• Title/Summary/Keyword: plan for operation

Search Result 2,070, Processing Time 0.031 seconds

The Necessity and Awareness of Home Visiting Physical Therapy in Gwang ju·Junnam Area (광주·전남 지역의 가정방문 물리치료에 대한 인식도와 필요성에 관한 설문조사)

  • Lee, Dongjin;Lee, Youngsin;Jung, Suckmoon;Ko, Daesik
    • Journal of The Korean Society of Integrative Medicine
    • /
    • v.2 no.1
    • /
    • pp.77-89
    • /
    • 2014
  • Purpose : The objective of this study was to investigate the basis for effective introduction of home visiting physical therapy to provide basic information. Thus in our study, we investigated awareness, necessity and operation plan of home visiting physical therapy for patients and guardian. Method : We conducted a survey 172 and guardian. The questionnaire consisted of items for general characteristics, awareness, necessity and operation plan. Data was collected from 2013 november 1 to november 30. Based on the collected data of self-administered questionnaires, we analyzed for frequency of each questionnaire about awareness, necessity and operation plan of home visiting physical therapy. Result : The awareness for home visiting physical therapy. The necessity for home visiting physical therapy indicated a high result. The result for operation plan indicated a national program. Conclusion : Improving on people's awareness is needed, because the awareness about home visiting physical therapy was low but the need was high. In addition, government institutional arrangements will be needed for advanced medical services as soon as possible.

THE INTERFACE CONFIGURATION OF OVERSEA STATIONS AND OPERATION PLAN FOR KOMPSAT-2 LEOP

  • Baek Hyun-Chul;Kim Hae-Dong;Ahn Sang-Il;Kim Eun-Kyou
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.557-560
    • /
    • 2005
  • The Korea Multi-Purpose SATellite-2 (KOMPSAT -2) will be launched into a circular sun synchronous orbit in Dec. 2005. For the mission operation of the KOMPSAT-2 satellite, KARl Ground Station (KGS) consists of the Mission Control Elements (MCE), Image Reception & Processing Elements (IRPE) and the overseas stations. For the oversea stations, the Kongsberg Satellite Services (KSAT) is the prime supplier of support service. KSAT has the capability to provide Tracking Telemetry and Commanding (TT&C) nominal, contingency and anomaly support for every single orbit for most polar orbiting satellites. Also KSAT provides nodal service through the network management functionality for all oversea ground stations. This paper describes the oversea stations and the support for Launch and nominal TT&C services for KOMPSAT-2 and the operation plan for KOMPSAT-2.

  • PDF

Computing Fuel Consumption of Dozer Engine for Eco-Dozing (에코-도징을 위한 도저의 엔진부하별 연료소모율 연산기법 연구)

  • Park, Young-Jun;Lee, Hong-Chul;Li, Xianjun;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.62-63
    • /
    • 2016
  • Existing studies relative to enhancing sustainability of earth-work are mainly involved in the performance of construction equipments. They assume that there is no variation of the engine power and fuel consumption and classify the dozer operation into working and idle conditions. They enable to find the most eco-friendly equipment fleet deployment plan. However, they are confined in that they do not provide a measure to assess the sustainability of the operation plan and suggest optimal alternative(s). This paper presents a method that identifies an optimal dozer operation plan that assures sustainability by reducing fuel consumption of the equipment. The method computes the dozer operation productivity using engine-torque-output map provided by equipment manufacturers. Indeed, it identifies the eco-dozing operation that minimizes fuel consumption and maximizes the target productivity.

  • PDF

Effective event recorder operation method for multi-coupled trainset (중련편성 열차를 위한 효율적인 사건기록기 운영방안)

  • Choi, Kwon-Hee;Jeong, Byung-Ho;Min, Pyung-Oh;Oh, Yong-Suk;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1428-1432
    • /
    • 2007
  • One of the most important targets of transportation is to transport human and commodities to the destination safely. Railway has low risk, compared with land, ocean and flight route and it assures high security as well as high speed driving, since it runs on regular track. However, train accident may result in tragic accident due to small carelessness, so special event recorder is preferably used in order for clarity of responsibility in case of accident, maintenance of signal device and defect analysis. JRU(Juridical Recorder Unit) for ATC/ATS/ATP can be more advanced event recorder. Event recorder of KTX-I which is running now is installed one by one on each leading car and last car, and operation plan of event recorder in case of single trainset is suggested. But regarding train operation of multi-coupled trainset operation such as KTX-II, more detailed study is required for event recorder revitalization and record data process method. Therefore, this research aims at operation plan used in existing event recorder, and suggests effective operation and management plan of event recorder in multi-coupled trainset such as new High Speed Train.

  • PDF

Virtual Analysis of District Heating System Using ENetPLAN (EnetPLAN을 이용한 지역난방시스템 가상 운전 분석)

  • Ahn, Jeongjin;Lee, Minkyung;Kim, Laehyun
    • Journal of Energy Engineering
    • /
    • v.28 no.3
    • /
    • pp.18-25
    • /
    • 2019
  • In this study, in order to solve the problem of the program of calculating code input by experienced users in the power generation, the wide area energy network research group developed the local heating operation analysis program EntPLAN, which can be easily used by anyone, including scalability, with domestic technology. Therefore, the Commission intended to compare the heat sources, heat demand, and the results of operation of the combined heat plant (CHP) on the energy network through simulation with the EnetPLAN and the program A on the market. The results showed that the heat and power output on the energy network of the EnetPLAN and A programs were mostly similar in pattern in the simulation results of the heat supply and the operation method of the accumulator. This enabled the application of the simulation for the various operation modes of the cogeneration facilities existing on the energy network. It is expected that EntPLAN, which was developed with domestic technology, will be easily applied in the field in the future and will present efficient operation simulation results.

조선 도장 공장 운영 방안 수립에 관한 연구

  • 최동희;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.286-289
    • /
    • 2001
  • This paper deals with the procedures of effective mid-term Operation Planning establishment for painting shop in shipbuilding. and develop prototype system. In general, the block painting process consists of two stages such as blasting operation for surface preparation and painting operation for paint application for blocks. Weather condition is a potent Influence on those operations. The procedures consists of four steps, Load analysis, Generate alternative simulation plan. Implementation of Allocation automation module and Compare result of each simulation plan. Explain of each step. as follows, 1.step, Load analysis measure amount of assigned workload and manhour. 2.step, simulation scheme include alterable control variable such as overtime, weather. Auto allocating module carry out feasibility of simulation plan. 3.step, Allocation automation module are composed of three algorithms, as followings: - the block allocation algorithm that determines the number of blocks to be processed each day, - the team allocation algorithm that allocates blocks to worker groups. - the block arrangement algorithm that arrange blocks in blasting and painting cells. Since the block arrangement algorithm is conducted simultaneously with the team allocation algorithm, the total structure of the operating algorithms is considered to have two phases: first, daily load balancing with capacity limit and second, team allocation considering arrangement each day 4 step, Comparing result of each simulation plan. and select best simulation plan.

  • PDF

A Process Planning System for Machining of Dies for Auto-Body Production(II)-Operation Planning and NC Code Post-Processing (자동차 차체금형 가공용 공정계획 시스템(II)-작업 계획과 NC 코드 후처리)

  • Sin, Dong-Mok;Lee, Chang-Ho;Choi, Jae-Jin;Noh, Sang-Do;Lee, Ki-Woo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.1
    • /
    • pp.63-73
    • /
    • 2001
  • This paper presents a process and operation planning system with an NC code post-processor for effective machining of press dies for production of cars. Based on the machining features, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor we developed adjusts feedrates along the tool path to reduce machining time. The adjustment rule is selected based on the metal removal rate estimated by virtually machining with virtual cutting tool.

  • PDF

Requirements for Operation Procedure and Plan for the Korean Aviation Safety Big-Data Platform based on the Case of FAA ASIAS (국내 항공안전 빅데이터 플랫폼 운영관리체계 수립 중점 - FAA ASIAS를 중심으로 -)

  • Kim, Jun Hwan;Lim, Jae Jin;Park, Yu Rim;Lee, Jang Ryong
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.29 no.4
    • /
    • pp.105-116
    • /
    • 2021
  • The importance of a systematic approach to collect, process, analyze, and share safety data in aviation safety management is continuously increasing. Accordingly, the domestic aviation industry has been making efforts to build a Big-data platform that can utilize multi-field safety data generated and managed by various stakeholders and to develop safety management technology based on them. Big data platforms not only must meet appropriate technical requirements, but also need to establish a management system for effective operation. The purpose of this study is to suggest the requirements of the aviation safety big data platform operation procedure and plan by reviewing the advanced overseas cases (FAA ASIAS). This study can provide overall framework and managerial direction for the operation of the aviation safety big data platform.

A Study on TPS based on ATO for Driverless LRT (ATO 자동운전 기반의 무인운전 경전철 TPS에 관한 연구)

  • Lee, Chang-Hyung;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1132-1137
    • /
    • 2008
  • Automatic Operation based on ATO (Automatic Train Operation) is necessary for driverless Light Rail Transit business. When this kind of driverless LRT operation plan is made, TPS (Train Performance Simulation) is traditionally simulated at all-out mode and coasting mode based on manual operation. Commercial schedule speed equals to all-out speed minus $9{\sim}15%$ make-up margin. Coasting mode TPS simulation is also run at commercial schedule speed to calculate run time and energy consumption. But TPS based on manual operation should make an improvement on accuracy in case of driverless LRT operation Plan. In this paper, new fast mode TPS simulation using ATO pattern is proposed and show near actual ATO result. The actual ATO pattern can be accurately simulated with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. Normal mode TPS simulation for commercial schedule speed can be designed to have fast mode trip time plus 3 seconds/km margin recommended by korean standard LRT specification.

  • PDF

A Study On Wartime Sealift Operation Using Simulation

  • Lee, Sangjin;Yunchul Cho
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2001.10a
    • /
    • pp.468-476
    • /
    • 2001
  • The ROK TRANSCOM is trying to establish a concrete wartime sealift operation plan. But there are many problems to be solved for setting up the plan. The most serious problem is to procure war materiel to be shipped in U.S.A and next one is to determine the number of sealift assets and to allocate them. The process of sealift operation can be described as follows. Before the order of vessel mobilization, all vessels appointed for activation would be scattered in worldwide in the state of Beaded or unloaded. After the order of vessel mobilization, vessels would go to SPGE(seaport of embarkation) to load war materiel. Some loaded ships should offload the commercial cargo to the near port as soon as they are activated, before they would go to SPOE. All vessels would load procured materiel in SPOE and then go to SPOD(seaport of debarkation). They would offload war materiel in SPOD and then go back to SPOE to load war materiel again. We will simulate this process using ARENA(1), evaluate the sealift capability of ROK and find omit problems of the sealift plan. This model ultimately evaluates the sealift capability and provides planners with critical information far establishing and correcting the plan. This study can also provide military planners with a flexible and accessible decision support tool to provide advance planning under a variety of conditions on the sealift capability. The military planner is expected to make use of this model as a standard for establishing effective and concrete sealift operation in the near future. We can conclude how procurement capability significantly affects the result of sealift operation through this model. We could decide the appropriate levee of sealift asset such as the number of vessels and the number of available berth. So we could allocate effectively the resources for completing the sealift operation within the TGT(Target) time.

  • PDF