1 |
K.K. Chitkara, "Construction Project Management-Planning, Scheduling and Controlling", 18th reprint, Tata McGraw- Hill Publishing Company Limited, pp. 51-54, 2009.
|
2 |
C. Kirmanli, S.G. Erecelebi, "An expert system for hydraulic excavator and tmck selection in surface mining", The Journal of Southern African Institute of Mining and Metallurgy, vol. 109, pp. 727-738, 2009.
|
3 |
S. Alkass, F. Harris, "Expert system for earthmoving selection in road construction", Journal of Construction Engineering and Management, vol. 114, no. 3, pp. 426-440, 1988.
DOI
ScienceOn
|
4 |
A. Haidar, S. Naoum, R. Howes, J. Tah, "Genetic algorithms application and testing for equipment selection", Journal of Construction Engineering and Management, vol. 125, no. 1, pp. 32-38, 1999.
DOI
ScienceOn
|
5 |
A. Shapira, M. Goldenberg, "AHP based equipment selection model for construction projects", Journal of Construction Engineering and Management, vol. 131, no. 12, pp. 1263-1273, 2005.
DOI
ScienceOn
|
6 |
S. Smith, "Earthmoving productivity estimating using linear regression techniques", Journal of Construction Engineering and Management, vol. 125, no. 3, pp. 133-141, 1999.
DOI
ScienceOn
|
7 |
N. Eldin, J. Mayfield, "Determination of most economical scrapers fleet" Journal of Construction Engineering and Management, vol. 131, No. 10, pp.1109-1114, 2005.
DOI
ScienceOn
|
8 |
S. Amirakhanian, N. Baker, "Expert system for equipment selection for ealthmoving operations", Journal of Construction Engineering and Management, vol.118, no. 2, pp. 318-331, 1992.
DOI
|
9 |
S.C. Sharma, "Construction Equipment and Its Management" 4th ed., Khanna Publishers, pp. 1-96, 2004.
|
10 |
R.L. Peurofy, C.J. Schexnayder, A. Shapira, R.L. Schmitt, "Construction Planning, Equipment and Methods", 6th ed., Tata McGraw-Hill Edition, pp. 85-88, 2009.
|