• Title/Summary/Keyword: process of completion

Search Result 586, Processing Time 0.026 seconds

A COMPARATIVE STUDY OF DELAYS FACTORS IN PROJECT COMPLETION IN LIBYA AND UK CONSTRUCTION INDUSTRY

  • Shebob, A;Dawood, N; Xu, Q
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.614-620
    • /
    • 2011
  • Delays in completing construction projects have significant financial and social impact to all parties involved in the construction process and in particular in developing countries. This is very evident in most construction projects in Libya and in both public and private sectors. The research study was initiated by Libyan Government and the main aim of the project is to develop a new strategy in reducing the impact of delay factors. In order to achieve this, a number of objectives have been set-to conduct a comprehensive literature survey, to conduct a comparative study of the delay factors in project completion in both Libya and UK using semi structured questionnaire and finally, to identify and analyse the causes of delay and ranked them using frequency of occurrence and severity. The critical causes of delay for construction projects were quite different between Libya and UK. For the former, the most critical causes of delay in Libyan construction industry were low skills of manpower, changes in the scope of the project, slowness in giving instruction and poor qualification of consultant, while for the latter they were financial problems, bad weather conditions on the job site and change in the scope of project. Statistical experiments including Paired Samples T-Test, was run to test the significance of the survey data in both countries Libya and UK. The statistical results confirmed the collected data from the survey were significant.

  • PDF

IMPROVING THE USABILITY OF STOCHASTIC SIMULATION BASED SCHEDULING SYSTEM

  • Tae-Hyun Bae;Ryul-Hee Kim;Kyu-Yeol Song;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.393-399
    • /
    • 2009
  • This paper introduces an automated tool named Advanced Stochastic Schedule Simulation System (AS4). The system automatically integrates CPM schedule data exported from Primavera Project Planner (P3) and historical activity duration data obtained from a project data warehouse, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, computes the optimum number of simulation runs, simulates the schedule network for the optimum number of simulation runs, and estimates the best fit PDF of project completion times (PCTs). AS4 improves the reliability of simulation-based scheduling by effectively dealing with the uncertainties of the activities' durations, increases the usability of the schedule data obtained from commercial CPM software, and effectively handles the variability of the PCTs by finding the best fit PDF of PCTs. It is designed as an easy-to-use computer tool programmed in MATLAB. AS4 encourages the use of simulation-based scheduling because it is simple to use, it simplifies the tedious and burdensome process involved in finding the PDFs of the many activities' durations and in assigning the PDFs to the many activities of a new network under modeling, and it does away with the normality assumptions used by most simulation-based scheduling systems in modeling PCTs.

  • PDF

The Development and Application of Posing Open-Ended Problems Program with Renzulli's Enrichment Triad Model for Mathematics-Gifted Elementary Students (초등 수학 영재를 위한 Renzulli의 삼부심화모델 도입 개방형 수학 문제 만들기 프로그램 개발 및 적용)

  • Lee, Ja Hye;Kim, Min Kyeong
    • The Mathematical Education
    • /
    • v.55 no.2
    • /
    • pp.209-232
    • /
    • 2016
  • This study analyzed the process of steps in a program introducing Renzulli's enrichment triad model and various levels of posing open-ended problems of those who participated in the program for mathematics-gifted elementary students. As results, participants showed their abilities of problem posing related to real life in a program introducing Renzulli's enrichment triad model. From eighteen mathematical responses, gifted students were generally outstanding in terms of producing problems that demonstrated high quality completion, communication, and solvability. Amongst these responses from fifteen open-ended problems, all of which showed that the level of students' ability to devise questions was varied in terms of the problems' openness (varied possible outcomes), complexity, and relevance. Meanwhile, some of them didn't show their ability of composing problem with concepts, principle and rules in complex level. In addition, there are high or very high correlations among factors of mathematical problems themselves as well as open-ended problems themselves, and between mathematical problems and open-ended problems. In particular, factors of mathematical problems such as completion, communication, and solvability showed very high correlation with relevance of the problems' openness perspectives.

AN EXPERIMENTAL STUDY OF PERIODONTAL INJURY HEALING IN STREPTOZOTOCIN INDUCED DIABETIC RAT (Streptozotocin유도 당뇨백서에서 치주조직 손상의 치유에 관한 실험적 연구)

  • Kim, Seung-Jae;Chang, Whan-Shik
    • The Journal of the Korean dental association
    • /
    • v.22 no.9 s.184
    • /
    • pp.771-780
    • /
    • 1984
  • To observe the healing process of the gingival wound in diabetic condition, the author induced diabetes mellitus by intravascular injection of streptozotocin in rat tail vein and made fresh wound in rat mandibular posterior gingiva using scalpel. The healing processes of gingival wound were examined periodically by light microscopy. The results were as follows. 1) The healing was completed at second week in control group, but it delayed until fourth week in experimental group and the organization was persisted for first two weeks. 2) The inflamed gingiva of dibetic rat demonstrated scanty polymorphonuclear lerkocytic infiltration at the early stage of experiment, but it soon became numerous as in cotrol group and the lymphocytic infiltrations were same degree as in control group. 3) The tissue destruction was broader in the experimental group than in the control group. The epithelization was began at the early stage of healing and the epithelial attachment was reformed with the completion of the wound healing. 4) Loss of Sharpey's fibers and destruction of cementum and alveolar bone were observed with the inflammatroy reaction, but these were reformed with the completion of the wound healing.

  • PDF

IT Model to Calculate Required Equipments for Excavation Work in Construction Projects

  • Mahajan, Darshan A.;Rajput, Babalu L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.1-4
    • /
    • 2013
  • Excavation is most commonly used activity in all construction projects. All contracting agencies prefer to use bigger and heavier excavators and dumpers on site to do excavations if quantity of excavation is huge. Estimation of required number of excavators and dumpers for completion of excavation could be rather a tedious process involving repetitive calculation on which professionals spend their valuable time. As the Information Technology is highly involved in construction section there os need to have IT model for estimation of number of excavators and dumpers. The developed model is useful to calculate required equipments within short period of time. The purpose of the developed IT model is to save the time and efforts of the construction professional. The paper discusses about model which can be used on site to estimate numbers of excavators and dumpers required for completion of certain quantity of excavation within the given time. The calculation considers various existing formulas and method to generate the output. This information could certainly be useful in planning equipments on construction project sites. The tool is user friendly where any non IT background person can use it on construction sites.

The Effect of Project Managers' Competences on Performance in Public S/W (공공 S/W 분야에서 프로젝트 관리자의 역량이 성과에 미치는 영향)

  • Oh, Minjeong;Ju, Hyoungjun;Lee, Minho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.230-239
    • /
    • 2021
  • There is a growing interest in project management knowledge, project management information systems, and process improvement to systematically project execution in public sectors, achieve high performance and value, and increase the effectiveness of the overall industry. In particular, the software industry is a knowledge-intensive industry centered on professional manpower. This study examines the effect of the project managers' competences of regional SW promotion agencies on and project performance and the moderating effect of the level of project management maturity. We collected data using a questionnaire to the project managers of regional SW promotion agencies. In this study, a structural equation model was used to analyze the relationship between project managers' competences and performance. In addition, a multi-group structural equation model was used to analyze the moderating effect according to the high and low project maturity. As a result of the analysis, it was found that only contextual competence among the competences of the project manager had a positive effect on project performance. It was found that technical and behavioral competence did not have a positive effect on management and completion performance. It was found that the moderating effect according to the maturity of business management of local institutions was not significant.

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

Development of Instruction Models for Creative Engineering Design on the Basis of Multi-Disciplinary Convergence (다학제간 융합 기반의 창의공학설계 수업모형 개발)

  • Kang, An-Na
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.6
    • /
    • pp.1118-1125
    • /
    • 2011
  • This paper is researched the methods of design instruction which can improve students' creativeness through the subject of creative engineering design as a required subject for the accredited engineering program. After studying the preference and problems of design tasks for the students of engineering college, a new education development plan for design process was suggested, which uses the existing design tasks in which creativeness improvement class was focused through the completion of structures. This was through the completion of structures that 'operating the most simple operation with the most complex mechanical mechanism', which uses Rube-Goldberg, the crystal of mechanical mechanism in the union of multi-disciplinary convergence curriculum.

Design of Automobile Exhaust System using a Top-Down Approach Design Methodology (상하향식 설계법을 이용한 자동차 배기시스템의 설계)

  • 고병갑;박경진
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.5 no.6
    • /
    • pp.13-27
    • /
    • 1997
  • In the modern design technology, a component should be designed to fit into the overall system performance. A design methodology is developed to expedite the mechan- ical design of complex mechanical systems, The relation between the system design and component design is defined by a top-down approach and the results from the system design are utilized in the component design process. As a design example, an automobile exhaust system is selected for the system design and a bellows is chosen for a component design. Design methodology based on the top-down approach consists of five steps; (1) Analysis of service load, (2) Development of a lumped parameter, (3) Completion of the system design, (4) Selection of the component topology, (5) Completion of the component design, A method using a equivalent matrix is developed in order to determine unknown external forces in linear structural analyses. The bellows is also analyzed by the finite element method using a conical frustum shell element. Various experiments are performed to verify the developed theories. The top-down desi- gn approach is demonstrated by a design case using structural and shape optimization technology. Since the method is relatively simple and easy compared to other methods, it can be applied to the general design where system and component designs are involves simultaneously.

  • PDF

Quality Management Model for Process Performance Level and Development Technology (프로세스 이행 수준과 개발 기술 품질 관리 모델)

  • Park, J.H.;Park, Y.S.;Jung, H.T.;Kim, S.H.
    • Electronics and Telecommunications Trends
    • /
    • v.32 no.6
    • /
    • pp.105-115
    • /
    • 2017
  • This paper describes a project - based quality management model that identifies development technologies and codes while at the same time verifying the ability to implement processes that are essential in R & D projects. In order to verify the process implemented in the R & D project implementation, there are review, checking points, and evaluating methods the process performance levels for five processes such as defining requirements which is the beginning stage of system development, testing process which is the completion stage of system development, and project management and peer review process for project management and support in the proposed project-based quality management model. For development technology and code validation, the model included the documented test cases for each requirement by the developer in the requirements definition stage, debugging and testing in the design and implementation stages, static analysis and open source licence verification procedure, and system environment. After applying the model in SW development R&D project for evaluating the process performance, and verifying the development technology and the code, the developers responded that the improvement in the development technique and the code, and upgrade of process performance level for project are more than 10%.