• 제목/요약/키워드: preliminary cost estimation

검색결과 60건 처리시간 0.023초

복합용도 개발 도시재생 사업에서의 단위 공간 기반 개산견적 모델링 가이드 제안 - ○○시 ○○역 복합환승센터 사례를 중심으로 - (A Proposal of Modeling Guide of the Unit Space-based Preliminary Cost Estimation in Urban Renewal Mix-Used Development - Case Study on ○○ Transfer Station Complex -)

  • 강신엽;안재홍;김주형
    • 한국BIM학회 논문집
    • /
    • 제3권1호
    • /
    • pp.11-20
    • /
    • 2013
  • Mix-used development in urban renewal project is done to effectively utilize the limited downtown. Generally unlike a single project, It features placing a large number of different facilities(residential, commercial, business, cultural, etc.) which is each other organically linked. The purpose of this study is to suggest the method of modeling guide for 3D preliminary cost estimation considering visual and intuitive judgement of space in mix-used development Urban Renewal project. In this research, introducing SME(Standard Module and Element) breakdown structure, FID(Finish Identity) for estimating building space unit-based quantity take off was implemented. It could narrow the discrepancy of opinion between the stakeholders with more accurate cost-estimates, comparing to the traditional methods.

회전익 항공기의 기본설계 및 가격예측 연구 (Preliminary design and cost estimation of helicopters)

  • 이충연;고광호;정성남;유영훈
    • 한국항공우주학회지
    • /
    • 제38권4호
    • /
    • pp.309-314
    • /
    • 2010
  • 기본설계 단계에서 회전익 항공기의 가격을 보다 정확하게 예측하기 위해서 Harris & Scully에 의해 제시된 가격 예측 식을 최신의 추세식으로 수정하였다. 이를 위해 1997년 이후의 총 74개에 대한 회전익기 가격 및 제원 정보를 이용하여 가격 예측 식을 업데이트하였다. 업데이트 된 가격 예측식을 Tishchenko의 기본설계 기법과 통합하여 기본설계 단계에서 가격을 고려하도록 구성하였다. 본 기본설계 및 가격예측 프로그램을 현재 운용되고 있는 미국 Sikorsky사의 S-76C+를 비롯한 여러 기종의 헬리콥터에 적용하여 가격과 제원 결과를 도출하고 검증하여 본 연구의 유효성을 확인하였다.

RC라멘교의 기본설계단계 개략공사비 산정모델 (The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge)

  • 김병수;권석현
    • 한국건설관리학회논문집
    • /
    • 제10권2호
    • /
    • pp.111-120
    • /
    • 2009
  • 건설공사에 소요되는 공사비의 개략적인 산정은 건설프로젝트의 계획단계뿐만 아니라 기본설계단계에서 예산을 확정하기 위해서 필수적이다. 현재 국내의 개략공사비 산정모델은 단위길이당 단가 또는 단위면적당의 단가를 이용하여 계산하는 선형적인 단순 모델로써 오차율이 너무 큰 문제점이 있다. 본 연구에서는 과다한 오차율의 문제를 해결하기 위하여 RC라멘교의 특성을 고려하였으며 공사비의 변동특성에 따라 그룹핑(Grouping) 및 대표물량방식 그리고 합성단가를 사용한 모델을 개발하였다. 본 연구의 결과 실제 설계공사비와의 오차를 상당히 줄일 수 있었으며 따라서 발주처나 용역업체에서 RC라멘교의 예산을 산정하는데 기여할 것으로 기대한다.

스마트건설 공사비산정기준 사례조사 연구 - 일본사례를 중심으로 - (Case Study on the Cost Estimation standard for Smart Construction - Focused on Japan)

  • 송태석;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2020
  • Recently, the need for smart construction technologies related to the Fourth Industrial Revolution has been increasing in order to improve productivity of the construction industry. The Ministry of Land, Infrastructure and Transport has established Smart construction technology road map to commercialize the smart construction, and research and development is also underway. However, due to the lack of cost estimation standards for such smart construction technologies to be deployed to actual sites, smart construction technologies are not actively applied to construction sites. In particular, cost estimation standards are needed for construction machinery equipment with ICT technology that is currently available for commercialization. Therefore, as a preliminary study for the development of smart construction cost estimation standards, a case study was conducted on ICT construction estimation standards in Japan and present them as basic data for standards in Korea.

  • PDF

BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안 (Improvement of BoQ Documents for the BIM based Quantity Takeoff)

  • 안지원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제7권2호
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

LCA 및 LCC를 고려한 환경친화적 리모델링의 평가방법에 관한 연구 (A Study on the Evaluation Method of Green Remodeling Considering LCA and LCC)

  • 이관호;김남규;이언구
    • 한국태양에너지학회 논문집
    • /
    • 제23권1호
    • /
    • pp.57-67
    • /
    • 2003
  • This study aims to presents Evaluation Method of Green Remodeling that analyze the value of environment through expense, using the method of life cycle cost and life cycle assessment simultaneously. The results of this study are summarized as follows. Evaluation Model developed in this study can convert economical value of environment into cost by integrating. In addition, the model can apply as a useful tool to estimation of economical design alternative as well as quantification of environmental loads and costs. Evaluation Model presented In this study observe energy consumption and the environmental load emission with qualification, it can forecast effect of environmental cost that cost estimation is expected to be added to energy cost rate by being possible. Synthetically, when Estimation Model and computer program that developed in this study is applies to the construction industry; reasonable management of environmental load is convenient at each step of Green Remodeling. In addition, at preliminary design phase, practical use may be possible by reasonable yardstick about various alternatives and improvement of design alternatives likewise by grasping environmental effect.

TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발 (Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM)

  • 한승희;박홍태
    • 한국산학기술학회논문지
    • /
    • 제14권3호
    • /
    • pp.1474-1480
    • /
    • 2013
  • 본 연구는 TBM 공법의 구경별 자원기반 적산(원가 계산) 방식에 의한 공사비 적산을 수행하여 직접공사비와 총공사비를 분석하고, 이를 근거로 회귀분석을 수행하여 TBM 공법 구경별 직접공사비 및 총공사비를 추정할 수 있는 개산 공사비(개략 공사비) 예측 식 모델을 제시하였다. 본 연구에서 제시한 TBM 공법의 구경별 개산 공사비 예측 식 모델은 향후 TBM 공법 적용 현장의 사업기획, 예비조사, 타당성조사, 기본설계 단계에서 개산 공사비를 추정하는데 효과적으로 적용할 수 있을 것이다.

BIM/GIS 기반 도로 개략공사비 산정 프로토타입 연구 (Roadway Preliminary Cost Estimation Prototype based on BIM and GIS)

  • 박원영;강태경;이유섭
    • 한국건설관리학회논문집
    • /
    • 제14권6호
    • /
    • pp.14-21
    • /
    • 2013
  • 완성된 도면과 시방서를 기초로 산출한 상세한 물량 정보를 토대로 상세 공사비를 예측하는 업무에 비해 도면과 시방서가 완성되기 이전 단계에서 시설제원이나 개략적인 설계 정보 등을 기초로 개략공사비를 예측하는 업무는 공사비 예측 업무 담당자의 주관적인 판단에 의존하는 경향이 크고 객관성이 낮은 실정이다. 본 연구에서는 도로건설공사 초기단계에서의 사업비 예측 모델을 연구하고 이를 토대로 건설공사 개략공사비 예측 시스템을 개발하였다. 이 시스템은 BIM 및 GIS를 이용하여 사업 초기단계 개략적인 노선선정에 따른 개략공사비 추정에 있어 사례기반추론을 기반으로 사업비 예측의 정확성 향상과 업무 선진화에 기여할 것으로 기대된다. 또한 사용자가 인터넷을 통해 편리하게 접근할 수 있고 객관적이면서 일관성 있는 개략공사비 예측 결과를 제공받을 수 있으므로 업무 투명성 측면의 효과도 기대할 수 있을 것이다.

교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구 (A Study on the Model of Artificial Neural Network for Construction Cost Estimation of Educational Facilities at Conceptual Stage)

  • 손재호;김청융
    • 한국건설관리학회논문집
    • /
    • 제7권4호
    • /
    • pp.91-99
    • /
    • 2006
  • 본 연구는 신축 교육시설 프로젝트의 개념단계에서 공사비를 예측하기 위한 인공신경망모델의 제안을 목적으로 한다. 현행 공공 교육시설의 개념단계 공사비예측에는 기본인자인 연면적에 의한 단일변수 모델이 적용되고 있다. 그러나 개념단계에서 단일변수 공사비예측모델을 적용하여 예측된 공사비는 그 오차범위가 크고, 실시설계 완료 후 물량산출에 의해 산정된 상세공사비와 비교하여 큰 차이를 보일 경우 프로젝트의 수정이 불가피하며, 이는 프로젝트의 비용을 증가시키고 공기를 지연시킨다. 그러므로 본 연구에서는 교육시설 프로젝트의 사업계획 수립 및 예산확보 과정에서 공사비예측에 적용이 가능한다 변수 인공신경망모델을 제안하였다. 개발된 모델을 평가한 결과 평균오차율이 6.82%로써, 평균 93.18%의 정확도를 기록하였다. 제안된 인공신경망모델은 지난 5년간 신축된 교육시설의 공사예정금액을 실적자료로 사용하여 학습되었기 때문에, 차후 교육시설 신축공사의 예산편성에 그 활용이 기대된다.