• 제목/요약/키워드: precast-concrete construction

검색결과 511건 처리시간 0.024초

급속 시공을 위한 일체형 프리캐스트 바닥판의 구조성능 평가 (Evaluation of structural performance in integrated precast decks for a rapid construction)

  • 이상열
    • 복합신소재구조학회 논문집
    • /
    • 제6권3호
    • /
    • pp.14-19
    • /
    • 2015
  • In this study we developed an integrated precast concrete decks for a rapid construction. The structural performance in the integrated precast bridge decks is evaluated by real-scale test bed and detailed finite element analyses. The numerical analysis results were compared with the experimental data from a real-scaled single-span precast/prestressed concrete bridge decks under truck loading. Parametric studies are focused on the various effects of external loads on the structural behavior for different locations and measuring points on the precast bridge decks. The assessment in this study indicates that the integrated precast bridge decks show an excellent structural performance as expected.

PC 부재의 현장 생산효과 분석 (In-situ Production Effect Analysis of Precast Concrete Elements)

  • 이동주;오진혁;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2021
  • PC (Precast Concrete) method was preferred for reasons such as shortening of construction period, cost reduction, and quality. However, in the case of factory production, precast concrete has a problem in that transportation conditions in the transportation process, damage during transportation, overhead and profit of the factory are required. If work and PC members are produced on site, transportation and installation costs can be reduced. However, research on field production has not been conducted. Therefore, based on the on-site production plan without PC, the cost and quality of factory production and on-site production are compared and analyzed.

  • PDF

보수용 조립식 콘크리트 포장 적용성 및 슬래브 접합 방식 분석 (Evaluation of Pavement Rehabilitation Using Precast Concrete Slabs and Slab Connection methods)

  • 조영교;오한진;황주환;김성민;박성기
    • 한국도로학회논문집
    • /
    • 제12권4호
    • /
    • pp.165-174
    • /
    • 2010
  • 본 연구는 조립식 콘크리트 포장 공법을 이용한 급속 도로 포장 보수 방법의 적용성을 분석하기 위하여 시험시공을 수행하고, 슬래브 접합 방식의 효과를 분석하기 위해 수행되었다. 시험시공은 줄눈콘크리트포장의 4개 슬래브를 교체하는 것으로 하였다. 시험시공을 위해 프리캐스트 슬래브를 설계하고 제작한 후, 기존 슬래브를 커팅하여 제거한 후 이 곳에 제작한 슬래브를 안착시켰다. 그 후 평탄성을 조절한 후 포켓 및 홀 부분과 슬래브 하부의 공간을 그라우팅 함으로써 시공을 신속 용이하게 수행할 수 있었다. 시험 시공을 수행하며 보수용 프리캐스트 포장의 설계 및 시공과 관련된 세부 사항을 면밀히 분석하였다. 또한 슬래브 간의 연결을 위한 방식으로 포켓과 홀 접합 방식을 모두 적용해 보았으며 실험을 통해 두 접합 방식에서의 슬래브의 컬링 거동을 비교하였다. 연구 결과 두 방식 모두 적용성이 우수했으나, 홀 접합 방식이 보다 적절한 것으로 파악되었다.

PC 기둥-H형강보의 볼트접합부에 관한 실험적 연구 (An Experimental Study on The Bolted Connection Between H-Beam and Precast-Concrete Column)

  • 조은영;박순규
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2003년도 가을 학술발표회 논문집
    • /
    • pp.181-185
    • /
    • 2003
  • The composite structural system with reinforced concrete column and steel beam has some advantages in the structural efficiency by complementing the shortcomings between the two systems. The system, however, has also a lot of problems in earthquake-proof capacity and construction process because it is wet method of construction. So, this paper proposed PCS(Precast Concrete Column and Steel Beam) structural system with dry method of construction. Purpose of this study is to enhance merit and control failure mechanism by installing Dog-Bone on H-beam.

  • PDF

Seismic performance of self-sustaining precast wide beam-column connections for fast construction

  • Wei Zhang;Seonhoon Kim;Deuckhang Lee;Dichuan Zhang;Jong Kim
    • Computers and Concrete
    • /
    • 제32권3호
    • /
    • pp.339-349
    • /
    • 2023
  • Fast-built construction is a key feature for successful applications of precast concrete (PC) moment frame system in recent construction practices. To this end, by introducing some unique splicing details in precast connections, especially between PC columns including panel zones, use of temporary supports and bracings can be minimized based on their self-sustaining nature. In addition, precast wide beams are commonly adopted for better economic feasibility. In this study, three self-sustaining precast concrete (PC) wide beam-column connection specimens were fabricated and tested under reversed cyclic loadings, and their seismic performances were quantitatively evaluated in terms of strength, ductility, failure modes, energy dissipation and stiffness degradation. Test results were compared with ASCE 41-17 nonlinear modeling curves and its corresponding acceptance criteria. On this basis, an improved macro modeling method was explored for a more accurate simulation. It appeared that all the test specimens fully satisfy the acceptance criteria, but the implicit joint model recommended in ASCE 41-17 tends to underestimate the joint shear stiffness of PC wide beam-column connection. While, the explicit joint model along with concentrated plastic hinge modeling technique is able to present better accuracy in simulating the cyclic responses of PC wide beam-column connections.

보-기둥구조 PC공동주택 시공관리를 위한 골조공사 ADM공정표 작성 (Writing ADM Network Diagram of Frame Work for the Precast Concrete Public Apartment Building Construction Management)

  • 김기호;김민준;김진원;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.221-222
    • /
    • 2022
  • In this study, the work flow of the construction process was analyzed based on construction monitoring for a building of the middle size beam-column system Precast Concrete(PC) apartment building supplied by LH, and the Arrow Daigram Method(ADM) network diagram of its construction was written. The results of this study are judged to be able to improve productivity by using the PC structure apartment building construction plan to calculate a reasonable construction period and prepare a process management method for the PC structure frame construction.

  • PDF

고속철도 PSC 박스거더 연속고의 프리캐스트 경간 일괄 가설 (Precast Full Span Construction of Continuous PSC Box Girder Bridge for High Speed Railway)

  • 박종화;김광수;심정욱;윤철수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1168-1173
    • /
    • 2004
  • Bridges and tunnels mainly compose the structural system of Kyung-bu high-speed railway in Korea and the prestressed concrete box girder bridges are applied for the most part of bridge structures. Precast full span construction method was practiced in the construction of many prestressed concrete box girder bridges in Kyung-bu high speed railway for the high quality, great construction speed, low construction cost and construction safety. However, there have been no application of this method in continuous bridges until now. Therefore, a new advanced precast full span construction method is developed using pre-tensioning for precast and post-tensioning in alternating the simple span into a continuous bridge system. since the high-speed railway trains can cause dynamic problems in a continuous bridge. This study shows the structural behavior and the construction process of the new advance method.

  • PDF

PC 적용을 위한 고강도 매스콘크리트의 수화특성에 관한 연구 (Study on Hydration Properties of High Strength Mass Concrete to apply Precast Concrete)

  • 박흥이;김성진;이회근;이승훈;박병근;정상진
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 춘계 학술발표회 제20권1호
    • /
    • pp.661-664
    • /
    • 2008
  • 고층 대형 건축물에 사용되는 기둥 보 등의 단면치수가 큰 Precast Concrete 부재는 제조과정에 있어서 외부에서의 가열뿐만 아니라, 시멘트수화열의 축척에 의한 내부에서의 온도 상승도 작용되기 때문에, 단면치수가 비교적 작은 벽, 밑바닥 등의 Precast Concrete 부재와는 다른 온도이력을 나타낸다고 생각할 수 있다. 이에 본 연구는 Precast Concrete적용을 위한 고강도 매스콘크리트 부재의 강도특성을 검토하기에 앞서, 온도이력특성을 밝히는 것을 목적으로 했다. 단면치수가 큰 Precast Concrete 모의부재의 단면치수, 단위시멘트량, 양생조건이 가각 다른 Precast Concrete 부재를 제조할 때의 온도이력특성을 총괄적으로 검토하여 분석하였다.

  • PDF

Flexural Behavior of Continuous Composite Bridges with Precast Concrete Decks

  • Chung, Chul-Hun
    • 콘크리트학회논문집
    • /
    • 제15권4호
    • /
    • pp.625-633
    • /
    • 2003
  • For the construction of open-topped steel box girder bridges, prefabricated concrete slab could offer several advantages over cast-in-situ deck including good quality control, fast construction, and elimination of the formwork for concrete slab casting. However, precast decks without reinforcements at transverse joints between precast slabs should be designed to prevent the initiation of cracking at the joints, because the performance of the joint is especially crucial for the integrity of a structural system. Several prestressing methods are available to introduce proper compression at the joints, such as internal tendons, external tendons and support lowering after shear connection. In this paper, experimental results from a continuous composite bridge model with precast decks are presented. Internal tendons and external tendons were used to prevent cracking at the joints. Judging from the tests, precast decks in negative moment regions have the whole contribution to the flexural stiffness of composite section under service loads if appropriate prestressing is introduced. The validity of the calculation of a cracking load fur serviceability was presented by comparing an observed cracking load and the calculated value. Flexural behavior of the continuous composite beam with external prestressing before and after cracking was discussed by using the deflection and strain data.