References
- Allian A. (1992). Cost Studies of Building, Pearson Prentice Hall
- Allan, A. and Keith, H. (2007). Willis's Practice and Procedure for the Quantity Surveyor, Blackwell Publishing
- Choi, I. S., etc. (1999). "A Study on the Prediction Model of Construction Cost in High-Rise Office Building of SRC Type", Journal of the Architectural Institute of Korea Structure & Construction, 15(7), pp. 143-150
- Construction Industry Institute (1986). Constructability - a Primer CII, University of Texas at Austin
- Douglas, J. F., Peter, S. B. and Jonathan, D. F. (1999). Cost Planning of Buildings, Blackwell Science
- Ferry D. J. (1991), Cost Planning of Buildings, Oxford
- Kang, T. K., etc. (2011). Development of Construction Cost Estimating System for Public Construction Projects in Korea, MLTM
- Kang, T. K., Park, W. and Lee, Y. S. (2011). "Development of CBR-based road construction project cost estimation system." ISARC 2001, IAARC and KICEM, Seoul, Republic of Korea
- KDI (2004). Standard Guidelines for Feasibility Study in Roadway and Railway 4th Edition, Korea Development Institute
- Kim, K. H. (2004). "Construction cost prediction system based on artificial intelligence at the project planning stage", PhD thesis, Korea Univ., Seoul, Republic of Korea
- Kim, K. H. and Kang, K. I. (2003). "A Study on Model of Neural Networks Training by Genetic Algorithms for Predicting Cost Estimates of Apartment Projects at the Early Project Stage", Journal of the Architectural Institute of Korea Structure & Construction, 19(10), pp. 133-142
- Kim, K. H. and Kang, K. I. (2004-a). "A Study on Predicting Cost Estimation of Apartment Building Using Neural Network's Architecture Optimized by Genetic Algorithms", Journal of the Architectural Institute of Korea Structure & Construction, 20(2), pp. 81-88
- Kim, K. H. and Kang, K. I. (2004-b). "A Study on Predicting Construction Cost of Apartment Housing Projects Based on Case Based Reasoning Technique at the Early Project Stage", journal of the architectural institute of korea structure&construction, 20(5), pp. 83-92
- Kim, S. K. and Ku, I, W. (2000). "A Neural Network Cost Model for Office Buildings", Journal of the Architectural Institute of Korea Structure & Construction, 16(9), pp.59-67
- Kim, S. K., etc. (2000). "A Statistical Cost Model for Road Construction Project at the Planning Stage", Journal of the Korean Society of Civil Engineers, 20(2-D)
- Lee, Y. S. (2003). "Development of Construction Cost Model through the Analysis of Critical Work Items", Korean Journal of Construction Engineering and Management, 4(4), pp. 212-219
- Lee, Y. S., etc. (2012). Development of Construction Project Management Technology based on BIM/GIS Platform, KICT
- Lee, H. S., etc. (2012). "Conceptual Cost Estimating System Development for Public Apartment Projects", Korean journal of Construction Engineering and Management, 13(4), pp. 152-163 https://doi.org/10.6106/KJCEM.2012.13.4.152
- MLTM (2008). Best Practices for the National Roadway Construction, Ministry of Land, Transport & Maritime Affairs of Korean government
- MLTM (2011). Road Services Manual 2011, Ministry of Land, Transport & Maritime Affairs of Korean government
- Park, W. Y., Cha, J. H. and Kang, K, I. (2002). "A Neural Network Cost Model for Apartment Housing Projects in the Initial Stage", Journal of the Architectural Institute of Korea Structure & Construction, 18(7), pp. 155-162
- Rodney D. S., Richard M. J. (1995). Cost Estimator's Reference Manual, John Wiley&Sons
Cited by
- Derivation of BIM/GIS Platform Application Scenarios and Definition of Specific Functions in Construction Planning and Design vol.15, pp.12, 2014, https://doi.org/10.5762/KAIS.2014.15.12.7340