• Title/Summary/Keyword: process maturity

Search Result 370, Processing Time 0.029 seconds

An Empirical Study on the Influence of Change Management Factors on the Change Management Maturity and Successful Information Systems (변화관리요인이 변화관리성숙도와 정보시스템의 성공적 수행에 미치는 영향에 관한 실증적 연구)

  • Kim, Young-Gon
    • Journal of Information Technology Services
    • /
    • v.9 no.1
    • /
    • pp.1-25
    • /
    • 2010
  • Many organizations are facing larger and more frequent changes in the current economic and managerial environment. And what is more, change is supposed to be a business as usual. Considering the importance of change management process and the organizational competency to rapidly and successfully change, in this study the components of change management maturity(CMM) was selected such as the leadership, communication, resistance, people culture factor, methodology, functional group, and change review. And information system performance affected by CMM is confined to the efficiency and effectiveness of information systems. Some results from the verification of research hypotheses and the analysis of the most appropriate model was drawn out. The result of this study can be applied to all organizations which plan to manage more successful change and implement more effective information systems.

A Study on the Approach to Achieve Software Quality in Railway (철도소프트웨어 품질향상 방안 고찰)

  • Joung, Eui-Jin;Shin, Kyung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.1132-1133
    • /
    • 2006
  • The approach, for ensuring the quality and safety of a railway software can be considered with two points of views seeing from products, and from processes. The process point of view is to validate maturity of the organizations in accordance to the judging processes of organizations, which are specified by CMMI(Capability Maturity Model Integration) or SPICE(Software Process Improvement and Capability dEtermination : ISO/IEC15504). In this paper, we are trying to find approaches to estimate the maturity of manufacturer and assessment organization in the railway system.

  • PDF

The Blood Pressure Level and Sexual Maturity in the Children at Puberty (사춘기 아동의 성적성숙도와 혈압수준)

  • Kim, Kyoo-Sang;Lee, Soon-Young;Suh, Ill;Nam, Chung-Mo;Jee, Sun-Hwa
    • Journal of Preventive Medicine and Public Health
    • /
    • v.26 no.3 s.43
    • /
    • pp.347-358
    • /
    • 1993
  • The purpose of this study is to analyze the relationship between the blood pressure level and their sexual maturity and physical growth in the children at puberty. For this purpose, we estimated the blood pressure, physical growth and sexual maturity of the boys of 335 and girls of 373 who are in the middle schools which are located in Kangwha County, Kyungki-Do. Both systolic and diastolic pressure were measured twice. Such physical growth as height, body weight, skin fold thickness, waist circumference, hip circumference and arm circumference were measured. The sexual maturity was estimated according to the classification of Tanner's 5-phase-sexual-maturity : in boys, their pubic hair development phase : in girls, their pubic hair and breast development phase and the menstrual experience. In the phase of the pubic hair development, the boy's sexual maturity was distributed into this; the 1 st 56.4%, the 2nd 29.3%, the 3rd 9.9%, the 4th 4.1% and the 5th 0.3%. While the girls sexual maturity was distributed into this the 1st 20.5%, the 2nd 34.9%, the 3rd 30.6% the 4th 12.6% and the 5th 1.3% in the phase of the pubic hair development, and the 1st 0.8%, the 2nd 13.7%, the 3rd 36.2%, the 4th 18.8% and the 5th 30.5% in the phase of the breast development. This indicated that the girls sexual maturity was higher than those of the boys. The girls menstrual experience rate accounted to the 58.2%. In order to see the relationship between the children's sexual maturity and blood pressure level, we regress blood pressure level on physical growth (i.e., height, BMI) and sexual maturity. Sexual maturity in treates as dummy variables. As the resulf of this analysis, the boys' sexual maturity has nothing to do with the blood pressure either systolic or diastolic. But the girl's systolic pressure was statistically significant ; the 9% of the physical growth, the 5% of the pubic hair development and the 4% of the breast development in sexual maturity was explained. In the girls' diastolic pressure, only their pubic hair development was statistically significant ; the 7% of the physical growth and the 7% of the pubic hair development in the diastolic was explained and the 5% of the physical growth in the diastolic Korotokoff phase IV and the 2% of the pubic hair development in the diastic Korotokoff phase was explained, especially, the girls exprienced menstruation, their systolic and diastolic pressure were significantly high (P<0.01). Conclusively, in the first grade children attending middle schools who are in the early process of the sexual development, the sexual maturity was not related to blood pressure level, on the other hand, the blood pressure level of the girls who are more sexual development than those of the boys' have something to do with sexual maturity and physical growth.

  • PDF

Maturity of the Crater Rim Walls as a function of the Crater Size

  • SIM, Chae Kyung;Kim, Sungsoo S.;Jeong, Minsup
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.40 no.2
    • /
    • pp.45.3-46
    • /
    • 2015
  • Space weathering agents such as micrometeoroids and solar wind particles continuously age the uppermost regolith of the lunar surface by comminuting as well as darkening and reddening. Among several maturity indices, we investigate median grain size () and optical maturity (OMAT) of the crater rim walls. Crater rim wall is the most immature place among the impact crater features because the vertical mixing process by mass-movement can enhance the gardening of regolith and the supply of immature materials in the deeper layer to the surface. More than 140 simple and complex craters were considered. Both and OMAT values of the inner rim wall initially increase as the crater size increases until ~10-20 km, then decrease. This transition crater size happens to correspond to the transition diameter from simple to complex craters. For larger craters, i.e., complex craters, it is clear that the inner rim wall of the craters formed in recent eras tend to remain fresh and become mature along with time. For the simple crater case, smaller craters are more mature, which is opposite to the case of complex craters. This is thought to be because smaller craters become flattened more quickly, thus have smaller vertical mixing in the regolith due to mass-movement. We will also discuss on the maturity indices of the crater rim walls at high latitudes as a function of the position angle to see the latitude dependence of the space weathering process.

  • PDF

The Development of a Maturity Evaluation Model on the Technology Management Competence (MEMTMC) (국내 기업의 기술경영 역량수준의 성숙도 평가 모형 개발)

  • Ahn, Yeon S.;Kim, Wha Young
    • Journal of Information Technology Applications and Management
    • /
    • v.22 no.4
    • /
    • pp.77-94
    • /
    • 2015
  • This research aims to develope a maturity evaluation model on the technology management competence (MEMTMC) and to investigate the relationship between technology management competencies and maturity evaluation level in Korean firms. After research framework building through literature review and field study focusing on interview process, a maturity evaluation model was suggested, including technology management competency factors such as vision and strategy, leadership, resources, projects, performance management, and systematic procedures. Through the empirical study on the 111 Korean firms, the MEMTMC model was tested and some hypotheses were examined. As a result of the research, we found that the MEMTMC is significant statistically to evaluate the technology management competencies of firms from a practical point of view. Additionally, these findings suggest that firms can build up their technology management competencies, including the vision and strategy, leadership, resources, projects, performance management, and systematic procedures in order to raise their maturity level of technology management competencies. But this research has some limitations such as this MEMTMC has not considered separately the variety of industry, not enough survey respondents and 5 level group firms etc.

A Survey on Appraisal Methods of Maturity Level for Applying to Simulation-based Acquisition (SBA 성숙도 심사 방법론 개발을 위한 조사 연구)

  • Park, Jinsoo;Kim, Yun Bae;Jung, Chul Woo
    • Journal of Information Technology and Architecture
    • /
    • v.9 no.3
    • /
    • pp.265-273
    • /
    • 2012
  • To improve M&S and SBA, it is important that their capability and maturity models should be developed. In general, capability and maturity models provide the standards for growth and improvement as well as the assessment on the organizational maturity level and the process capabilities, which are composed of a standard reference model and appraisal methods. In this paper, following introduction of a standard reference model for SBA in brief, we investigate some appraisal methods by survey and provide frameworks of appraisal method for SBA.

Study on Effect of SCM Performance and ERP Diffusion through Supplier Development Maturity Model (공급자개발 성숙도모형이 ERP 확산과 SCM 성과에 미치는 영향에 관한 연구)

  • Song, Jang-Gwen;Park, Kyung-Hye
    • Journal of Distribution Science
    • /
    • v.14 no.5
    • /
    • pp.71-80
    • /
    • 2016
  • Purpose - In case of automobile parts, there has been a lot of progress in the study on supplier development plans and SCM in industrial progress study as well as on the relationship between ERP and SCM. But supplier development program providers have researched on SCM performance in accordance with the interests of the supplier development program most, thus, buyers were knowledgeable about the earlier program performance. Therefore, the purpose of this study is to prove correlation factor, supplier factor, purchaser factor affecting SCM performance and ERP activating diffusion through the process of supplier development. Supplier development maturity formation model is considered important variables as mediators related to the procedure. Finally, the performance formation model of the supplier development maturity through supplier development factor would be presented as the outcome of this study. Research design, data, and methodology - Data gathering was as follows: questionnaires were delivered to 87 companies that have business connection with H Company. The empirical research to test our hypothesis was grounded on statistical analysis (adapting SPSS 19.0 & AMOS 19.0). The hypothesis is that the supplier development factor variables consist of correlation factor, supplier factor, purchaser factor, and have non-negative effects on the next variables: mediators such as supplier development maturity; and the supplier development maturity variables have a positive effect on the next variables: ERP activating diffusion, ERP activating diffusion has a non-negative effect on supply chain performance. We experimented the hypothesized model using path analysis with latent variables. Results - First, it was known that cooperation

    , reliability

    , comprehension on the purpose of SDP

    , adaptation of change

    , knowledge transfer program

    , have significant positive effects on supplier development maturity. Second, supplier development maturity has positive effects significantly on ERP activating diffusion
    . Finally, the causal relationships from ERP activating diffusion to SCM performance were significantly accepted. Its significance, as through the hypotheses, presented a structural model for the elaboration, suppliers develop maturity, and ultimately SCM performance that affect ERP leveraging spread beyond the concept of maturity of information system. Therefore, it was a mainstay of research on the existing ERP has they believed. Conclusion - First, with the fast changes in business circumstances, company should get the right information to implement SCM appropriately. For successful SCM, firms should understand the supplier development maturity formation and ERP activating diffusion. Second, supplier development factor has significant effects on supplier development maturity. Third, mediator such as supplier development maturity significantly affects ERP activating diffusion. Finally, ERP activating diffusion has significant impacts on SCM performance. This study makes a meaningful contribution to further appreciation on how supplier development maturity formation affects SCM performance. This study shows implications. First, there would not have been dealt with introducing the concept of supplier development maturity. Second, through empirical analysis and provider factors, the providers will develop the maturity that affect interactive factors between purchaser and supplier.

A Study on Derivation of Railway Software Safety Management Procedure (철도소프트웨어 안전성 관리체계 계시방안 연구)

  • Joung, Eui-Jin;Shin, Kyung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.10d
    • /
    • pp.244-246
    • /
    • 2006
  • Softwares in railway system are being used in the area of railway control system, directly associated to safety. Because the instinct characteristic of Software is uncertainty, Software development without safety insurance is very hazardous situation. In order to derive safety certification process in the railway system, certification and approval processes in the nuclear, aviation, and military area are studied. Software quality should be improved by two aspects : one is product aspect, another is process aspect. GS(Good Software) and ES(Excellent Software) certification can be exemplified in a product aspect approach. In those process certification, CMMI (Capability Maturity Model Integration) or SPICE (Software Process Improvement and Capability dEtermination : ISO/IEC15504) is being used as models for assessing process maturity of organization. Following the studies, safety management procedure in the railway system is suggested.

  • PDF

An Experimental Study on the Prediction Model for the Compressive Strength of Concrete with Blast Furnace Slag by Maturity Method (고로슬래그미분말 혼입 콘크리트의 적산온도를 이용한 강도예측모델에 관한 실험적 연구)

  • Yang, Hyun-Min;Cho, Myung-Won;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.107-108
    • /
    • 2012
  • The study on the strength prediction using Maturity is mainly focused on, but the study on the concrete mixing blast furnace slag powder is insufficient. The purpose of this study is to investigate the relationships between compressive strength and equivalent age by Maturity function and is to compare and examine the strength prediction of concrete mixing Blast Furnace Slag Power using ACI and Logistic Curve prediction equation. So it is intended that fundamental data are presented for quality management and process management of concrete mixing Blast Furnace Slag Power in the construction field.

  • PDF

Evaluation on the Prediction Model for the Compressive Strength of Concrete mixing Blast Furnace Slag Powder at early-aged by Maturity Method (적산온도에 의한 고로슬래그 미분말 혼입 콘크리트의 초기재령 압축강도의 예측 모델식 적용성 평가)

  • Yang, Hyun-Min;Park, Won-Jun;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.251-252
    • /
    • 2012
  • The exiting studies on the strength prediction by maturity method is mainly focused on concrete using OPC, meanwhile the study on the concrete mixing blast furnace slag powder (BFSP) is insufficient. The purpose of this study is to investigate the relationships between compressive strength and equivalent age by existing Maturity functions, i.e., Nurse-saul function Arrhenius function. This study also compared and examined the strength prediction of concrete mixing BGSP using ACI model and Logistic Curve prediction equation. Therefore, it is intended that fundamental data are presented for quality management and process management of concrete mixing BFSP.

  • PDF