In this paper an effort is made to develop an innovative spatial arrangement concept pertaining to ship building industry. The spatial scheduling is the problem that concentrates on effective planning of available space and arrangements of blocks and in a priority manner. In order to create an effective spatial scheduling. a database providing the priority has to be available to make the erection sequence. Such a system works hand in hand with erection sequence generator program The erection sequence program works on the conventional network analysis method which uses a typical parent-children idea for the calculation of the ENT(possible earliest network start time) and LNT(possible latest network start time). This program works in a cyclic manner taking turns by calculating the ENT in upward trace and LNT on the return trace thereby generating the entire erection sequence diagram for the requisite problem The generated database serves as an input data for spatial scheduling problem. When the system works it takes into consideration the entire system based on heuristic concepts as mentioned. There system uses the spatial aspects such as the available area of the P. E area and plan area of the corresponding blocks and its priority of erection from the erection sequence generator program develops the spatial scheduling arrangement. In this paper using all these concepts an innovative spatial schedule development system developed.
This study found the power analysis and increase plan of Smart work industry out. We did the internet survey with 117 experts of Smart work and analyzed International competitive power and Smart work marketability. The results was as follows: First, Experts recognized the growth about Cloud computing industry so that they were most high. Second, The thing which the earning of Smart work industry is high appeared a Security industry, Cloud computing industry, and Mobile office industry etc sequence. Third, The Smart work industry which an international technique power level is high appeared in a Smart e-learning industry, Mobile office industry, and Security industry etc sequence. Lastly, An Smart work industry which the concentration supports in the government dimension Security industry, Cloud computing industry, Smart work user SW industry, and Smart e-learning industry etc sequence. This research products will use for there even though it prepares a concentration support industry in the government dimension an activation policy.
Proceedings of the Korean Institute of Building Construction Conference
/
2015.11a
/
pp.196-197
/
2015
In tall building construction, time for transporting form affects formwork duration as plan size has become larger and quantity of inputted form has been increased. Thus, necessity of systematic dismantlement sequence of form has been increased to reduce the duration of formwork. Tabu search has been efficiently applied to solve problem of combinatorial optimization by using tabu list which can improve combination values. Therefore, this study proposes optimization model of dismantlement sequence of table form which has been preferred in tall building construction, to reduce the formwork duration by minimizing time for transporting form.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.253-254
/
2023
The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.
A macro-level CAPP system is proposed to plan the complicated mechanical prismatic parts efficiently. The system creates the efficient machining sequence of the features in a part by analyzing the feature information. Because the planning with the individual features is very complicated, feature groups are formed for effective planning using the nested relations of the features of a part, and special feature groups are determined for sequencing. The process plan is generated based on the sequences of the feature groups and features. When multiple machines are required, efficient machine assignment is performed. A series of heuristic rules are developed to accomplish it.
Journal of Korean Society of Industrial and Systems Engineering
/
v.21
no.46
/
pp.181-196
/
1998
The aim of this research is the development of a CAPP system which can use the old experience of process planning to generate a process plan for a new part and learn from its own experience using the concept of stratified case-based reasoning(CBR). A process plan is determined through the hierarchical process planning procedure that is based on the hierarchical feature structure of a part. Each part and case have their own multiple abstractions that are determined by the feature structure of the part. Retrieving the case in stratified case-based process planning is accomplished by retrieving the abstraction that is most similar to the input part abstraction in each abstraction level of the case-base. A new process plan is made by the adaptation that translates the old case's process plan into the process plan of a new part. Operations, machines and tools, setups and operation sequence in each setup are determined in the adaptation of abstraction using some algorithms and the reasoning based on knowledge-base. By saving a new part and its process plan as a case, the system can use this new case in the future to generate a process plan of a similar part. That is, the system can learn its own experience of process planning. A new case is stored by adding the new abstractions that are required to save as the new abstraction to the existing abstractions in the case-base.
The purpose of the establishment of corporation's Business Continuity Plan(BCP) is to maintain corporations' own business and establish the response plan in order to resume operation in a short time period when crisis situations occur due to natural disaster and human error. This study has presented all types of procedures and criteria which are needed to establish the airport crisis response system in order to maintain the business continuity by utilizing BCP technique. Basically the risk response procedures must be established in the process of (1) preparation stage, (2) plan development stage, (3) documentation stage, (4) test & maintenance stage. The guideline has been suggested that each stage must be carried out in the sequence of Policy & Planning Responsibility, Business Impact Analysis, Recovery Strategy & Plans, Emergency Plan & SOP, Training Awareness and Maintenance & Review
Journal of the Korean Data and Information Science Society
/
v.13
no.2
/
pp.77-85
/
2002
The statistical testing methods have been widely recognized to determine the plain and cipher texts. In fact, the randomness for a sequence from an encryption algorithm is necessary to guarantee security and reliance of cipher algorithm. Thus, the statistical randomness tests are used to discover cipher text. In this paper, we would provide the critical value for an approximate entropy test by estimating the nonlinear regression equation when the number of sequence and the level of significance are given. Thus, we can discern plan and cipher text for real problem with given number of sequence and the level of significance. Also, we confirm the fitness of the estimated critical values from the rate of success for plain or cipher text.
The Transactions of The Korean Institute of Electrical Engineers
/
v.57
no.7
/
pp.1141-1149
/
2008
Most faults are single-phase-to-ground fault in ungrounded system. The fault currents of single-phase-to-ground are much smaller than detection thresholds of measurement devices, so detecting single-phase-to-ground faults is difficult and important in ungrounded system. This paper proposed to a FI(Fault Indicator) generation algorithm in ungrounded system. The algorithm just using line-to-line voltage and zero-sequence current detects fault line, fault phase, fault section and FI(Fault Indicator) at terminal device, This paper also proposed to application plan for this algorithm. In the case study, the proposed algorithm has been testified in demo system by Matlab/Simulink simulations.
International conference on construction engineering and project management
/
2009.05a
/
pp.1307-1312
/
2009
Design is an act based on multidisciplinary information. The involvement of various stakeholders makes it difficult to process, plan, and integrate. Iteration is frequent in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. The simple project management techniques are insufficient to fulfill the requirements of integrated design. This paper entails two things: design structure matrix and design parameters' information based model. The emphasis has been given to optimal sequence and crucial iteration using design structure matrix analysis technique. The design projects have been studied using survey data from industry. The optimal sequence and crucial iterations results have been utilized for proposed model. Model integrates two things: information about produced- required key design parameters and information of design changes during the design process. It will help to get familiar with Design management in order to fulfill contemporary needs.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.