Standardization for Post-Construction Evaluation Report (건설공사 사후평가결과보고서 표준화 방안)

  • Kim, Kyong hoon;Lee, Chankyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF

Strategies for Facilitating Post-Construction Evaluation and Management System (건설공사 사후평가 제도 활성화 방안 수립)

  • Lee, Kang-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

A Study on the Relationship between the Ante and Post Audit Companies Evaluation (감리업체 사전/사후 평가방안의 공학적 연계)

  • Sunwoo, Jong Sung
    • Journal of Information Technology Services
    • /
    • v.3 no.1
    • /
    • pp.117-126
    • /
    • 2004
  • In this study an evaluation method is proposed, with the strong relationship between the ante and post audit works evaluation. The ante evaluation does in general and systematic ways, with past audit results and proposals. The criteria-based evaluation is used for the audit activities and outputs. The critical success factors for the projects applies to the activities evaluation and product evaluation framework to the output. The ante and post evaluation have the cross evaluation items to be the whole and continuous one. Eighteen common evaluation items are derived, with their own evaluation elements in detail, which have only differences of the actually done and expectations between the ante and post. The proposed evaluation makes the ante and post one to be related with each other in a systematic and objective ways, to enhance the reliability of audit results and effectiveness of the audit.

A Case Study of the Discrepancy between Ex Ante and Ex Post Evaluation of IS Performance (정보화 성과의 사전-사후평가 차이에 관한 사례연구)

  • Lee, Kuk-Hie;Park, So-Hyun;Gu, Bon-Jae;Lee, Mi-Young
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.2
    • /
    • pp.59-78
    • /
    • 2012
  • The purpose of this longitudinal case study is to shed light on the reliability problems of IS performance evaluation by analyzing the discrepancy between ex ante evaluation in 2011 and ex post evaluation in 2012. Through an information system development project of a public enterprise, the gap between ex ante and ex post evaluation was ascertained and the causes as to why such gap occurs and the success factors that can solve the problems were derived. The ex ante evaluation of IS performance was performed based on both IS success model and BSC model and the ex post evaluation was carried out at the time after the target system has been built up by applying the evaluation measures and process that are similar to the ex ante evaluation. In the ex ante evaluation the business performance improved by the target system was estimated to 18.2%. On the other hand, it was seen as being low at 15.2% in the ex post evaluation and the differences were found to be statistically significant in 6 out of 10 measures. The reasons as to why such gap occurs were diagnosed as being of 2 types : (1) changes in the evaluation psychology according to the differences in the evaluation objectives; and (2) excessive expectation levels of the target system that is formed at the time of the ex ante evaluation. In other words, the users who have excessive expectations tend to overestimate in the ex ante evaluation and, in the ex post evaluation, tend to underestimate lower than the actual performance mainly due to disappointment on the results that do not meet the early expectations. As solutions to overcome the reliability problem of ex ante evaluation, 3 factors were derived : (1) the temperance of excessive expectation levels of the users; (2) a clear definition of the scope and functionality of the target system; and (3) actual commitments for the evaluations of IT performance.

Evaluation Criteria of IT Business Value : The Difference Between Ex Ante and Post Implementation Evaluation (IT 비즈니스 가치 평가관점 : 사전-사후 평가시점 및 정보시스템 유형별 차이)

  • Park, So-Hyun;Lee, Kuk-Hie
    • Journal of Information Technology Applications and Management
    • /
    • v.15 no.1
    • /
    • pp.203-224
    • /
    • 2008
  • The purpose of this study is to investigate the evaluation perspectives of IT business value and empirically analyze the differences of evaluation perspectives between ex ante evaluation and post implementation evaluation, and among various information system types. 4 evaluation perspectives which have been used in the previous studies and in the field of industry practices are financial, customer, internal process, and growth, which are based on the BSC model. Data of 98 information systems have been collected from 89 companies including manufacturers, banks, insurances, and stock trading companies. As results of multi-way MANOVA test, 3 out of 8 hypothesis have been accepted statistically. While the order of importance of 4 perspectives in ex ante evaluation is customer, financial, internal process, and growth, the order of post implementation evaluation appears to be much different : that is, internal process, customer, financial, and growth. These findings provide insights for both IT practitioners and researchers.

  • PDF

Improvement scheme of utilization of the results of the post-construction evaluation system (건설공사 사후평가 수행결과 활용도 개선 방안)

  • Lee, Du-Heon;Park, Jae-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.78-89
    • /
    • 2013
  • Post-evaluation system reflects the results of performing a public construction project in the future similar public construction projects to be utilized in the planning. However, the current system simply compares the expected values, such as demand, B/C ratio, cost of construction, construction period, with the actual values after the completion of construction. In addition, most public owner does not actively conduct the post-construction evaluation tasks, so that the evaluation results has not been returned to early stage of a construction project. In this study, status of the post-construction evaluation system is investigated by a survey of the public owner and the construction project evaluation system of the United States and Japan was analyzed. This paper presents the improvement scheme of utilization of the results of the post-construction evaluation system. Through improving the post-construction evaluation system, it is expected that public agencies would easily utilize the post-construction evaluation.

A Study on the Effect of Practice on Post-Management According to the Change in Perception of Quality Control Personnel: Focusing on Korea Standards Certification Factory Review Evaluation Criteria (품질관리 담당자의 인식 변화에 따라 실행이 사후관리에 미치는 영향에 관한 연구: KS 인증 공장심사 평가항목을 중심으로)

  • Taek-Yeon Yoo;Jung Eui Hong
    • Journal of the Korea Safety Management & Science
    • /
    • v.26 no.3
    • /
    • pp.123-131
    • /
    • 2024
  • In this study, two things were analyzed for Korean Standards certification factory review evaluation items. First, it was examined whether there is a difference between the Practice of factory review evaluation items and Post-Management according to the change in perception of the factory review evaluation items of Korean Standards certification personnel. Second, the moderating effect of the Korean Standards certification personnel's perception of the effect of the Practice of the factory review evaluation items of Korean Standards certification personnel on Post-Management was verified. Although there is a statistically significant difference between Practice and Post-Management according to changes in perception of Korean Standards personnel, there is no statistically significant difference in the impact (slope) of Practice on Post-Management according to changes in perception of Korean Standards certification personnel. As the perception of factory review evaluation items increases, the Practice and Post-Management of factory review evaluation items are increasing, but the impact of the Practice of factory review evaluation items on Post-Management does not affect it. In order to further advance Korean Standards certification, which plays an important role in maintaining the quality level of products produced by companies, efforts to raise the level of perception of Korean Standards certification personnel are considered necessary.

A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects (건설공사 사후평가 전문기관 설치 필요성 연구)

  • Lee, Du-Heon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.285-295
    • /
    • 2016
  • The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.

The Re-Post Occupancy Evaluation of the Neighborhood Park -With Focus on Bundang Central Park-

  • Kim, Sung-Hee;Kwon, Young-Hyoo;Sim, Woo-Kyung
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.1
    • /
    • pp.183-191
    • /
    • 2001
  • The purpose of this study is to provide guidelines for planning, designing and managing neighborhood parks. Results form POE(Post-Occupancy-Evaluation) and RPOE(Re-Post-Occupancy-Evaluation) are analyzed for this study. Bundang Central Park in Bundang Newtown was selected for this study. This study compared the previous POE completed in 1996 with a RPOE conducted in 2001 to find out how the user, proximate environmental context, and the park administration changed in time and apply feedback for purposes of immediate problem solving. The results of this study showed that RPOE has to be initiated and utilized periodically as a device and the guideline for neighborhood park design, conservation, administration and operation.

  • PDF

A Study on Improvement Evaluation of Reliability of Ex-post (사후평가의 평가체계 개선방안에 관한 연구)

  • Jo, Chang-Hee;Kim, Si-Gon;Ahn, Chan-Gi
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2182-2191
    • /
    • 2011
  • Postmortem evaluation through the dictionary and the lack of points for the wrong strategy to respond to the avoid the prediction is important. However, the prevailing system of ex post facto assessment of postmortem simply does not have statistical figures to be provided only for the conditions. Thus, in this study, rail business is mainly evaluation procedures and evaluation of the verification system of ex post facto evaluation as to the issue, do not improve.

  • PDF