• Title/Summary/Keyword: precast-concrete construction

Search Result 511, Processing Time 0.023 seconds

Development of Finishing Panel using Surface Treatment Method (표면처리공법을 활용한 마감 패널 개발)

  • Kim, Kang-Min;Yoon, Seob;Kwan, Hae-Won;Gong, Min-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.57-58
    • /
    • 2019
  • Precast concrete finishing panels can be implemented in different colors, textures and designs relatively freely by different designers in different finishing materials. Therefore, we tried to develop a PC finishing panel that can be applied in the field by using various color pigment and concrete surface retardation method and polishing method.

  • PDF

Structural Performance Evaluation for the Precast Shell type Pier Cap (PC Shell 형식 피어캡의 구조성능 평가)

  • Shin, Sung-Jin;Hwang, Do-Kyu;Lee, Jae-Hoon;Son, Je-Kuk;Park, Dong-Kyu;Yoo, Dong-Ho
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.81-82
    • /
    • 2010
  • As a part of rapid construction technology of bridge pier caps, controversial issues for design and construction of precast pier caps were discussed. Three kinds of approaches of rapid bridge pier cap construction were proposed and discussed. Especially for an approach of precast shell type structures, experimental studies were performed to evaluate structural performance and compared with conventionally constructed reinforced concrete pier cap.

  • PDF

Influence Factors and Ralationship Analysis on Precast Concrete (PC) Component Erection Plan (PC 부재 설치계획의 영향요인 및 인과관계 분석)

  • Oh, Jin-Hyuk;Lee, Dong-Joo;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.90-91
    • /
    • 2021
  • Large logistics centers are being built around the world. Most of these buildings have characteristics of long span and heavy load, and use PC (precast concrete) structure for quick construction. There have been few attempts to systematically analyze the various influencing factors of PC erection planning. In this study, we intend to analyze the influencing factors necessary for the creation of a sustainable PC erection planning algorithm.

  • PDF

Case Studies of Precast Facade Digital Design and Fabrication Strategies (사례 분석을 통한 프리캐스트 입면 디지털 설계 및 패브리케이션 전략)

  • Kim, Jin-Ho
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.8-18
    • /
    • 2019
  • Precast concrete manufacturing has proved economies of scale through the repetitive production by means of standardization, automation, and prefabrication. Advanced digital design and fabrication technologies can empower its benefits by enabling mass customization in the building design and construction. This study analyzed five case studies in terms of 1) design intent and background, 2) module development and facade construction, 3) integrated process among project stakeholder. This article has attempted to establish the following three points in conclusion: 1) Form generating digital design tools such as Rhino, CATIA, Generative Component, and Digital Project were implemented to produce parametric surface pattern and rationalization to maximize existing precast manufacturing benefits. Also, BIM program has been used to promote coordination and communication among engineering consultants and contractors, 2) In addition to traditional precast concrete materials, GFRC, RFP, brick cladding precast and 3D printed mould have been introduced to reduce the weight and cost and to comply the code from the zoning, seismic, and fireproof requirements, 3) Design-assist contract, design-assist financial support, and co-location measures have been introduced to facilitate collaboration between architect, fabricator, and contractor from the beginning of the project.

Development of Precast Channel Structure Using Polymer Concrete (폴리머 콘크리트를 이용한 조립식 수로구조물 표준도 개발)

  • Park, Kwang-Soo;Shin, Su-Gyun;Kim, Kwan-Ho;Lee, Meyong-Won;Lee, Joon-Gu
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.157-160
    • /
    • 2002
  • This study was developed high-quality a large size precast channel structure using polymer concrete to improve quality of the product as well as to enhance construction quality. Practical precast channel structure design and manufacture procedure for the high polymer concrete were described in this paper. Precast PC represent the fastest growing segment of the polymer concrete industry. The fast curing, high strength, and low impermeability permit thin section and rapid reuse of moulds. Precast channel structure will carry out structural experiment and analysis.

  • PDF

Precast concrete slab track - state of the art (프리캐스트 콘크리트 슬래브궤도 기술현황)

  • Jang Seung Yup;Yang Sin Chu;Kim Jeong Il;Kim Tae Wook
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.104-110
    • /
    • 2003
  • Precast concrete slab track has been already turned out to be more efficient than cast-in place concrete slab track in view of the easiness of construction and the quality control of concrete. Thus, there is a great need to bring in the precast slab track system. In order to develop the realistic precast slab track system that is well conformed to our circumstances, the performance criteria of slab track, and the state-of-the art of precast slab track systems that are used in other countries are briefly discussed here.

  • PDF

Identification of Factors Influencing the Operability of Precast Concrete Construction Shipment Request Forms

  • Jeong, Eunbeen;Jang, Junyoung;Kim, Tae Wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.145-152
    • /
    • 2022
  • Recently, interest in the precast concrete (PC) construction method has been increasing. The PC construction process consists of i) design, ii) production, iii) transportation, and iv) installation. A PC field manager at the site submits a shipment request form to the factory one to three days before the installation of the PC component. Numerous matters should be considered in writing a shipment request form. Incorrect shipment request forms may cause standby resources, waste of resources, premature work conclusion, or excessive work. These issues can lead to an increase in construction costs, replanning of PC component installation, or rework. In order to prevent such problems, PC component installation should be simulated based on the shipment request form. Accordingly, this study aims to identify factors influencing the operability of shipment request forms for PC construction. To this end, this study derived factors influencing i) initiation of the activity, ii) addition or deletion of activities, and iii) an increase or decrease in the activity execution time. As a result, this study identified flow, the features of PC components, condition of PC components, unloading location, installation location, input equipment and labor, number of anchors, number of supports, weather, strike, and accident. Further studies should verify the factors derived in this study based on focus group interviews.

  • PDF

Performance Assessment of Hollow Precast Segmental Bridge Columns with Reinforcement Details for Material Quantity Reduction (조립식 물량저감 중공 철근콘크리트 교각의 성능평가)

  • Kim, Tae-Hoon;Park, Dong-Kyu;Lee, Jae-Hoon;Shin, Hyun-Mock
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.20 no.1
    • /
    • pp.33-43
    • /
    • 2016
  • This study investigates the performance of hollow precast segmental bridge columns with reinforcement details for material quantity reduction. The proposed triangular reinforcement details are economically feasible and rational, and facilitate shorter construction periods. The precast segmental bridge columns provides an alternative to current cast-in-place systems. We tested a model of hollow precast segmental bridge columns under a constant axial load and a quasi-static, cyclically reversed horizontal load. We used a computer program, Reinforced Concrete Analysis in Higher Evaluation System Technology (RCAHEST), for analysis of reinforced concrete structures. The used numerical method gives a realistic prediction of performance throughout the loading cycles for hollow precast segmental bridge column specimens investigated. As a result, proposed reinforcement details for material quantity reduction was equal to existing reinforcement details in terms of required performance.

Analysis of Construction Cases for Sequential PC Stairway Method (RC 계단실 연속화 시공을 위한 PC 계단 공법 현장사례 분석)

  • Lee, Suk-Yong;Rhim, Hong-Chul;Kim, Ook-Jong;Cho, Hong-Duk;Jeong, Mee-Ra
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.15-19
    • /
    • 2008
  • The use of Precast Concrete (PC) stairways is increasing to replace existing Reinforced Concrete (RC) stairways for the faster construction and the better quality control. Among several already developed PC stairway construction methods, RC Core Sequential Construction Method by Using PC Stairways (COSEC) has advantages of 1) allowing core of a building to be built prior to PC stairways so that two different procedures will not interfere with each other, and 2) having a newly developed joint connection with the core so that the RC core and PC stairways can be easily put together. In this paper, cases of several construction sites with the PC stairways method are analyzed. The elements of the developed method are described for further application and improvement.

  • PDF

Influence of post-pouring joint on long-term performance of steel-concrete composite beam

  • Huang, Dunwen;Wei, Jun;Liu, Xiaochun;Zhang, Shizhuo;Chen, Tao
    • Steel and Composite Structures
    • /
    • v.28 no.1
    • /
    • pp.39-49
    • /
    • 2018
  • The concrete bridge decks are usually precast and in-situ assembled with steel girders with post-pouring joint in the construction practice of super-wide steel-concrete composite beam. But the difference of concrete age between the precast slabs and the post-pouring joint has been not yet considered for the long-term performance analysis of this kind composite beam. A simply supported precast-assembled T-shaped beam was taken as an example to analyze the long-term performance of steel-concrete composite beam with post-pouring joint. Based on the deformation coordination conditions of the old-new concrete deck and steel girder, a theoretical model for the long-term behavior of precast-assembled composite beam is proposed in this paper according to age-adjusted effective modulus method. Then, the feasibility of the proposed model is verified by the available test data from the Gilbert's composite beams. Parametric studies were preformed to evaluate the influences of the cross-sectional area ratio of the post-pouring joint to the whole bridge deck, as well as the difference of concrete age between the precast slabs and the post-pouring joint, on the long-term performance of the composite beam. The results indicate that the traditional method without considering the age difference would seriously underestimate the effect of creep and shrinkage of concrete bridge decks. The concrete age difference between the precast slabs and the post-pouring joint should be demonstrated for the life cycle design and long-term performance analysis of precast-assembled steel-concrete composite beams.