Application & Examination of the Plan for Optimum Stability through Water-hammer in Pipe Line and Booster Pump Station

관로계통 및 가압펌프장 수격에 따른 최적 안정성 확보방안

  • Published : 2009.10.01

Abstract

This paper is performed to find out the stability of water-hammer in pipe line and pump station that is happened when additional water needs demanded. At first, the water supply construction project is planned to supply $6,000\;m^3/day$ through 17.9 km pipe line. But additional demand ($1,200\;m^3/day$) happened from Cheong-ra water reservoir. In this situation, air-chamber($4\;m^3$) and vacuum breaker valve(${\varphi}100\;mm$) are needed to prevent water-hammer. When the additional water is supplied, the existing facilities (air-chamber, vacuum breaker valve) are sufficient to alleviate shock not changing capacity alteration, judging from the airspace change and rise. Therefore, there is no problem for water-hammer by installing air-chamber($4\;m^3$) and vacuum breaker valve(${\varphi}100\;mm$) at the top of Yeo-ju hill.

Keywords

References

  1. I.J.Karassik, 1976, 'Pump Handbook,' McGraw Hill Book Co., pp. 9-26-9-50
  2. E. Benjamin Whlie/Victor L. Streeter/Lisheng Suo, 1993, 'Fluid Transients in System,' Englewood Cliffs(USA), pp. 143-144
  3. 김경엽, 김점배, 2004. '원심펌프의 시동 및 정지에 따른 수격현상,' (사) 유체기계공업학회, pp. 51-52 https://doi.org/10.5293/KFMA.2004.7.1.051
  4. M. Hanif.Chaudhry, 1979, 'Applied Hydraulic Transients,' Van Nostrand Reinhold Co, pp. 16-22
  5. 한국수자원공사, 1994. 12 '펌프장 신뢰성 향상방안 연구,' pp.20-24.
  6. 한국수자원공사. 2007. 5. '금강북부권 급수체계구축(1차)사업실시설계보고서,' pp. 9-393-9-403