• Title/Summary/Keyword: plan-sequence

Search Result 149, Processing Time 0.031 seconds

A Study on Spatial Scheduling in the P.E. Stage (선행 탑재장에서의 공간일정계획에 관안 연구)

  • Koo Chung-kon;Yoon Duck-Young;Bae Tae-Kyu;Cho Min-Ch
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.61-66
    • /
    • 2004
  • In this paper an effort is made to develop an innovative spatial arrangement concept pertaining to ship building industry. The spatial scheduling is the problem that concentrates on effective planning of available space and arrangements of blocks and in a priority manner. In order to create an effective spatial scheduling. a database providing the priority has to be available to make the erection sequence. Such a system works hand in hand with erection sequence generator program The erection sequence program works on the conventional network analysis method which uses a typical parent-children idea for the calculation of the ENT(possible earliest network start time) and LNT(possible latest network start time). This program works in a cyclic manner taking turns by calculating the ENT in upward trace and LNT on the return trace thereby generating the entire erection sequence diagram for the requisite problem The generated database serves as an input data for spatial scheduling problem. When the system works it takes into consideration the entire system based on heuristic concepts as mentioned. There system uses the spatial aspects such as the available area of the P. E area and plan area of the corresponding blocks and its priority of erection from the erection sequence generator program develops the spatial scheduling arrangement. In this paper using all these concepts an innovative spatial schedule development system developed.

  • PDF

The Power Analysis of Smart Work Industry and Increase Plan (스마트워크 산업 경쟁력 분석 및 육성방안)

  • Yu, Seung-Yeob;Noh, Kyoo-Sung
    • Journal of Digital Convergence
    • /
    • v.9 no.6
    • /
    • pp.187-196
    • /
    • 2011
  • This study found the power analysis and increase plan of Smart work industry out. We did the internet survey with 117 experts of Smart work and analyzed International competitive power and Smart work marketability. The results was as follows: First, Experts recognized the growth about Cloud computing industry so that they were most high. Second, The thing which the earning of Smart work industry is high appeared a Security industry, Cloud computing industry, and Mobile office industry etc sequence. Third, The Smart work industry which an international technique power level is high appeared in a Smart e-learning industry, Mobile office industry, and Security industry etc sequence. Lastly, An Smart work industry which the concentration supports in the government dimension Security industry, Cloud computing industry, Smart work user SW industry, and Smart e-learning industry etc sequence. This research products will use for there even though it prepares a concentration support industry in the government dimension an activation policy.

Optimization Model of Table Form dismantlement Sequence for Reducing Formwork Duration in Tall Building Construction (초고층 거푸집 공사 공기 단축을 위한 테이블폼 해체 순서 최적화 모델)

  • Nam, Chulu;Kwon, Jaebeom;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.196-197
    • /
    • 2015
  • In tall building construction, time for transporting form affects formwork duration as plan size has become larger and quantity of inputted form has been increased. Thus, necessity of systematic dismantlement sequence of form has been increased to reduce the duration of formwork. Tabu search has been efficiently applied to solve problem of combinatorial optimization by using tabu list which can improve combination values. Therefore, this study proposes optimization model of dismantlement sequence of table form which has been preferred in tall building construction, to reduce the formwork duration by minimizing time for transporting form.

  • PDF

A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members (PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구)

  • Jun, Young-Hun;Shin, Eun-Young;Yun, Won-Gun;Kim, Kyong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

Rule-Based Process Planning By Grouping Features

  • Lee, Hong-Hee
    • Journal of Mechanical Science and Technology
    • /
    • v.18 no.12
    • /
    • pp.2095-2103
    • /
    • 2004
  • A macro-level CAPP system is proposed to plan the complicated mechanical prismatic parts efficiently. The system creates the efficient machining sequence of the features in a part by analyzing the feature information. Because the planning with the individual features is very complicated, feature groups are formed for effective planning using the nested relations of the features of a part, and special feature groups are determined for sequencing. The process plan is generated based on the sequences of the feature groups and features. When multiple machines are required, efficient machine assignment is performed. A series of heuristic rules are developed to accomplish it.

Development of A CAPP System Based on Case-Based Reasoning (Case-Based Reasoning을 이용한 자동공정계획 시스템의 구축)

  • 이홍희;이덕만
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.46
    • /
    • pp.181-196
    • /
    • 1998
  • The aim of this research is the development of a CAPP system which can use the old experience of process planning to generate a process plan for a new part and learn from its own experience using the concept of stratified case-based reasoning(CBR). A process plan is determined through the hierarchical process planning procedure that is based on the hierarchical feature structure of a part. Each part and case have their own multiple abstractions that are determined by the feature structure of the part. Retrieving the case in stratified case-based process planning is accomplished by retrieving the abstraction that is most similar to the input part abstraction in each abstraction level of the case-base. A new process plan is made by the adaptation that translates the old case's process plan into the process plan of a new part. Operations, machines and tools, setups and operation sequence in each setup are determined in the adaptation of abstraction using some algorithms and the reasoning based on knowledge-base. By saving a new part and its process plan as a case, the system can use this new case in the future to generate a process plan of a similar part. That is, the system can learn its own experience of process planning. A new case is stored by adding the new abstractions that are required to save as the new abstraction to the existing abstractions in the case-base.

  • PDF

A Study on Developing the Guideline of Risk Management utilizing BCP technique for Airport Corporation (공항전문기업의 BCP기법을 활용한 위기대응 가이드라인 개발에 관한 연구)

  • Seo, Byung Seok;Shin, Do Hyoung
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.67-78
    • /
    • 2015
  • The purpose of the establishment of corporation's Business Continuity Plan(BCP) is to maintain corporations' own business and establish the response plan in order to resume operation in a short time period when crisis situations occur due to natural disaster and human error. This study has presented all types of procedures and criteria which are needed to establish the airport crisis response system in order to maintain the business continuity by utilizing BCP technique. Basically the risk response procedures must be established in the process of (1) preparation stage, (2) plan development stage, (3) documentation stage, (4) test & maintenance stage. The guideline has been suggested that each stage must be carried out in the sequence of Policy & Planning Responsibility, Business Impact Analysis, Recovery Strategy & Plans, Emergency Plan & SOP, Training Awareness and Maintenance & Review

Use of the estimated critical values adapting a regression equation for the approximate entropy test

  • Cha, Kyung-Joon;Ryu, Je-Seon
    • Journal of the Korean Data and Information Science Society
    • /
    • v.13 no.2
    • /
    • pp.77-85
    • /
    • 2002
  • The statistical testing methods have been widely recognized to determine the plain and cipher texts. In fact, the randomness for a sequence from an encryption algorithm is necessary to guarantee security and reliance of cipher algorithm. Thus, the statistical randomness tests are used to discover cipher text. In this paper, we would provide the critical value for an approximate entropy test by estimating the nonlinear regression equation when the number of sequence and the level of significance are given. Thus, we can discern plan and cipher text for real problem with given number of sequence and the level of significance. Also, we confirm the fitness of the estimated critical values from the rate of success for plain or cipher text.

  • PDF

A Fault Indicator Generation Algorithm using Phase Angle of Zero-Sequence Current in Ungrounded System (비접지 계통에서 영상전류 위상을 이용한 고장표시 생성 알고리즘)

  • Lim, Hee-Taek;Lim, Il-Hyung;Choi, Myeon-Song;Lee, Seung-Jae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.7
    • /
    • pp.1141-1149
    • /
    • 2008
  • Most faults are single-phase-to-ground fault in ungrounded system. The fault currents of single-phase-to-ground are much smaller than detection thresholds of measurement devices, so detecting single-phase-to-ground faults is difficult and important in ungrounded system. This paper proposed to a FI(Fault Indicator) generation algorithm in ungrounded system. The algorithm just using line-to-line voltage and zero-sequence current detects fault line, fault phase, fault section and FI(Fault Indicator) at terminal device, This paper also proposed to application plan for this algorithm. In the case study, the proposed algorithm has been testified in demo system by Matlab/Simulink simulations.

MODEL FOR DESIGN MANAGEMENT IN COLLABORATIVE ENVIRONMENT USING DESIGN STRUCTURE MATRIX AND DESIGN PARAMETERS' INFORMATION

  • Salman Akram;Jeonghwan Kim;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1307-1312
    • /
    • 2009
  • Design is an act based on multidisciplinary information. The involvement of various stakeholders makes it difficult to process, plan, and integrate. Iteration is frequent in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. The simple project management techniques are insufficient to fulfill the requirements of integrated design. This paper entails two things: design structure matrix and design parameters' information based model. The emphasis has been given to optimal sequence and crucial iteration using design structure matrix analysis technique. The design projects have been studied using survey data from industry. The optimal sequence and crucial iterations results have been utilized for proposed model. Model integrates two things: information about produced- required key design parameters and information of design changes during the design process. It will help to get familiar with Design management in order to fulfill contemporary needs.

  • PDF