• Title/Summary/Keyword: planned change

Search Result 451, Processing Time 0.029 seconds

Application & Examination of the Plan for Optimum Stability through Water-hammer in Pipe Line and Booster Pump Station (관로계통 및 가압펌프장 수격에 따른 최적 안정성 확보방안)

  • Ra, Beyong-Pil;Park, Jong-Ho
    • The KSFM Journal of Fluid Machinery
    • /
    • v.12 no.5
    • /
    • pp.19-24
    • /
    • 2009
  • This paper is performed to find out the stability of water-hammer in pipe line and pump station that is happened when additional water needs demanded. At first, the water supply construction project is planned to supply $6,000\;m^3/day$ through 17.9 km pipe line. But additional demand ($1,200\;m^3/day$) happened from Cheong-ra water reservoir. In this situation, air-chamber($4\;m^3$) and vacuum breaker valve(${\varphi}100\;mm$) are needed to prevent water-hammer. When the additional water is supplied, the existing facilities (air-chamber, vacuum breaker valve) are sufficient to alleviate shock not changing capacity alteration, judging from the airspace change and rise. Therefore, there is no problem for water-hammer by installing air-chamber($4\;m^3$) and vacuum breaker valve(${\varphi}100\;mm$) at the top of Yeo-ju hill.

POST-OPERATIVE SKELETAL STABILITY OF THE MAXILLA TREATED WITH LE FORT I AND U-SHAPED OSTEOTOMIES IN SIMULTANEOUS MAXILLOMANDIBULAR ORTHOGNATHIC SURGERY (양악 악교정 수술에서 르포트 I형과 U-자형 복합 골절단술 후 상악골의 안정성에 관한 임상적 연구)

  • Kim, Min-Keun;Park, Young-Wook
    • Maxillofacial Plastic and Reconstructive Surgery
    • /
    • v.31 no.6
    • /
    • pp.485-491
    • /
    • 2009
  • Postoperative skeletal stability was evaluated in combination of Le Fort I and U-shaped osteotomies for superior repositioning of maxilla in bi-maxillary surgeries in 30 consecutive patients. The fifteen patients underwent Le Fort I osteotomy alone and the other fifteen patients underwent Le Fort I and U-shaped osteotomies. In all patients, the maxilla was first osteomized and fixed with absorbable plates system. A bilateral sagittal split ramus osteotomy (BSSRO) of the mandible was then carried out and fixation was performed using absorbable plates. Maxillo-mandibular fixation with rubber ring was used for two weeks post-operatively in all patients. Lateral cephalograms were obtained pre-operatively, 1 day post-operatively, 6 months after surgery. The changes in anterior nasal spine (ANS), point A, upper incisior (U1), and point of maxillary tuberosity (PMT) were examined. The maxillas in the fifteen patients of both examination group were repositioned nearly in their planned positions during surgery and no significant post-operative changes in the examined points of the maxilla were found. These results suggest that a combination of a Le Fort I and U-shaped osteotomy is a useful technique for reliable superior repositioning of the maxilla. The post-operative change in the maxilla using this combination osteotomy was comparatively stable.

Long-term Riverbed Change Simulation and Analisys in the River (하천의 장기 지형변화 고찰 및 하상변동 모의)

  • Hwang, Soo Deok;Choi, Seon Ho;Lee, Sang Jin;Jang, Chang Lae
    • Spatial Information Research
    • /
    • v.21 no.5
    • /
    • pp.1-6
    • /
    • 2013
  • Trying to estimate variations of the riverbed is basic and important for river management. When new dam constructed in upstream and a structure were planned, impact of the riverbed changes in downstream should be considered for stably maintained and sustained rivers in the future. In this study, long-term riverbed changes analyzed using aerial photographs in Naeseongcheon. Also applying one-dimensional numerical model, GSTARS analyzed the effects of bed deformation in critical points. Based on Changing Patterns of long-term riverbed, it is possible that after the dam was built, to explore how to manage Naeseongcheon.

Functional Improvement after the Gross Motor Function Measure-88 (GMFM-88) Item-Based Training in Children with Cerebral Palsy

  • Ko, Jooyeon
    • The Journal of Korean Physical Therapy
    • /
    • v.29 no.3
    • /
    • pp.115-121
    • /
    • 2017
  • Purpose: The aim of this study was to investigate applicability of the GMFM-88 in planning intervention for CP children. Specifically, this study assessed functional improvement after a four-week GMFM-88 item-based training in CP children divided into three age groups (${\leq}24$ months, 25-48 months, and >48 months) and five levels of the gross motor function classification system (GMFCS). Methods: Subjects were 264 children with CP (mean age 32.90 months) recruited from one CP clinic. The GMFM-88 item-based training was planned for each child, after an interview with its caregiver. To investigate functional improvement after the intervention, minimum important difference (MID) and MID proportion for the change in scores of GMFM-88 were calculated. Results: The GMFM-88 scores increased after the interventions in all three age groups (p<0.05). In particular, children with CP aged ${\leq}24$ months and at the GMFCS level II showed greater functional improvement after training. Conclusion: This study found that the GMFM-88 item-based training would be used to plan activity-oriented intervention both in clinic and home in each CP child.

The Cooling System for Head up Display (Head up Display용 냉각시스템)

  • Ji, Youg-Seok;Kim, Young-Seop;An, Byeong-Man;Lim, Sang-Min
    • Journal of the Semiconductor & Display Technology
    • /
    • v.9 no.1
    • /
    • pp.67-71
    • /
    • 2010
  • Head up display’s cooling system is auto-diagnosed resulting from the external environment. The quantity of heat depending on this Head up display’s cooling system layout determines the speed of FAN for system cooling. In other words, a system’s heat quantity is planned through the air density depending on altitude, the amount of wind in air depending on FAN control condition, and the algorithm that is proportional to delta temperature. To detect the altitude, we use the criteria of delta T, which is determined by the subtracted value of LED junction temperature, and atmospheric temperature that is recorded on the Head up display system. Depending on the classification of delta T value, the altitude section is determined. While we can use GPS as the tool to detect the altitude, we should predict the change of the air density as the altitude alters, and should not just measure the altitude. And the value of delta T is used as the criterion of detecting the altitude for increasing the cooling efficiency of the car’s inner Head up display system with reflecting the speed of the FAN dependent upon the air density. In our theory, altitude is depending on the value of delta T and stabilizing or maintaining the system’s temperature by changing FAN’s rpm depending on determined value of altitude.

A Program Generating and Managing Track Data for Smart Train Route Control (Smart열차진로제어를 위한 선로데이터 생성.관리프로그램)

  • Yoon, Yong-Ki;Lee, Young-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1741-1745
    • /
    • 2007
  • Even though the existing train route controlling method, using track circuits, ensures the sufficient number of operation, it still has problems such as discordance between train numbers which was planned for operating and train numbers being operated on the track, and allowing only one train entering for one route. To solve those problems, we study and develop the Smart train route controlling system which uses the real-time informations of train positions. This system enables improve the coefficient of utilization in a certain train route controlling section, and the safety level of train route controlling, but we should ensure satisfying reliability of data about tracks operated by trains. In addition, there is a need to protect accidents caused by erroneous information of train position, by reflecting changes of tracks, for example maintenance, improvement, expansion of tracks. In this paper, we proposes and describes a developed program which required to change AutoCAD files to wiring diagrams, to generate them to data of tracks, to identify errors of those data, to construct the structure of necessary resource(s) for sub-systems of a train control system, and to provide simulations of data structure.

  • PDF

Measurement during Construction of Nakdong Bridge by Incremental Launching Method (낙동강교 ILM 가설에 따른 시공 중 계측)

  • Kim, Hyung-Tae;Cho, Nam-So;Jung, Ji-Man;Yang, Sung-Man
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.575-580
    • /
    • 2007
  • As the volume of traffic in southern part of the republic of Korea grew, expansion of transportation was required. In that purpose, the railway between Samnangjin and Gwangyang is being extended to a double-track line. This construction includes Nakdong bridge located across Nakdong river. This truss bridge is constructed in incremental launching method (ILM) and composed of two sections, straight line and curved one. Bridge construction in the method goes with the shift of roller supports which results in the change of structural system. To accomplish safe construction, the measurement during the whole launching stages. The locations of member in severe condition and the corresponding response values were estimated through the preliminary construction stage analysis. Based on the analysis, the measurement during construction was planned. Several sensors and measurement devices were installed at appropriate locations. During the whole launching stages, the measurement was performed and the corresponding data were monitored and stored in real time. The comparison of the responses from the analysis and the measurement showed no indication of yielding of the structural members. Consequently, the construction of Nakdong bridge was concluded to be relevant.

  • PDF

Research on Effects and Possibility of Commercialization of Coptidis Rhizoma Mask Pack (한방 황련 마스크팩의 효능 검증 및 상품화 가능성 조사)

  • Lee, Kyou-Young;Hong, Chul-Hee
    • The Journal of Korean Medicine Ophthalmology and Otolaryngology and Dermatology
    • /
    • v.28 no.1
    • /
    • pp.100-108
    • /
    • 2015
  • Objectives : This study was planned to examine the enhancing effect of Coptidis Rhizoma mask pack on water, oil contents and skin texture, and to check the possibility of commercialization. Methods : We measured the change of water, oil contents and skin texture before and after the use of Coptidis Rhizoma mask pack. Measuring was conducted twice at an interval of ten days using accurate SK-03 skin analyzer. Measuring site was right and left SI18 and CV24 acupoints. Results : We can examine the improvement of water, oil contents and skin texture on every acupoints measured, except for CV24. On CV24, no difference was observed from water contents of both 1st, 2nd visit, and skin texture of 1st visit. Conclusions : We could confirm the boosting effect of Coptidis Rhizoma mask pack on water, oil contents and skin texture, especially around the SI18 acupoints. We should take follow-up measures to improve the absorption of a liquid herbal medicine around the CV24 acupoint, and heighten the potential for commercialization.

Feasibility and Acceptability of Workers' Health Surveillance for Fire Fighters

  • Plat, Marie-Christine J.;Frings-Dresen, Monique H.W.;Sluiter, Judith K.
    • Safety and Health at Work
    • /
    • v.2 no.3
    • /
    • pp.218-228
    • /
    • 2011
  • Objectives: The objective of this study was to test the feasibility and acceptability of a new workers' health surveillance (WHS) for fire fighters in a Dutch pilot-implementation project. Methods: In three fire departments, between November 2007 and February 2009, feasibility was tested with respect to i) worker intent to change health and behavior; ii) the quality of instructions for testing teams; iii) the planned procedure in the field; and iv) future WHS organisation. Acceptability involved i) satisfaction with WHS and ii) verification of the job-specificity of the content of two physical tests of WHS. Fire fighters were surveyed after completing WHS, three testing teams were interviewed, and the content of the two tests was studied by experts. Results: Feasibility: nearly all of the 275 fire fighters intended to improve their health when recommended by the occupational physician. The testing teams found the instructions to be clear, and they were mostly positive about the organisation of WHS. Acceptability: the fire fighters rated WHS at eight points (out of a maximum of ten). The experts also reached a consensus about the optimal job-specific content of the future functional physical tests. Conclusion: Overall, it is feasible and acceptable to implement WHS in a definitive form in the Dutch fire-fighting sector.

Generator's Maintenance Scheduling to Improve Supply Reliability (공급신뢰도 개선을 위한 발전기 보수계획)

  • 차준민
    • Journal of Energy Engineering
    • /
    • v.7 no.1
    • /
    • pp.89-95
    • /
    • 1998
  • Maintenance scheduling of generators plays an important role in evaluating supply reliability of power systems. Since generators must be maintained and inspected, the generation planner must schedule planned outages during the year. Several factors entering into this scheduling analysis include: seasonal load-demand profile, amount of maintenance, size of the units, elapsed time from last maintenance, and availability of maintenance crew. This paper proposes a new maintenance scheduling algorithm for the alternatives of long-term generation expansion planning by using LOLP levelization method which is known as an effective method for the generator's maintenance scheduling. To get the best supply reliability of power systems, we change the maintenance period to levelize the reliability over all period. The proposed algorithm is applied to a real size power system and the better reliability results are obtained.

  • PDF