DOI QR코드

DOI QR Code

A Study on Trouble and Arrangement of the Ground-Fault Protection for 2 Step Voltage Distribution System of Premises

2 Step 이상 운용 고객의 구내배전계통 지락보호시스템 구성 현황 및 문제점 검토

  • 임진성 (한국전기안전공사) ;
  • 신명호 (서울과학기술대학교 전기공학과)
  • Received : 2010.07.09
  • Accepted : 2010.08.17
  • Published : 2010.10.31

Abstract

Most accidents occurred in power receiving & transforming facility are ground fault. The quality of power supply is deteriorated since the ground fault is not detected promptly. This paper analyzes the problems about system-grounding type of 2 step power receiving & transforming facility, arrangement of protection relaying scheme and ground-fault protection system of ungrounded system. Then, this paper presents the arranging scheme of system-grounding type to improve power supply reliability.

Keywords

References

  1. 신대승, “보호계전시스템 기술”, pp.239-246, 2007.
  2. 의제, “전기설비 기술계산 핸드북”, pp.III93-136, 1999.
  3. 송길영, “최신 송.배전공학”, pp207-239, 2010.
  4. “22[kV] 지중배전계통의 저항접지방식 전환검토”, 한국전력공사, pp127-137, 1984.
  5. IEEE Std 141-1993, IEEE Recommended Practice for Electric Power Distribution for Industrial Plants, pp185-391, 1993.