• 제목/요약/키워드: post-construction evaluation

검색결과 174건 처리시간 0.025초

내진성능평가에 따른 정밀안전진단 및 내진 보수보강 조치의 개선방안 연구 (A study on the improvement plan for precision safety diagnosis and seismic repair and reinforcement measures according to seismic performance evaluation)

  • 김장욱
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.87-88
    • /
    • 2022
  • For an earthquake-safe urban environment, the Republic of Korea conducts seismic performance evaluation in accordance with laws and guidelines to assign safety ratings and implement necessary management measures such as repairs and reinforcements. In the seismic performance evaluation result, structures lacking in preparation for earthquakes are prioritized and classified into measures such as repair, reinforcement, or careful observation to respond to physical risks such as earthquakes. Such repair and reinforcement work is not a one-time thing, but it is necessary to further enhance the effect through continuous follow-up observation. In this study, the location of the vertical and horizontal displacement measuring part of the construction part is displayed so that the post-construction status of the reinforcement construction part can be visually checked by identifying the problems in the process of post-monitoring in 2022 for the maintenance and reinforcement work of local governments' public facilities carried out in 2021. We propose a plan to institutionalize the installation of, inspection tools, and crack gauges at certain locations in the construction department, and to have facility managers periodically inspect and manage them with a smartphone program or the 'Facility Autonomous Safety Inspection' app.

  • PDF

덕유산 국립공원 무주리조트개발 환경영향평가서 문제점 고찰 - 생태계, 수문, 토지이용 항목을 대상으로 - (The Inquiry into EIS for Muju Resort Development in Mt. Teogyu National Park - Focused on Ecology, Hydrology, and Landuse -)

  • 이규석;안승만
    • 환경영향평가
    • /
    • 제9권3호
    • /
    • pp.229-238
    • /
    • 2000
  • Muju Resort Development environmental impact statement(EIS) in Mt. Teogyu National Park are evaluated with the results of post-environmental evaluation. Three EIA items (ecosystem, hydrology, landuse) are investigated. In terms of ecosystem and hydrology, the environment during construction period was compared with post-construction and it was also true of hydrology section. The land use surrounding the resort area have been changed seriously, and the wildlife in large patch are endangered with the fragmentation by road and resort construction. The three items in the Muju Resort EIS was not assessed properly. So, in order to assess properly accurate data, appropriate approach, and periodical post evaluation are required.

  • PDF

예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구 (Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data)

  • 문준부;윤성민
    • 한국건설관리학회논문집
    • /
    • 제24권1호
    • /
    • pp.3-11
    • /
    • 2023
  • 현재 국내에서는 건설공사 사후평가 제도에 따라 사업 준공 후 공사내용 및 그 효과를 조사하여 프로젝트의 성과를 평가하고 향후 계획된 유사 건설사업의 효율적인 수행을 위한 자료로 활용하고 있다. 그러나 건설사업의 성과를 보다 효과적으로 관리하기 위해서는 프로젝트 진행 과정에서 단계별 성과를 평가하여 그에 따른 유연한 관리전략을 수립할 수 있어야 한다. 따라서 건설사업의 효율적인 성과관리를 위해서는 건설사업 단계별 성과평가체계가 필요하다. 본 연구는 건설사업 초기단계의 성과를 평가할 수 있는 계획단계 벤치마킹을 위한 기초 모델을 제시하고자 한다. 이를 위하여 본 연구에서는 한국개발연구원에서 제공하고 있는 예비타당성 조사 보고서 중 완료된 도로공사 354건에 대해 데이터베이스를 구축하였다. 계획단계 성과를 평가할 성과지표로 시설용량을 기준으로 한 표준공사비와 표준공사기간 지표를 개발하여 도로사업의 계획단계의 성과를 분석할 수 있는 벤치마킹 모델을 제시하였다. 이를 통해 도로사업 계획단계의 표준공사비 및 표준공사기간을 산정하고, 도로사업의 특성별 차이를 분석하였다. 본 연구의 결과를 활용하여 계획단계의 성과와 설계 및 시공단계의 성과를 연계하여 분석한다면 건설사업 생애주기 동안의 성과관리가 가능할 것으로 기대된다.

경관영향평가 기법을 통한 댐건설에 대한 경관영향평가 (The Visual Impact Assessment in Dam Construction Using Visual Impact Assessment Method)

  • 김대현;구본학
    • 한국조경학회지
    • /
    • 제27권4호
    • /
    • pp.80-86
    • /
    • 1999
  • The purpose of this study was to suggest a case study and anlaysis of the visual impact in dam construction through visual impact assessment method in Dong-sang river. The results can be summarized as follows; 1) For the evaluation of the visual impact of dam construction, five steps such as field analysis of visual status, finding visual sensitivity area and visual control point, making visual simulation material and evaluation, and visual impact analysis and assessment were suggested as desirable. 2) In the case study, the visual impact of dam construction was evaluated to be simple, unique, modern, static, cool and unfamiliar. 3) There was a few difference between the pre-construction and post-construction in statistical test. Especially, The dam in Man-Jee area was evaluated to be artificial, unique and destroyed in statistical difference, and then we design dam structure with visual friendliness. 4) In conclusion, there was high correlation between pre-construction landscape and post-construction landscape through semantic differential scale method using eleven adjectives. Therefore, we state that there is no visual impact for the dam construction for the moment.

  • PDF

공공건축공사 사후평가 변별력 향상을 위한 항목개선 연구 (A Study on the Improvement of Item for Discrimination Increasing in Post Evaluation of Public Building Construction Project)

  • 윤태형;이수용
    • 한국건설관리학회논문집
    • /
    • 제12권2호
    • /
    • pp.21-31
    • /
    • 2011
  • 국토해양부는 공공 건설사업의 효율화를 유도 하기위한 목적으로 건설공사 사후평가 시행지침을 2001년 05월 10일 건관 58824-318호로 제정 공포하고 이후 지금까지 5차례에 걸쳐 개정 하였다. 이 지침의 관련근거는 건설기술 관리법 시행령 제38조 18항이며, 주요내용은 사업의 당초 입안 기획에서부터 실제 공사수행 완료에 이르기 까지 전 과정에 대하여 수행성과, 효율, 파급효과 등에 관한 평가를 준공 후 실시하고 그 결과를 데이터베이스화 하는 것이다. 지침의 적용범위는 SOC사업 및 상당한 규모의 토목공사를 대상으로 하였으나, 최근 개정된 지침인 국토해양부 고시 제2010-14호(2010년 01월 15일)에서 건축분야를 추가 하였다. 그러나 개정된 내용도 평가항목의 성격이 포괄적이거나 정량적 평가기준으로는 미흡함이 많아 실제 평가결과를 차후 활용할 수 있는 방향제시의 분명함이 부족하고, 또한 평가과정에서 절대평가를 수행하기에도 어려움이 따른다. 따라서 본 연구는 공공 건축공사 사후평가 과정에 필요한 평가항목의 개선에 집중 하였다. 개선의 방향은 평가항목을 관련 전문가들에게 설문조사를 통하여 변별력 증대에 기여할 수 있도록 조정하며, 또한 현실적으로 점수화 할 수 있는 항목임에도 기준이 모호한 것은 향상된 평가지표를 제시 하고자 한다. 이를 통해 사후평가 지침의 목적인 추후 유사한 프로젝트에 활용하는 기능을 더욱 향상 시킬 수 있을 것으로 기대한다.

선보상-후시공 제도의 공공건설사업 파급효과 분석 (Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects)

  • 김상범;최정원
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.245-254
    • /
    • 2004
  • '선보상-후시공 제도화' 대책은 1999년 「공공건설사업 효율화 종합대책」의 세부 대책으로서 공공건설 사업비용 $90\%$ 절감을 목표로 수행되었다. 이에 본 연구에서는 대책의 성과를 측정하고 분석하여 향후의 개선 사항 및 제안을 위해, 종합대책 이전과 이후로 구분하여 관련 자료를 분석함으로써 대책에 대한 성과 분석 연구를 수행하였다. 이러한 성과의 분석은 사업비와 사업기간의 관점에서 정량적인 성과 측정을 중심으로 이루어 졌으며, 선보상-후시공 제도화 대책의 성과로 인한 종합대책의 전체성과에 대한 기여도와 향후 제안 사항 등을 기술하였다. 연구 결과 본 대책은 약 $4.83\%$의 공공건설 예산 절감효과가 있는 것으로 분석되었으며, 공기 절감 면에서도 긍정적 파급효과가 있는 것으로 나타났다.

공공공사 성과측정을 위한 사후평가항목 개선방안에 관한 연구 (A Study on the Reformation Proposal of Post-Evaluation Indicator for Performance Measurement in the Public Construction)

  • 이은지;김경환;이윤선;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.523-526
    • /
    • 2007
  • 국내 건설산업은 활발한 해외시장 개척 및 정부의 주택보급정책 등에 의해 양적인 성장을 이루어 왔으나 최근 경쟁력 중심의 새로운 전략적 성장에 대한 관심이 높아지면서 공공건설사업의 성과측정을 필요로 하게 되었다. 현재 건설공사 완료 후 타당성 분석결과를 검증하고 공사내용 및 효과를 조사 ${\cdot}$분석하여 향후 유사 건설사업에 활용하기 위하여 2000년 3월부터 ${\lceil}$건설기술관리법 시행령 제 38조의18${\rfloor}$${\lceil}$건설공사 사후평가 시행지침('01.05.10, 건관 58824 -318)${\rfloor}$에 의한 '건설공사 사후평가'제도를 제정하여 시행하고 있으나 이에 대한 인식도 및 활용도가 미미한 실정이다. 따라서 본 연구에서는 건설공사 사후평가시스템을 추후 유사 공사에 적극적으로 활용 될 수 있도록 평가항목 및 절차에 대한 개선방안 및 예비평가항목을 제시하였다.

  • PDF

건설공사 성과측정시스템의 사후평가항목 영향요인 분석에 대한 기초연구 (A Basis Study on the Influential Factors Analysis of Post-Evaluation Item of Performance Measurement System in Construction Project)

  • 이은지;하희윤;최진욱;정경택;박치호;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.347-350
    • /
    • 2006
  • 오늘날 우리나라의 건설산업은 변화의 한복판에 서 있다. 건설산업은 점차 대형화, 전문화, 고도화되어 가고 있으며 타 산업과의 융합 또한 빠른 속도로 진행되고 있다. 이러한 추세에 따라 이해관계자들이 참여하는 건설사업의 프로젝트 수행과정 평가의 투명성과 객관적 평가방법에 대한 요구가 높아지고 있으며 발주자 및 고객의 니즈(Needs)는 보다 구체화 되고 있다. 그 수준 또한 높아지고 있어 프로젝트의 성공 여부를 판단하기 위한 객관적 평가기준을 필요로 하고 있다. 본 연구에서는 기존 건설사업 성과측정 시스템 분석을 통해 문제점을 파악하고 이를 바탕으로 고객만족 등의 정성적 평가부분을 포함한 사후평가에 대한 영향요인을 분석하여 새로운 성과측정 시스템을 제시하고자 한다.

  • PDF

건설신기술의 현장활용 저해요인 분석 및 활성화 방안 (Examination of Obstacles Impeding the Deployment of New Construction Technologies On-Site and Development of an Activation Strategy)

  • 박환표;배병윤
    • 한국건축시공학회지
    • /
    • 제23권4호
    • /
    • pp.369-380
    • /
    • 2023
  • 국내 건설신기술제도는 건설업계의 자발적인 기술개발을 유도하여 국내 건설기술 수준 향상 및 경쟁력 강화에 기여하였다. 특히 건설신기술의 현장적용으로 공사비 절감 및 공기단축의 성과를 달성하였다. 그러나 건설신기술제도가 도입된 지 33년이 지났지만, 건설신기술의 매년 지정건수와 건설현장 활용실적은 정체 수준이다. 따라서 본 연구는 건설신기술의 현장활용 저해요인을 다각적으로 분석하고, 현장활용 활성화 방안을 제안하였다. 주요 결과는 건설신기술 활용실적 모니터링 제도 도입, 특정공법심의 기술위주의 평가, 건설신기술 사후평가시스템 개선, 건설신기술의 기술마켓시스템 등록체계 구축, 건설신기술의 활용실적 관리방안을 제안하였다. 이러한 제도개선은 건설신기술의 현장활용을 촉진할 것으로 기대된다.