• Title/Summary/Keyword: power system planning

Search Result 664, Processing Time 0.025 seconds

Simultaneous Planning of Renewable/ Non-Renewable Distributed Generation Units and Energy Storage Systems in Distribution Networks

  • Jannati, Jamil;Yazdaninejadi, Amin;Talavat, Vahid
    • Transactions on Electrical and Electronic Materials
    • /
    • v.18 no.2
    • /
    • pp.111-118
    • /
    • 2017
  • The increased diversity of different types of energy sources requires moving towards smart distribution networks. This paper proposes a probabilistic DG (distributed generation) units planning model to determine technology type, capacity and location of DG units while simultaneously allocating ESS (energy storage systems) based on pre-determined capacities. This problem is studied in a wind integrated power system considering loads, prices and wind power generation uncertainties. A suitable method for DG unit planning will reduce costs and improve reliability concerns. Objective function is a cost function that minimizes DG investment and operational cost, purchased energy costs from upstream networks, the defined cost to reliability index, energy losses and the investment and degradation costs of ESS. Electrical load is a time variable and the model simulates a typical radial network successfully. The proposed model was solved using the DICOPT solver under GAMS optimization software.

A Study on the Optimal Var Planning Considering Uncertainties of Loads (부하의 불확실성을 고려한 최적 Var배분 앨고리즘에 관한 연구)

  • 송길영;이희영
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.4
    • /
    • pp.346-354
    • /
    • 1992
  • In the power-system, the active and reactive power levels of load bus randomly vary over days, months, and years which are stochastic in nature. This paper presents an algorithm for optimal Var planning considering the uncertainties of loads. The optimization problem is solved by a stochastic linear programming technique which can handle stochastic constraints to evaluate optimal Var requirement at load bus to maintain the voltage profile which results in probabilistic density function by stochastic Load Flow analysis within admissible range. The effectiveness of the proposed algorithm has been verified by the test on the IEEE-30 bus system.

Shortest Path Planning and Robust Control of Two-wheeled Mobile Robot (이륜구동로봇의 최단거리계획과 강인제어)

  • Kim, H.K.
    • Journal of Power System Engineering
    • /
    • v.10 no.4
    • /
    • pp.172-180
    • /
    • 2006
  • 본 논문은 Dijkstra 알고리즘에 기초한 최단거리 경로계획을 하며 이 경로를 추적하기 위한 슬라이딩 모드 제어를 제시한다. 슬라이딩 모드 제어기는 동적매개변수 불확실성과 입력외란이 존재 시에도 강인 점근적으로 계획된 경로를 추적하도록 한다. 더불어 작업장 내의 이동로봇의 위치를 USB 카메라에 의해 감지하며, Pin-hole 카메라모델로 하여 카메라에 의해 관측되는 작업장 내의 이륜구동로봇의 위치좌표를 결정하였으며, 이 위치를 정확히 감지하기 위해 Tsai법을 사용하여 카메라 보정한다. 시뮬레이션 결과는 슬라이딩 모드 제어기의 성능을 검증하기 위해 보였다.

  • PDF

An IPLAN-based Program for Technical Assessment of New-connected Facilities (IPLAN을 이용한 전력설비의 계통접속 기술검토 프로그램 개발)

  • Ryu, Heon-Su;Bae, Joo-Cheon
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.220-222
    • /
    • 2005
  • When a large-scale load or a new generator is connected to power systems, KPX assesses the effect of the connection on power systems to keep security and reliability standards. As the number of connection requests has been increased, KPX is spending much time for technical assessments of the requests. This paper developed an automatic assessment program to reduce analysis time and enhance simulation accuracy. The program is based on IPLAN and. can be applied to both load and generator network connection requests.

  • PDF

Congestion and Loss cost for economic subject using Optimal Power Flow (최적 조류 계산을 이용한 경제주체별 혼잡 및 손실비용 산정)

  • Seo, Chul-Soo;Yoon, Gi-Gab;Park, Sang-Ho;Choy, Young-Do;Lee, Jae-Gul;Son, Hyun-Il;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.430-431
    • /
    • 2011
  • Recently the power system consists of the more complicated structure, due to increase of power demands. In this circumstance, the congestion and loss capacity in transmission line is also increased. Accordingly, the investment planning of transmission system is required to reduce the congestion and loss of the transmission line. In study of the planning of domestic and international transmission expansion, the reliability of transmission planning and minimizing Investment cost is focused. However, the study has not been performed systematically in economic aspects. Typically, the congestion and loss costs have been individually calculated. It is not consider the mutual relationship between the congestion cost and the loss cost. This paper proposes a method to compute concurrently the congestion and loss costs. This purpose is to calculate the more exact value for economic assessment of the power system operation.

  • PDF

Optimal Capacity and Allocation Distributed Generation by Minimization Operation Cost of Distribution System (배전계통 운영비용의 최소화에 의한 분산전원의 최적 용량과 위치결정)

  • 배인수;박정훈;김진오;김규호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.9
    • /
    • pp.481-486
    • /
    • 2004
  • In operation of distribution system, $DG_s$ Distributed Generations) are installed as an alternative of extension and establishment of substations and transmission and distribution lines according to increasing power demand. In operation planning of $DG_s$, determining optimal capacity and allocation gets economical pro(it and improves power reliability. This paper proposes determining a optimal number, size and allocation of $DG_s$ needed to minimize operation cost of distribution system. Capacity of $DG_s$ (or economical operation of distribution system estimated by the load growth and line capacity during operation planning duration, DG allocations are determined to minimize total cost with power buying cost. operation cost of DG, loss cost and outage cost using GA(Genetic Algorithm).

Analysis on the Power System Reliability Characteristics according to the High-Efficient End-Use Diffusion (고효율기기의 보급확산에 따른 전력시스템 공급신뢰도의 영향분석)

  • Chang, Seung-Chan;Hwang, Sung-Wook;Cho, Hyoung-Joon;Kim, Jung-Hoon;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1998.11a
    • /
    • pp.239-241
    • /
    • 1998
  • The probabilistic production simulation of power system generally has been used to formulate a reasonable power production plan or generation planning. It integrates the convolution process of a generating unit's random outage(FOR) with equivalent load duration curve(ELDC), and provides the reliability indices of power system. This paper presents the reliability characteristics of power system reflected on demand side management and proposes the modified ELDC representation technique due to the high-efficient end-use diffusion among the customers. Load reductions are simulated from the multi-state deconvolution process with the saved capacity of end-use. Case study shows the computed reliability from the power system production simulation incorporated with DSM planning scheme.

  • PDF

Economic Feasibility of Energy Storage System connected with Solar /Wind Power Generation (태양광/풍력 연계 기반의 ESS 경제성 분석)

  • Lee, Yong Bong;Kim, Jeong Ho
    • Journal of Energy Engineering
    • /
    • v.24 no.3
    • /
    • pp.74-81
    • /
    • 2015
  • Currently, the government is encouraging the introduction of energy storage system to reduce carbon emissions and peak power demand. The government is planning the cumulative capacity of ESS of 2GW in 2020. By utilizing charge and discharge of the ESS, it is possible to sell the surplus power to utility and electricity market. This paper suggests the model that economic feasibility of energy storage system for planning the construction of power generation facilities in 2035. Our results of simulation indicate the energy storage plan of utility for constructing renewable energy facilities is need to incentives from the government to encourage power utilities and expansion of ESS.

A Combined Bulk Electric System Reliability Framework Using Adequacy and Static Security Indices

  • Billinton, Roy;Wangdee, Wijarn
    • Journal of Electrical Engineering and Technology
    • /
    • v.1 no.4
    • /
    • pp.414-422
    • /
    • 2006
  • Deterministic techniques have been applied in power system planning for many years and there is a growing interest in combining these techniques with probabilistic considerations to assess the increased system stress due to the restructured electricity environment. The overall reliability framework proposed in this paper incorporates the deterministic N-1 criterion in a probabilistic framework, and results in the joint inclusion of both adequacy and security considerations in system planning. The combined framework is achieved using system well-being analysis and traditional adequacy assessment. System well-being analysis is used to quantify the degree of N-1 security and N-1 insecurity in terms of probabilities and frequencies. Traditional adequacy assessment is Incorporated to quantify the magnitude of the severity and consequences associated with system failure. The concepts are illustrated by application to two test systems. The results based on the overall reliability analysis framework indicate that adequacy indices are adversely affected by a generation deficient environment and security indices are adversely affected by a transmission deficient environment. The combined adequacy and security framework presented in this paper can assist system planners to realize the overall benefits associated with system modifications based on the degree of adequacy and security, and therefore facilitate the decision making process.

A Study on the Outage Cost Assessment for Transmission System Expansion Planning (송전계통계획 수립용 공급지장비의 추정에 관한 연구)

  • Lee, Young-Jin;Kang, Sung-Rok;Choi, Jae-Seok;Kim, Ho-Yong;Kim, Seul-Gi
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.479-483
    • /
    • 2003
  • The outage cost has very important position for determination of the optimal level or optimal range of reliability in power system expansion planning. Establishing the worth of service reliability is a very difficult and subjective task. This paper suggests strategies for the role, need and assessment algorithm and methodology of the outage cost in power system expansion planning. Organization, data collections and method about D/B for outage cost assessment is proposed in the this study.

  • PDF