• Title/Summary/Keyword: port construction

Search Result 670, Processing Time 0.021 seconds

VIRTUAL REALITY SHIP SIMULATOR

  • Yim, Jeong-Bin
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2000.06a
    • /
    • pp.93-105
    • /
    • 2000
  • This paper describes prototype Virtual Reality Ship Simulator (VRSS) that we have recently developed next-generation training equipment based on the virtual reality (VR) technology. The inherent defects of conventional ship simulators are enormous costs and difficult system upgrade due to the system construction, such as large mock-up bridge system, wide visual presentations, In this paper, to cope with those problems, we explored VR technology that can give realistic environments in a virtual world. Then we constructed prototype VRSS system, which is, consists of PC-based human sensors, and Databases set having 3D object models and coefficients of Head Related Transfer Functions (HRTFs). 3D-WEBMASTER authoring tool was used as Virtual Reality Modeling Language (VRML). Using the VRSS system, we constructed Port an Passage Simulator for the harbor of INCHON in Korea, and Ship and Sea State Simulator for an arbitrary given sea environmental states by user. Through many simulation tests, we testified the efficiency of developed prototype VRSS by subject assessment with five participants. Then, we present results on the simulation experiments and conclude with discussion of evaluation results.

  • PDF

Application Case of Shipbuilding F/D for Port Construction (조선용 F/D의 항만건설현장 적용사례)

  • Kim, Yeong-Hak;Jeong, Uk-Jin;Hong, Jang-Ho
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.11a
    • /
    • pp.52-54
    • /
    • 2018
  • 울산신항 북방파제(제3공구)축조공사에서는 국내 최초로 선박제조용 F/D(Floating Dock)선을 적용하여 케이슨 제작 및 거치공사를 실시하였으며, 공장형 슬립폼 제작장(IP-CCV)를 적용한 경우 보다 공기단축 및 원가절감의 효과가 있었다. F/D선 공법 순서는 작업부두에 F/D선 접안, 케이슨 제작, F/D선 진수장 이동, F/D선 및 케이슨 진수, 케이슨 예인 및 거치의 순서로 시행되었으며, 현재 턴키공사의 설계특화 내용으로 활용되어 시공안정성 향상 및 공기, 공사비 절감 방안으로 적용되고 있다. 향후 남북관계가 원만히 해결되어 동해안 항만개발이 가속화되면 국외특허공법(IP-CCV)에 의존없이 경쟁력있는 공법이라 판단된다.

  • PDF

Simulation of Topograhy Change in the Downstream of Nakdong River Estuary (낙동강 하구 하류역 지형변화 예측)

  • Kim, Kang-Min;Lee, Joong-Woo;Huh, Myung-Kyu;Jeong, Dae-Duck;Lee, Hyeong-Ha
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.11a
    • /
    • pp.38-39
    • /
    • 2018
  • 낙동강 하구 하류역의 지형변화는 장기간에 걸쳐 변화가 발생하고, 이러한 지형변화의 메커니즘을 파악하는 것은 하구의 관리방안과 처리방법 등을 연구하는데 있어서 매우 중요하다. 본 연구에서는 낙동강 하구 하류역의 지형변동에 관한 기초자료를 수집 분석하였으며, 이를 근거하여 지형변화 예측실험을 수행하였다. 실험결과, 하굿둑 건설과 부산신항 건설 등의 대규모 개발사업으로 인한 해수면 축소로 인한 유속감소로 인하여 전반적인 퇴적우세 현상이 지속되는 것으로 나타났다. 또한, 해빈류 실험결과 울타리선 남쪽과 동서쪽으로 지형 발달 및 성장이 지속될 것이라 판단된다.

  • PDF

A Case Study on Construction of New Revetments for Disposal Site of Incheon New Port (인천신항 신규 준설토투기장 호안축조공사 설계사례)

  • Jo, Hyu-Sang;Pi, Tae-Hui
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2019.05a
    • /
    • pp.59-62
    • /
    • 2019
  • 인천신항 내 기존 준설토 투기장은 2018년에 수토가 완료 될 예정이므로 향후 항만개발과 운영시 발생되는 준설토의 원활한 처리를 위해서는 신규 준설토 투기장 조성이 필요하다. 투기장 조성을 위해서는 중 장기적인 준설토 처리방안 등을 고려한 항만기능 향상과 경쟁력 강화를 위한 준설토 투기장 호안 축조가 선행되어야 하기 때문에 극동건설 컨소시움에서는 퍼펙트델타라는 설계컨셉을 수립하고 내구성과 안전성을 강화한 설계, 조기수토 공간확보 및 수토용량 증대, 자연과 인간 도시가 함께하는 환경 친화적인 설계, 현장여건에 가장 적합한 설계를 구현하였다.

  • PDF

A Case Study on Construction of Container Terminal (2-6 Stage) in Busan New Port (부산항 신항 서컨테이너터미널(2-6단계) 축조공사 설계사례)

  • Kim, Yeong-Hak;Jeong, Uk-Jin;Yun, Gi-Seung;Hong, Jang-Ho
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2019.05a
    • /
    • pp.63-65
    • /
    • 2019
  • 부산항 신항 서컨테이너터미널은 선박 대형화와 완전 무인 자동화부두 구축이라는 설계컨셉에 따라 접안 가능한 최대선박은 3만 TEU 선박으로 결정하고 그에 따라 제반 시설들의 규격을 증대하였으며, 상부 자동화 설비들의 운영에 지장이 발생하지 않도록 대형 유수실, 월파차단벽 등의 침수 방지시설과 크레인 및 AGV구간 부등침하 방지를 위해 41.5m의 광폭케이슨과 176m의 광폭 DCM기초를 적용하고, 최신 설계기준에 의거한 내진 I 등급 구조물로 계획하는 등 안전하고 이용성이 뛰어난 컨테이너 터미널이 구축되도록 하였다.

  • PDF

A study on installation location of radar for minimizing blind area in the construction of VTS system of Kangjeong Port (강정항 VTS 시스템 구축시 음영구역 최소화를 위한 레이더의 위치설정에 관한 연구)

  • LEE, Seung-Hi;KIM, Kwang-Il;AHN, Jang-young;LEE, Chang-Heon;CHOI, Chan-Moon
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.53 no.2
    • /
    • pp.187-195
    • /
    • 2017
  • We have studied the efficient operation of the radar and the appropriateness of the installation location, when constructing the VTS system. As the Civil-Military Complex Harbour (Kangjeong Port) is completed in 2016, we set the control area within 10 nautical miles centering on Kangjeong Port, and found out and removed the operational radar blind area of VTS system to provide safe navigation information for vessels that navigating this area. Assuming that two international cruise ships entering at the same time, we performed the radar simulation and compared the images by considering the three sites of Kangjeong Port, Miaksan and Seoguipo Port. Simulation results for a single radar installed at Kangjung Port indicate that the blind area was largely affected by two large cruise ships and the surrounding islands. The blind area due to Kogunsan was considerably large when installed in Miaksan, but the blind area due to the influences of Beomseom, Moonseom and Seopseom was negligibly large. It seems that additional radar installation is necessary as a complementary solution to solve this blind area. When two radars were installed at Miaksan and Kangjeong Port, the residual blind area due to the Seopseom was $0.25km^2$ at 0.1~0.33 nautical miles in the southeast direction from Seopseom. In addition, the remaining blind area with two cruise ships mutually influenced was $0.18km^2$, which did not occur with a single cruise ship.

A Lean Logistics Model for Improving the Port Logistics in the Steel Industry (철강산업 린 기반 항만물류프로세스 개선 모델 구현)

  • Kim, Jung-Hoon;Nam, Ho-Ki
    • Convergence Security Journal
    • /
    • v.8 no.1
    • /
    • pp.101-108
    • /
    • 2008
  • This research focuses on the process improvement of port logistics by using Lean methodology. On the one hand, we firstly analyze the current situation and weakness of the processes in port logistics, and then re-design the current processes by the principles of Lean discipline. Based on the appropriately changed processes, the improvement scheme of port logistics will be figured out. On the other hand, we construct the port logistics system by implementing the improved processes. The port logistics' processes accomplished in steel company will be further assorted and identified. The relationship of wharves process, operational process, shipping process, construction process, quality process, and purchasing process are also defined. Every process has been improved by Lean Tools in order to analyze the value added or non-value added processes, to improve the service level, and to reduce the cycle time, inventory, changing time, re-working and waste. Based on above, the appropriate environment that is suitable to Lean process of port logistics will be established and the modeling that can help to implement the improvement scheme will be figured out.

  • PDF

Study on Installation of Sector Lights for the Establishment of Safe Navigation Environment in Busan Port (부산항 안전항해환경 조성을 위한 지향등 설치방안 연구)

  • JEONG, Hae-Sang;LEE, Jong-Cheol;KIM, Jeong-Rok;GUG, Seung-Gi
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2019.11a
    • /
    • pp.87-88
    • /
    • 2019
  • Leading Lights and Sector Lights provide a navigable channel, heading reference and a visual indication. Mariners can take easily a reference bearing or line of position. The Busan North Port needed to install a sector light to resolve blind sections because of Busan Port Redevelopment Project D-1 Block Construction Plan. And also the busan new port needed to install a sector light to give safety indication because navigation conditions will be changed due to removal of the to-island. For this reason, design development was made for installation of sector lights. In addition, the results of design development were compared with the AtoN simulation and verified. This paper is expected to be very useful for installing Sector Lights to guide the vessel to port safely in Korea.

  • PDF

A Study on the Smart Port Introduction Tasks and Improvement Plans in Korean Ports (우리나라 항만에서의 스마트 항만 도입 과제와 개선 방안)

  • Song, Jong-Moo;Kim, Hwan-Seong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2020.11a
    • /
    • pp.167-168
    • /
    • 2020
  • In line with the low growth trend of the global economy, shipping companies and port companies are experiencing various management difficulties. However, at this time when the growth trend is stagnating, attempts to solve the breakthrough in growth with the technology of the 4th industrial revolution are occurring in various industries and technologies. In this study, in order to facilitate the construction of smart ports in the future, we will look at the current port system in Korea, and in the sense of the need for a basic study to diagnose the direction for more smooth policy introduction and technology introduction, Related exploratory studies were conducted. To achieve the purpose of this study, various previous studies were reviewed, news articles related to ports, reports of the Ministry of Oceans and Fisheries, and foreign literature were reviewed in a variety of ways, and based on this, we intend to present smart port introduction tasks and improvement plans.

  • PDF

Study on the measurement of the cylinder lengths of an underwater robot for harbour construction using a pressure sensor (압력센서를 이용한 수중항만공사 로봇의 실린더 길이 측정에 관한 연구)

  • Kim, Chi-Hyo;Kim, Tae-Sung;Lee, Min-Ki
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2012.06a
    • /
    • pp.9-10
    • /
    • 2012
  • This paper presents an observer to measure the lengths of cylinders of an underwater robot for harbour construction using a pressure sensor. In harbour constructing, we place heavy armour stones weighing over 2~3 tons on the surface of the bank to protect it from storming wave. This work typically done by a diver is difficult and dangerous so that we have developed Stone Diver which is the underwater robot for harbour construction. The robot needs a position sensor to control the hydraulic cylinder. The position sensors mounted outside the cylinders cause poor durability in construction site where shock and dust usually occur. However, the pressure sensor mounted inside a waterproof box improves the durability. Based on the dynamic parameters and the pressures in the cylinder, the observer measures the cylinder's position. This paper presents the positional accuracy of the pressure based observer and the performance of the underwater robot to assemble the armour stones.

  • PDF