1 |
Ministry of Knowledge Economy, The 6th Basic Plan of Long-Term Electricity Supply and Demand, 2013.
|
2 |
Mnistry of Trade, Industry and Energy, Operation Guildline of Renewable Energy Portfolio Standard, 2014.
|
3 |
Ministry of Trade, Industry and Energy, The Plan of propagation for Large scale Energy Storage System, 2012.
|
4 |
Kim Yeong-Hwan, Kim Se-Ho, "Increasing Effect Analysis of the Wind Power Limit Using Energy Storage System in Jeju-Korea", Journal of the Korean Solar Energy Society, 2014. 34(1) p81-88.
DOI
|
5 |
Kim Hyeong Taek, Myeong Ho-San, Kim Se-Ho, "A study on the maximum penetration limit of wind power considering output limit of WTGs", Journal of the Korean
|
6 |
Hyung-joon Park, Chan-soo Chung, "Economic Analysis of High-Efficiency Production Facilities using Capital Recovery Factor." Journal of the Korean Solar Energy Society Journal of the Korean institute of illuminating and electrical installation engineers, 21(7),(2007), pp. 117-123.
|
7 |
Seung-jae Lee, Seung-seob Euh, Seung-Hoon Yoo, "Estimation of city gas demand function using time series data"Journal of Energy Engineering, (2013), 22(4), pp370-375.
DOI
|
8 |
하정우, 김수덕. 대관령 풍력단지의 풍력발전량 및 경제성 분석. 에너지공학, 2005, 14(2), pp123-132.
|
9 |
Jeong-woo Ha, Suduk Kim, "A Study on the Wind Power Generation and Its Economic Feasibility at Daekwanryung", Journal of Energy Engineering, Vol. 14, No. 2, pp. 123-132 (2005)
|