• Title/Summary/Keyword: preliminary feasibility studies

Search Result 60, Processing Time 0.027 seconds

Development of a Framework for Estimating the Benefits of IT Projects : Focusing on Preliminary Feasibility Study (정보화 사업의 편익 추정 프레임워크 개발 : 정보화부문 예비타당성조사를 중심으로)

  • Lee, Chunghun
    • Journal of Information Technology Services
    • /
    • v.17 no.3
    • /
    • pp.101-115
    • /
    • 2018
  • In order to promote the IT business efficiently, the Preliminary Feasibility Study has been conducted since 2004. It is to verify the feasibility of a large-scale IT project in advance and to determine whether to reflect the budget. It is more difficult to analyze the benefits of the IT project than other projects, because the IT project is carried out by combining tangible and intangible assets and human resources. For this reason, the Standard Guideline for Preliminary Feasibility Study in the IT field suggests a framework to support in estimating the benefits of the IT project. However, it includes the following problems : 1) level discrepancy among the benefit categories, 2) lack of types of benefit items, 3) no consideration of benefit inducing factors. So the framework is facing a low utilization. This study develops a new framework through a three-step research process. The new framework can be used not only for preliminary feasibility studies but also for estimating the benefits of general IT projects.

Preliminary Feasibility Study for Water Resources Policy Effect Analysis Direction (수자원분야 예비타당성 조사 정책효과 분석 방향)

  • Seong, Yeonjeong;Choi, Seungan;Kwon, Hyun-Han;Jung, Younghun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.14 no.3
    • /
    • pp.1-16
    • /
    • 2021
  • Recently, large-scale projects are required in the water resources sector considering safety and publicitythe due to uncertainty of securing water resources and changes in the ecological environment by climate change. Among these large-scale projects, the projects that fall under the preliminary feasibility study are determined by comprehensive analysis based on economic analysis, policy analysis, and balanced regional development analysis. However, most of the results of the preliminary feasibility study showed a tendency to depend heavily on economic analysis. For this reason, projects in non-metropolitan areas sometimes fail in the preliminary feasibility study. To supplement this point, the Korea Development Institute revised the standard guidelines for preliminary feasibility studies for water resources sector projects that place a high weight on policy feasibility analysis. Therefore, the objective of this study is to analyze the cases of the preliminary feasibility study conducted previously and to suggest the direction of policy analysis in the preliminary feasibility study for water resources sector projects. For this, we analyze preliminary feasibility studies conducted for 18 years from 2002 to 2019, and suggest direction of policy analysis method using the benefit items not included in the economic analysis.

A Study of the Benefit Cost of The Railway Nosie (철도소음의 편익비용 추정)

  • Park, Byung-Eun;Jang, Bong-Hee;Han, Sung-Woo;Kim, Dong-Gi;Park, Kwang-Heyun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.1465-1468
    • /
    • 2006
  • Railway is superior to the other land transportation systems in aspects of environmental problems. Environmental problems are not considered during a preliminary feasibility study. Investment for railway is low because of low B/C(benefit/cost)ratio in the economical efficiency analysis during the preliminary feasibility study. The body of this paper studies the railway noise which can reflect environmental problems an assessment of environmental impact. The body of this paper studies the presumption of The Benefit Cost of railroad noise arresting it will be able to reflect the evaluation environmental matter of the effect which it gives to an environment.

  • PDF

Preliminary Feasibility Study on Wind and Solar Hybrid Power Systems based on Venturi Effects for Buildings (벤투리 효과를 활용한 도심형 건물용 하이브리드 풍력 및 태양광 발전 시스템 기초타당성 예비연구)

  • Suhyun Kim;Yoonsoo Kim;Sumin Park;Jihyeon An;Sanghun Lee
    • New & Renewable Energy
    • /
    • v.19 no.1
    • /
    • pp.22-30
    • /
    • 2023
  • Recently, the use of renewable energy has been increasing to achieve carbon neutrality. The concept of a zero-energy building is also attracting attention. In this study, a preliminary study was conducted to analyze the feasibility of a hybrid wind and solar power generation system between buildings that utilize the building wind generated by the Venturi effect. For this purpose, the wind speed and sunshine hours were monitored in the area where the building wind blows by the Venturi effect, and the power generation depending on system types, areas, and season was estimated. Consequently, the wind power generation system showed a larger amount of power per area than solar power. The wind power systems can generate larger power if wind power blades are installed along the height of the building. As a preliminary study, this study verified the feasibility of the system utilizing building wind and suggested follow-up studies.

A Development of Quantitative Analysis Model for the Policy Analysis in Feasibility Study Using the Performance Assessment Method (성능평가기법을 활용한 타당성조사 정책적 분석단계의 정량적 의사결정모델 개발 - 복수대안의 타당성 평가를 중심으로 -)

  • Lim, Yong-Soo;Song, Hyun-Young;Jeong, Han-Kee;Jeong, Min-Chul;Kong, Jung-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.89-100
    • /
    • 2011
  • As an impactive factor on industries and national economy, The Social Overhead Capital(SOC) is major factor to determine the national competitiveness and the investment of SOC is essential for its economic growth. Accordingly, introduction of the preliminary feasibility study and establishment of legal institutionalization and evaluation system has been carried out and reviewed since 1999. Nevertheless of these efforts, basic problems such as lack of scientific method for investment evaluation and loss of effectiveness on feasibility studies are continuously being brought up. Moreover, as the preliminary study to improve the mentioned problems is mainly focused on the economic and estimated demand analysis, the study of policy analysis, the most important phase during a feasibility study, is still insufficient. Therefore, in this paper, a quantitative decision-making model, to which the performance assessment method of Value Engineering(VE) is applied, is developed and proposed to improve the policy analysis of (preliminary) feasibility study that requires combining with relative studies, to induce quantitative analysis method, and to contribute the improvement of value on the political aspect for SOC investment goals and use as a strategic decision-making method by systematic analysis.

A study on the status and improvement of preliminary feasibility study of culture and tourism projects (문화.관광부분사업의 예비타당성조사 실태분석 및 개선방안 연구 -운용관리비용 분석을 중심으로-)

  • Sun, Shu-Li;Kim, Ju-Hyung;Shin, Sung-Wooi;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.129-138
    • /
    • 2007
  • According to the preceding research outcomes, feasibility studies on public construction projects were incorrect and subjective. To resolve the problems, Korean government initiated Preliminary Feasibility Study (PFS) system prior to undertaking the main feasibility study. The PSF can be categorized into four areas such as road, railroad, harbor, airport, and Culture & Tourism (C&T). Especially when it comes to complex due to the introduction of five-weekday working system and local $government^{\circ}{\phi}s$ self administrative system. As a result, the standardization and legislation of the PSF can not be operated effectively. Accordingly this paper seeks to 1) identify actual condition of conducted PSF in C&T; 2) set up analytical model considering cost factor of economical efficiency and seek obstacles of PSF system; 3) suggest improvement plan for construction PSF projects.

A Study of Noise Elect for Selecting Eco-friendly Railways (철도노선 선정에 미치는 소음에 관한 연구)

  • Park, Byung-Eun;Kim, Myeong-Gyu;Han, Sung-Woo;Kim, Dong-Gi;Park, Kwang-Heyun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.244-247
    • /
    • 2006
  • Railway is superior to the other land transportation systems in aspects of energy efficiency and environmental problems. Energy efficiency and environmental problems are not considered during a preliminary feasibility study. Investment for railway is low because of low B/C in the economical efficiency analysis during the preliminary feasibility study. The body of this paper studies the data which can reflect environmental problems an assessment of environmental impact. Investment for railway would be higher when main environmental elements are considered before the choice of the railway lines.

  • PDF

A Study on Improvement of Feasibility Evaluation for Public Projects (공공사업 타당성 평가의 개선 방안에 관한 연구)

  • Park, Seung-Jun
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.2
    • /
    • pp.163-168
    • /
    • 2017
  • The feasibility evaluation of public projects has been carried out mainly in the economic analysis. However, items of political, technological and balanced regional development aspects are further evaluated by applying analytic hierarchy process, This paper suggests to analyzes preliminary feasibility study of construction and research & development project during the past three years and to verify correlation between B/C ratio and AHP weight. The result shows that the correlation between cost benefit ratio and the weight of the hierarchy is 0.744 in construction projects and 0.899 in research & development project. Namely, AHP weight be under the control of B/C ratio and is devoted to its role against expectation. Therefore it must be sufficiently discussed in various designs of studies to maximize the effects of AHP analysis.

GIS-based Preliminary Feasibility Study for the Optimal Route Selection for China-India Railway through Nepal

  • Acharya, Tri Dev;Yang, In Tae;Lee, Dong Ha
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.35 no.4
    • /
    • pp.281-290
    • /
    • 2017
  • Transportation plays a vital role in sustainable development, and moreover, bulk transportation provides cost effective movement of goods and human beings with less environmental issues. Nepal is a developing country with increasing urbanization and transportation demands. The growing interest of China to connect with Southeast Asia through Nepal has led to ambitious project proposal of Rasuwa Gadhi to Birgunj Railways, which is the shortest route from China to India. Lack of updated geospatial data has lead the concerned authorities in Nepal to be dependent on analysis and proposals from donor nations. Taking such considerations, based on GIS and free data, this study explores optimal routes to connect cites using slope and land cover. Based on reclassified slope, two shortest optimal routes were found. One passing through Baireni in Dhading and another through Kathmandu towards Birgunj with length of around 172 Kilometers. The study shows that available open source data can be used of preliminary feasibility studies and yet shows limitations for detailed economy based planning. Development and use of high resolution updated geospatial data is of high necessity for Nepal to become self-sustained in planning of development works.

Theory and Methods for the Evaluation of Environmental Resources (환경자원의 가치평가 이론과 주요 방법)

  • Kim, Joon-Soon
    • Journal of Forest and Environmental Science
    • /
    • v.19 no.1
    • /
    • pp.108-123
    • /
    • 2003
  • The importance of environmental resources has been recognized over the world after Rio declaration(1992). so it is moved to monetarize environmental resources. The studies on the evaluation of nonmarket goods began also in the early 1990 in Korea. In practice the preliminary feasibility studies(PFS) are carried out since 1999 in case of major public investments projects. In PFS the Benefit-Cost analysis is practically used. which is considering the evaluation of environmental resources. But the methods for the evaluation have not been fixed up. In this study It is introduced to the theory and major methods for the evaluation of environmental resources. In the theory the evaluation is handled in aspect of demand function and supply function. The optimum level can be extracted from the two functions. In the method. travel cost method(TCM), hedonic price method(HPM) and contingent valuation method(CVM) are introduced according to the market structures.

  • PDF