• Title/Summary/Keyword: power supply facility

Search Result 166, Processing Time 0.029 seconds

Standardization for receive and supply of electric power facility of airport (공항 수.배전 설비 표준화)

  • 최홍규;원진희;송영주;조계술
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.349-354
    • /
    • 2003
  • Airport facility is infrastructure that become external creditworthiness and linear measure of country competitive power. Among them, receive and supply of electric power facility of airport is very important in peculiarity, trustability, safety side of airport. In this parer, sorted domestic airline as 4 classes by code to accomplish standardization for receive and supply of electric power facility of airport. And established justice and coverage about receive and supply of electric power facility using without any standard present and analyze problem for receive and supply of electric power facility of existing airport and presents standard. Finally, present standard single-line diagram by airport grade and system grade standard of receive and supply of electric power facility of airport.

  • PDF

FMEA for Facility Reliability Analysis of A Hydro-power Plant (수력발전소 설비 신뢰성 분석을 위한 FMEA)

  • Kwon, Chang-Seob;Jeon, Tae-Bo
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.135-144
    • /
    • 2006
  • The significance of hydro-power plant is increasing in its public roles such as flood control and water supply as well as electric power production. Even if high level of reliability in facility operation is required, no specific reliability research has been made. This specifically stems from the lack of technology and research investments. The eventual goal of this study is to secure a methodology for reliability analysis of hydro-power plant so that an appropriate decision for operation and investment can be made. Specific effort was put to develop a reliability model for water supply system within hydro-power plant. For this study, we briefly examined the overview of the hydro-power plant including the electric power generation facility system. We then discussed the facility reliability analysis methodology for hydro-power plant. Based on rigorous examination of the water supply system and components roles, we drew major failure modes for each component and examined their effects.

  • PDF

FTA Modeling of Water Supply System for Hydro-power Plant (수력발전소 물 공급 설비에 대한 FTA 모형)

  • Jeon, Tae-Bo;Kwon, Chang-Seob
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.145-155
    • /
    • 2006
  • High level of reliability in facility operation is specifically required these days. The goal of this study is to secure a methodology for reliability analysis of hydro-power plant so that an appropriate decision for operation and investment can be made. Fault tree analysis of water supply system within hydro-power plant has been performed in this study. We briefly examined the electric power generation facility and water supply system. We then developed fault tree for the water supply system based on failure modes and effects analysis. We conclude this study and provided future research areas.

  • PDF

A Study on the Optimization of Power Transformer in Apartment Housing (아파트의 동력변압기 용량 최적화 연구)

  • 이기홍;성세진
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.15 no.1
    • /
    • pp.78-83
    • /
    • 2001
  • To establish the optimized capacity of power transformer, this paper proposed the total demand factor of power supply facility. For this purpose, it was measured and analysed the operating pattern of power supply acility Installed in the apartment. As a result, it is found that the demand factor of each facility is following that : i) In case of [Xlwer water suwly facility ; 47[%], ii) In case of waste water facility ; 44[%]. Also, it was analysed that the optimized total demand factor of power load is proper 42[%1 than 52[%] to lead the efficiency operation.ration.

  • PDF

Development of Short-circuit Testing Facility for Distribution Transformers (배전용 변압기 단락강도 시험설비 개발)

  • Park, Ji-Hun;Min, Yun-Hong;Kang, Young-Hak;You, Ho-Keun;Ahn, Kyu-Sun;Ham, Gil-Ho;Oh, Chang-Ju
    • Proceedings of the KIEE Conference
    • /
    • 2002.04a
    • /
    • pp.64-67
    • /
    • 2002
  • To increase the short-circuit testing capacity of distribution transformers, testing facility has been installed for KEPCO in Vi-wang. The power supply of testing facility is directly supplied from the network substation located closely. Testing can be performed up to 300 kVA for single-phase transformers, 500 kVA for three-phase transformers. Operating with this facility, the distribution company is able to maintain the reliable supply of electricity. Also the critical quality of transformers from manufacturers can be verified by short-circuit testing. This paper describes the design concept and specification of newly developed equipment and the procedure of short-circuit test.

  • PDF

Grid service using Vehicle-to-Grid (V2G를 이용한 전력계통 서비스)

  • Lee, Hyun-Goo;Sohn, Hong-Kwan;Ha, Tae-Hyun;Bae, Jeong-Hyo;Kim, Dae-Kyeong;Lee, Sung-Joon;Kim, Sung-Cheol
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.141-142
    • /
    • 2011
  • The increase in oil prices and the rising environmental concerns are boost the electric vehicle supply. Vehicle manufactures understand this trend quite well and plan to increase the production of electric vehicle(EV) such as Nissan LEAF and GM VOLT etc.. The growth of intermittent renewable energy sources such as solar and wind power requires utilities to find additional grid coupled energy storage and regulation capacity. EVs have a battery pack and a charger. The charger can be able to deliver power back to the grid from the vehicle's battery as well as charge the battery. The concept of deploying EVs to stabilize the electric power grid is generally referred to as Vehicle-to-Grid(V2G). We present the grid service using V2G.

  • PDF

A Study on Feasibility Analysis and Optimum Range Calculation Model by Conversion of Water Supply System (상수도 급수방식 전환의 타당성 분석 및 최적 범위 산정모델 연구)

  • Park, Junyeol;Shin, Hwisu;Seo, Jeewon;Kim, Kibum;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.2
    • /
    • pp.177-186
    • /
    • 2017
  • This study concerned the analysis on the efficiency of the conversion of water tank type supply system to direct water supply system to examine the feasibility of the conversion, as well as the calculation of optimal conversion range that enables the supply of safe, high-quality water at stable pressure in accordance with the standards of water supply facility. The results of this research showed that when converting water supply system from water tank type supply system to direct water supply system, more nodal points could be properly converted and more reduction of electricity usage was expected in case water pressure rather than residence time was fixed. This means that higher efficacy can be obtained by fixing water pressure when converting water supply system. However, since the number of the locations that received on-spot inspection was small and the electricity usage measured was not exclusively by water supply facility, it is difficult to judge that such reduction of electricity usage accurately represents reduced electricity usage by water supply facility alone. therefore, after having secured on-spot information about a larger number of locations in apartment complexes that have converted water supply system, and utilizing information about electricity usage exclusively by water supply facility, the proposed method of this research could be applied to accurately deducing expected reduction of electricity usage by water supply facilities of various other apartment complexes. It is also considered possible to deduce an effective operation method of water supply system by finding out an area that shows low pressure or low residual chlorine concentration in the optimal conversion range of water supply, followed by estimating the proper location of pumping station or the proper chlorine dosage at the power purification plant that supply water to the target area.

The fire Prevention measures of the underground transmission line (지중송전케이블의 방화대책)

  • Kwak, Bang-Myung;Tack, Eui-Gyun;Kim, Jae-Seung
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.501-503
    • /
    • 2001
  • Electric power consumption is highly increasing as the social trend requiring comfortable life, the population in a big city and the industrial development. Therefore it has become to be very important to supply the stable high-quality power. As these trend, the underground power transmission facility is highly increasing in the center of a city. As the proportion to increase facility in tunnel, the fire prevention measures of the underground transmission line become very important.

  • PDF

A Study on Trouble and Arrangement of the Ground-Fault Protection for 2 Step Voltage Distribution System of Premises (2 Step 이상 운용 고객의 구내배전계통 지락보호시스템 구성 현황 및 문제점 검토)

  • Im, Jin-Sung;Shin, Myoung-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.10
    • /
    • pp.73-77
    • /
    • 2010
  • Most accidents occurred in power receiving & transforming facility are ground fault. The quality of power supply is deteriorated since the ground fault is not detected promptly. This paper analyzes the problems about system-grounding type of 2 step power receiving & transforming facility, arrangement of protection relaying scheme and ground-fault protection system of ungrounded system. Then, this paper presents the arranging scheme of system-grounding type to improve power supply reliability.

A Study on Battery Charger Reliability Improvement of Nuclear Power Plants DC Distribution System (원자력발전소 직류 전력계통의 충전기 신뢰도 향상방안 연구)

  • Lim, Hyuk-Soon;Kim, Doo-Hyun
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.2
    • /
    • pp.24-28
    • /
    • 2010
  • The nuclear power Plant onsite AC electrical power sources are required to supply power to the engineering safety facility buses if the offsite power source is lost. Typically, Diesel Generators are used as the onsite power source. The 125 VAC buses are part of the onsite Class 1E AC and DC electrical power distribution system. The DC power distribution system ensure the availability of DC electrical power for system required to shutdown the reactor and maintain it in a safety condition after an anticipated operational occurrence or a postulated Design Base Accident. Recently, onsite DC power supply system trip occurs the loss of system function. To obtain the performance such as reliability and availability, we analyzed the cause of battery charger trip and described the improvement of DC power supply system reliability. Finally, we provide reliability performance criteria of charger in order to ensure the probabilistic goals for the safety of the nuclear power plants.