Browse > Article

A Survey on Appraisal Methods of Maturity Level for Applying to Simulation-based Acquisition  

Park, Jinsoo (Dept. of Systems Management Engineering, Sungkyunkwan University)
Kim, Yun Bae (Dept. of Systems Management Engineering, Sungkyunkwan University)
Jung, Chul Woo (Dept. of Systems Management Engineering, Sungkyunkwan University)
Abstract
To improve M&S and SBA, it is important that their capability and maturity models should be developed. In general, capability and maturity models provide the standards for growth and improvement as well as the assessment on the organizational maturity level and the process capabilities, which are composed of a standard reference model and appraisal methods. In this paper, following introduction of a standard reference model for SBA in brief, we investigate some appraisal methods by survey and provide frameworks of appraisal method for SBA.
Keywords
modeling and simulation; simulation-based acquisition; capability and maturity model; maturity appraisal model;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Dunaway, D. K. and Masters, S., "$CMMI^{\circledR}$-Based Appraisal for Internal Process Improvement (CBA IPI) Version 1.2 Method Description," Software Engineering Institute, CMU/SEI-2001-TR-033, 2001.
2 Elaine, B. H., Keith, M. H. and Mark, C. P., "The eSCM- SP v2: Model Overview," CMU-ISRI-04-113, Carnegie Mellon, CMU-ITSOC-06-002, 2004.
3 ISO/IEC JTC1, "ISO/IEC TR 15504 Information Technology-software process assessment," ISO/ IEC, 2003.
4 Mark, C. P., Bill, C., Mary, B. C. and Charles, V. W., "Capability Maturity Modelsm for Software, Version 1.1," Software Engineering Institute, CMU/ SEI-93-TR-24, 1993.
5 SCAMPI Upgrade Team, "Standard CMMI Apraisal Method for Process Improvement (SCAMPISM) A, Version 1.3: Method Definition Document," Software Engineering Institute, CMU/SEI-2011-HB-001, 2011.
6 William, E. H. and Ethel, A. L., "The eSCM-CL v1.1: Model Overview," Carnegie Mellon, CMUITSOC- 06-002, 2006.
7 김도엽, 이철규, "국방 M&S 체계발전 방향," 정보처리학회지, 15권 6호, pp. 14-24, 2008.
8 박진수, 김윤배, 윤재욱, 김종원, "SBA 성숙도 측정모형에 관한 연구," 한국시뮬레이션학회 논문지, 제19권, 제4호, pp. 301-308, 2010.
9 방위사업청, "무기체계 획득단계별 M&S 적용지침," 방위사업청 지침 제2008-3호, 2008.
10 송찬호, "획득프로세스 혁신을 위한 모의기반획득(SBA) 체계 발전 방안," 국방과학연구소, 2006-84, 2006.
11 윤석준, "SBA 추진을 위한 국방 M&S 핵심기술," 정보과학회지 25권 11호, pp. 45-50, 2007.
12 윤재욱, "소프트웨어 프로세스 평가모형에 대한 비교 분석," 대한산업공학회 추계학술대회, 2001권, pp. 391-395, 2001.
13 최상영, "무기체계 연구개발 단계별 M&S 체계 소요 및 활용 방안," 국방대학교, 2007.
14 CMMI Product Team, "$CMMI^{\circledR}$ for Acquisition, Version 1.3," Software Engineering Institute, CMU/ SEI-2010-TR-032, 2010.
15 CMMI Product Team, "$CMMI^{\circledR}$ for Development, Version 1.3," Software Engineering Institute, CMU/ SEI-2010-TR-033, 2010.
16 CMMI Product Team, "$CMMI^{\circledR}$ for Service, Version 1.3," Software Engineering Institute, CMU/SEI- 2010-TR-034 , 2010.