) ;
- Kim, Chang-Soo (Korea Electrotechnology Research Institute) ;
- Jin, Byung-Mun (Korea Electrotechnology Research Institute)
- Published : 1996.07.22
Abstract
It is practically very important in multi-criteria long-tenn IRP process to develop the set of candidate resource plans that meet following two conditions. First, the number of resource plans should not be too large for computer job. Second, the unknown best plan should exist among the set of candidate plans. In this paper, several novel procedures are developed. The main idea of the procedures is the two-stage approach. The first stage is to find the set of feasible resource capacity mixes in given target year(s). And, the second stage is to find the set of alternative paths of resource options for each resource mix determined in the first stage.
Keywords