하부철근 이음길이에 따른 PC 보 제작 길이 산정 (Estimation of production length of PC beam by using splice length of bottom rebar)

  • 성수진;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.84-85
    • /
    • 2014
  • Green frame is column-beam structure composed of precast concrete members. Based on Revision of Structural Concrete Design Code, the bottom rebar of beam shall be extend at least 150mm into the support member. However, if the bottom rebar extend to satisfy Revision of Structural Concrete Design Code, the installation fo beam is impossible due to interference between the columns and beams. Thus, the aim of this study is estimation of production length of precast concrete beam by using splice length of bottom rebar. In this study to solve this problem, lap splice were used on the join. This study was calculated length of the reinforcement by the diameter. According to the length of the rebar, the production length of beam concrete was calculated. The results of this study will satisfy the Revision of Structural Concrete Design Code about column-beam connection when green frame will be applied.

  • PDF

합성 PC 부재의 현장생산 및 설치 공정계획의 영향요소 분석 (An Analysis of Influence Factors on Insitu-production and Installation Schedule of Composite Precast Concrete Members)

  • 임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.176-177
    • /
    • 2013
  • The composite PC rahmen structure, called Green Frame, allows the main structural members such as PC column and beam to be produced on the site, resulting in a reduction of PC member transportation cost and the margin of PC plant (operation cost and profit), making it more economic than the bearing wall structure. To apply the Green Frame to practice, not only installation but also insitu-production process should be considered. Therefore, this study analyse the influence factors on insitu-production and installation schedule of composite precast concrete members. The results shall be used as basic criteria on the planning of insitu-production and installation of Green Frame.

  • PDF

보-기둥구조 PC공동주택 시공관리를 위한 골조공사 ADM공정표 작성 (Writing ADM Network Diagram of Frame Work for the Precast Concrete Public Apartment Building Construction Management)

  • 김기호;김민준;김진원;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.221-222
    • /
    • 2022
  • In this study, the work flow of the construction process was analyzed based on construction monitoring for a building of the middle size beam-column system Precast Concrete(PC) apartment building supplied by LH, and the Arrow Daigram Method(ADM) network diagram of its construction was written. The results of this study are judged to be able to improve productivity by using the PC structure apartment building construction plan to calculate a reasonable construction period and prepare a process management method for the PC structure frame construction.

  • PDF

전단키를 갖는 프리캐스트 콘크리트 패널 수직접합부의 전단강도 (Shear Strength of Vertical Joints in Precast Concrete Panel with Shear Key)

  • 이상섭;박금성;배규웅
    • 대한건축학회논문집:구조계
    • /
    • 제35권9호
    • /
    • pp.151-158
    • /
    • 2019
  • A concrete core is used widely as lateral stability systems in high-rise modular buildings. As an alternative to traditional cast in-situ core, the precast concrete(PC) method can accelerate the construction of reinforced concrete cores. A core composed of precast elements differs from a in-situ core in having connections between the precast elements. The typical vertical connection between PC panels is consisted of shear keys, loop bars, lacer bars and grout. In this study, the effect of vertical connection components on shear strength is investigated experimentally. The test results show that the contribution to the shear strength is greater in order of grout strength, shear keys, lacer bars and loop bars. In addition, the numerical models to estimate the shear strength according to two crack patterns in the vertical joint of the PC panels are derived. The feasibility of the numerical models is evaluated by comparing the estimated shear strength and the test results.

프리캐스트 보와 충전형 강관 기둥 접합부의 거동에 관한 실험적 연구 (The Experimental study on the behavior of precast Girder-Infilled Steel Tube Column joint)

  • 정재우;박성무
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1995년도 가을 학술발표회 논문집
    • /
    • pp.317-322
    • /
    • 1995
  • This study is to examine the usefulness in using precast girder-infilled steel tube column in reinforced concrete structures through the analysis of the test results, in order to develope the new composite structural system using precast girder-Infilled steel tube column, The variables of specimen are strength of concrete, the numble of hoops, the form of beam-column The variables of specimen are strength of concrete, the number of hoops, the form of beam-column joints. By raising strength of concrete and incresing number of hoops in beam-column joint, it becomes clear to take similar structure capacity to monolithic structures.

  • PDF

Global seismic performance of a new precast CFST column to RC beam braced frame: Shake table test and numerical study

  • Xu, S.Y.;Li, Z.L.;Liu, H.J.
    • Steel and Composite Structures
    • /
    • 제21권4호
    • /
    • pp.805-827
    • /
    • 2016
  • A new type of precast CFST column to RC beam braced frame is proposed in this paper. A series of shake table tests were conducted to excite a one-third scale six-story model for investigating the global seismic performance of this type of structure against earthquake actions. Particular emphasis was given to its dynamic property, global seismic responses and failure path. Correspondingly, a numerical model built on the basis of fiber-beam-element model, multi-layer shell model and element-deactivation method was developed to simulate the seismic performance of the prototype structure. Numerical results were compared with the measured values from shake table tests to verify the validity and reliability of the numerical model. The results demonstrated that the proposed novel precast CFST column to RC beam braced frame performs excellently under strong earthquake excitations; the "strong CFST column-weak RC beam" and "strong connection-weak member" anti-seismic design principles can be easily achieved; the maximum deflections of precast CFSTC-RCB braced frame satisfied the deflection limitations proposed in national code; the numerical model can properly simulate the dynamic property and responses of the precast CFSTC-RCB braced frame that are highly concerned in engineering practice.

프리캐스트 콘크리트 제품의 공장 인증 제도에 관한 연구 (A Study on Plant Certification Program for Precast Concrete Products)

  • 김형도;이상섭;박금성;배규웅
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제18권6호
    • /
    • pp.131-138
    • /
    • 2014
  • 1994년 성수대교 붕괴사고 이후 강구조물의 품질 관리를 위해 철강구조물제작공장 인증제도가 건설기술관리법에 도입되어 법정임의 인증제도로 운영되고 있다. 그러나 콘크리트 부재의 공장 생산 방식인 PC (Precast Concrete)에 대해 국가적인 품질인증 체계는 마련되어 있지 않다. 이에 건축 구조용 PC를 대상으로 적절한 품질인증제도 도입을 위해 북미, 유럽, 일본 등의 PC 품질인증제도를 조사하였다. 미에서 PC 공장인증제도를 운영하고 있는 곳은 PCI, NPCA, CPCI 등이 있다. 유럽에서 PC 제품을 판매하기 위해서는 CPR 305/2011을 따르도록 법으로 정해져 PC 제품을 포함한 모든 건설 제품은 2013년 7월부터 CE 마크를 의무적으로 부착해야 한다. 일본의 경우 토목용 PC 제품은 제품인증인 JIS 마크 인증을 받도록 되어 있고 건축 구조용 PC를 생산하는 공장은 일본 프리패브협회의 심사를 받고 있다. 이런 조사 결과에 근거하여 국내 인증 체계에 부합될 수 있도록 건축 구조용 PC 제품의 인증제도의 도입 방향을 이 논문에 제시하였다.

Performance evaluation of a seismic retrofitted R.C. precast industrial building

  • Nastri, Elide;Vergato, Mariacristina;Latour, Massimo
    • Earthquakes and Structures
    • /
    • 제12권1호
    • /
    • pp.13-21
    • /
    • 2017
  • Recent seismic events occurred in Italy (Emilia-Romagna 2012, Abruzzo 2009) and worldwide (New Zealand 2010 and 2011) highlighted some of the weaknesses of precast concrete industrial buildings, especially those related to the connecting systems traditionally employed to fasten the cladding panels to the internal framing. In fact, one of the most commons fails it is possible to observe in such structural typologies is related to the out-of-plane collapse of the external walls due to the unsatisfactory behaviour of the connectors used to join the panels to the perimeter beams. In this work, the strengthening of a traditional industrial building, assumed as a case study, made by precast reinforced concrete is proposed by the adoption of a dual system allowing the reinforcement of the structure by acting both internally; by pendular columns and, externally, on the walls. In particular, traditional connections at the top of the walls are substituted by devices able to work as a slider with vertical axis while, the bottom of the walls is equipped with two or more hysteretic dampers working on the uplift of the cladding panels occurring under seismic actions. By means of this approach, the structure is stiffened; obtaining a reduction of the lateral drifts under serviceability limit states. In addition, its seismic behaviour is improved due to the additional source of energy dissipation represented by the dampers located at the base of the walls. The effectiveness of the suggested retrofitting approach has been checked by comparing the performance of the retrofitted structure with those of the structure unreinforced by means of both pushover and Incremental Dynamic Analyses (IDA) in terms of behaviour factor, assumed as a measure of the ductility capacity of the structure.

프리캐스트 콘크리트 대형판 구조물의 1/5 축소모델 제작 및 실험기법 연구 (A Study on Manufacturing and Experimental Techniques for the 1/5th Scale Model of Precast Concrete Large Panel Structure)

  • 김상규;이한선
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1995년도 가을 학술발표회 논문집
    • /
    • pp.198-203
    • /
    • 1995
  • The objective of this study is to provide the information on the techniques of manufacturing and experiment in small scale modeling of precast concrete(P.C.)large panel structures. The adopted scale was 1/5th 4types of experiments were performed : material tests for model concrete and model reinforcement, compressive test of horizontal joint, shear test of vertical joint and cyclic static test of 2-story subassemblage structure. Based on the experimental results, the following conclusions are drawn: (1)Model concrete may have in general larger compressive strength than expected. (2) Model reinforcement can show less ductility if the annealing processes were performed without using vaccuum tube. (3) Failure modes of horizontal and vertical joints were almost same for both prototype and model. But the strength of model appears to be higher than required by similitude law. (4)Hysteretic behavior of 1/5 scale subassemblage model can be made quite similar to prototype's if the ductility of model reinforcement and compressive strength of model concrete could be representative of those of prototype.

  • PDF

수평 접합부를 고려한 프리캐스트 대형판 구조물의 동적 해석에 관한 연구 (Dynamic Analysis of Precast Concrete Large Panel Structures with Horizontal Joints)

  • 정일영;송진규;강해관
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1996년도 가을 학술발표회 논문집
    • /
    • pp.249-257
    • /
    • 1996
  • Dynamic Analysis of Precast Concrete Large Panel Structures with Horizontal Joints The damage in precast large panel structures subjected to destructive earthquakes is generally localized in the joints. Particularly, the horizontal joints influence on the stability and integrity of the overall structure. In this research a dynamic analysis was carried out by the macro model that idealized the horizontal joints as inelastic-nonlinear spring systems. It is capable of simulating the behavior of precast concrete structures using the mathematical model. As a result of the dynamic parametric study for the case of 0.12g peak base accelerations, it is found that all joints behave elastically for sliding and opening and that all forces are well distributed without excessive local concentration on my horizontal joints.

  • PDF