• Title/Summary/Keyword: preventive maintenance cost

Search Result 173, Processing Time 0.025 seconds

An Analysis of Maintenance Cost of Preventive Optimized-Rehabilitation Area Method in Asphalt Concrete Pavement (예방적 최소단면 보수공법 적용 아스팔트 도로포장의 유지관리 비용분석)

  • Kim, Nak-Seok;Hong, Eun-Cheol
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.4
    • /
    • pp.45-51
    • /
    • 2009
  • The paper presents the economic analysis of optimized-rehabilitation area method considered as one of the preventive maintenance methods in asphalt concrete pavement. The optimized-rehabilitation area was selected based on the analysis of traffic lane characteristics. The main concept of the selected method was to minimize the maintenance cost. The effective width of traffic lane in this method was 70 cm of each wheel path. According to the traffic survey conducted in this research, more than 95% of vehicles passed within the width of each wheel path. The new preventive optimized-rehabilitation area method showed less maintenance cost than the conventional overlay. In addition, traffic congestions and the user cost can be reduced. The research results revealed that the total maintenance cost was reduced by 35% by using the new method compare to the conventional one.

A Study of Optimal Maintenance Schedules of a System under the Periodic Inspection Policy (주기적인 검사 정책하에서 최적예방 교체시기 결정에 관한 연구)

  • 정현태;김제승
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.44
    • /
    • pp.263-271
    • /
    • 1997
  • This paper presents a preventive maintenance model for determining the preventive replacement period of a system in which a failure rate is affected by the cumulative damage of fault and inspection. Especially, the failure rate function is considered to be a function of the cumulative damage of the fault and inspection time. Types of replacement considered are preventive replacement and failure replacement. Failure rate and expected cost function between replacement are derived. An optimal policy is obtained that minimizes the average cost per unit time for preventive replacement, failure replacement, inspection and repair.

  • PDF

Preventive Maintenance Policies for a System with Two Types of Units Subject to Deterioration

  • Kwon, Y.I.;Bai, D.S.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.8 no.2
    • /
    • pp.33-36
    • /
    • 1982
  • This paper considers preventive maintenance policies for a system with two types of units which is subject to deterioration. Two generalized models are investigated ; a preventive maintenance policy based on the cumulative operating time and a policy based on the number of minimal repairs performed. Optimal preventive maintenance policies which minimize the expected average cost per unit time including the earning loss due to the deterioration are discussed and some numerical examples are given.

  • PDF

Field Performance Evaluation of Preventive Maintenance Methods (예방적 유지보수 공법의 현장 적용성능 평가 연구)

  • Lee, Sang Yum
    • International Journal of Highway Engineering
    • /
    • v.19 no.2
    • /
    • pp.103-112
    • /
    • 2017
  • PURPOSES : In this study, field performance evaluation of crack treatment of pavement and the feasibility of surface treatment of pavement are presented. The performance and cost of preventive maintenance methods have been previously verified, and the methods are being used in many developed countries and cities. However, the performance and cost of the system have not been verified in domestic, field applications. Therefore, in order to improve performance, the field performance is evaluated, and a reasonable cost is proposed. METHODS : Visual Inspection was conducted to evaluate the field application and performance of the preventive maintenance method. In addition, the PCI index was calculated from the results of visual inspection of the application area of the surface treatment method, and the performance life of each method was predicted. For the economic evaluation, life cycle cost analysis was performed using the life cycle cost analysis program. RESULTS :In order to evaluate and quantify the field performance of crack repair material, the residue condition of the pavement surface after crack treatment, rather than the performance of the material, is evaluated. In addition, the crack resistance and performance life of surface treatment methods are evaluated. The cost of currently available treatment methods are compared to the common pavement cut and overlay method, and it is determined that the preventive method is not economical based on life cycle cost analysis. CONCLUSIONS :Because of the characteristics of cracking, it is necessary to conduct the evaluation of currently applied methods and the analysis of the cause of damage, by visual inspection. Moreover, in order to evaluate the performance and economic suitability of the currently applied surface treatment methods, it is necessary to acquire information on application sections by monitoring their long-term conditions and performance.

Cost Models for Warranty and Preventive Maintenance

  • Kim, Che-Soong
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.7 no.1
    • /
    • pp.66-74
    • /
    • 2002
  • Warranty cost analysis for one-dimensional warranties assumes that the usage intensity (or rate) is the same for all buyers. In real life the usage intensity varies across the population of buyers. Also for products sold with warranty, preventive maintenance actions by manufacturers and buyers have a significant impact on the total costs for both parties. In this paper we deals with models to study the expected warranty cost for products with free repairable warranty with varying usage intensity and three types of preventive maintenance. We also review the literature which links warranty and maintenance and develops a framework to define new topics for research in the future and examines a new model formulation. It then develops a new model and carries out its analysis.

  • PDF

On determining a non-periodic preventive maintenance schedule using the failure rate threshold for a repairable system

  • Lee, Juhyun;Park, Jihyun;Ahn, Suneung
    • Smart Structures and Systems
    • /
    • v.22 no.2
    • /
    • pp.151-159
    • /
    • 2018
  • Maintenance activities are regarded as a key part of the repairable deteriorating system because they maintain the equipment in good condition. In practice, many maintenance policies are used in engineering fields to reduce unexpected failures and slow down the deterioration of the system. However, in traditional maintenance policies, maintenance activities have often been assumed to be performed at the same time interval, which may result in higher operational costs and more system failures. Thus, this study presents two non-periodic preventive maintenance (PM) policies for repairable deteriorating systems, employing the failure rate of the system as a conditional variable. In the proposed PM models, the failure rate of the system was restored via the failure rate reduction factors after imperfect PM activities. Operational costs were also considered, which increased along with the operating time of the system and the frequency of PM activities to reflect the deterioration process of the system. A numerical example was provided to illustrate the proposed PM policy. The results showed that PM activities performed at a low failure rate threshold slowed down the degradation of the system and thus extended the system lifetime. Moreover, when the operational cost was considered in the proposed maintenance scheme, the system replacement was more cost-effective than frequent PM activities in the severely degraded system.

Economic Assesment for Track Ballast Structures based on Proper Maintenance Level (적정 유지관리수준에 기초한 궤도도상구조에 대한 경제성 검토)

  • Baek, Jae-Wook;Joo, Hwan-Joong;Song, Yoo-Seob;Park, Tae-Hyo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.167-178
    • /
    • 2007
  • In general, it is known that the concrete ballast track is possible to reduce a cost of maintenance activities cause of maintenance free by restrictive maintenance in application of track ballast structures. However, if deteriorations and fracture mechanism of a material are considered, proper maintenance activities and repairing are continually required. For the problems, we evaluated an economical efficiency of the gravel ballast and the concrete ballast on a proper level of maintenance activities. As the method based on history path is difficult to obtain sufficient reliabilities cause of an absence of real data for maintenance activities, we chose the delphi survey method by professional group, and we obtained the appropriate index and profiles for maintenance activities. As a result, we founded that effects for cost reduction can be expected by preventive maintenance management, and we proposed economical restrictions and life cycle cost for track ballast structures in a life cycle.

Preventive Maintenance Scheduling Guide

  • Park, Kyung-S.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.1 no.1
    • /
    • pp.93-98
    • /
    • 1975
  • This paper presents a generalized model for determining minimum cost preventive maintenance schedules where accurate failure data are not available except the "average"(mean) and the "typical" value(mode) of the component lifetime.

  • PDF

Scheduling of Preventive Maintenance for Generating Unit Considering Condition of System (시스템의 상태를 고려한 발전설비의 예방 유지보수 계획 수립)

  • Shin, Jun-Seok;Byeon, Yoong-Tae;Kim, Jin-O;Kim, Hyung-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.8
    • /
    • pp.1305-1310
    • /
    • 2008
  • Traditional maintenance planning is based on a constant maintenance interval for equipment life. In order to consider economic aspect for time based preventive maintenance, preventive maintenance is desirable to be scheduled by RCM(Reliability-Centered Maintenance) evaluation. The main objective of RCM is to reduce the maintenance cost, by focusing on the most important functions of the system and avoiding or removing maintenance actions that are not strictly necessary. So, Markov state model is utilized considering stochastic state in RCM. In this paper, a Markov state model which can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by the stepwise Markov model in detail. Also, because the system is not continuously monitored, the inspection is considered. In case study, simulation results about RCM will be shown using the real historical data of combustion turbine generating unit in Korean power systems.

A Study on the Decision of an Optimal Maintenance Period for Ship's Machinery Items using the Cumulative Hazard Rate Function for Weibull Distribution (Weibull형 고장분포를 갖는 선박용 부품의 최적 보전시기의 결정수법에 관한 연구)

  • 유희한
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.24 no.2
    • /
    • pp.90-96
    • /
    • 2000
  • The technology of preventive maintenance and corrective maintenance is widely applied to ships in order to maintain the good voyageable condition. One of the most important fields of marine engineering is to seek the maximum availability and to solve the stochastic maintenance problem such that the cost for corrective maintenance is minimized. Accordingly, for the purpose of making the most suitable maintenance schedule which minimizes the expected cost function, this paper suggests the method to grasp the failure characteristics by the ship's maintenance data that are collected from the past. And, suggests the method to estimate the optimal maintenance interval by using the dynamic programming and the cumulative hazard rate function attained from the maintenance data.

  • PDF