• Title/Summary/Keyword: pilot plant

Search Result 715, Processing Time 0.029 seconds

Optimal Operational Characteristics of Wastewater Treatment Using Hydrocyclone in a Sequencing Batch Reactor Process (연속회분식반응기 공정의 하이드로사이클론 도입 하수처리 최적 운전특성)

  • Kwon, Gyutae;Kim, Hyun-Gu;Ahn, Dae-Hee
    • Journal of Environmental Science International
    • /
    • v.31 no.4
    • /
    • pp.295-309
    • /
    • 2022
  • The purpose of this study was to evaluate the operational characteristics of wastewater treatment using Sequencing Batch Reactor (SBR) with Aerobic Granular Sludge (AGS) separator in the pilot plant. Pilot plant experiments were conducted using SBR with AGS separator and pollution removal efficiencies were evaluated based on the operational condition and surface properties of AGS. The results of the operation on water quality of the effluent showed that the average concentration of total organic carbon, suspended solids, nitrogen, and phosphorus was 6.89 mg/L, 7.33 mg/L, 7.33 mg/L, and 0.2 mg/L, respectively. All these concentrations complied the effluent standard in Korea. The concentration of mixed liquor suspended solid (MLSS) fluctuated, but the AGS/MLSS ratio was constant at 86.5±1.3%. Although the AGS/MLSS ratio was constant, sludge volume index improved. These results suggested that the particle discharged fine sludge and increased the AGS praticle size in the AGS. Optical microscopy revealed the presence of dense AGS at the end of the operation, and particles of > 0.6 mm were found. Compared to those of belt-type AGS separator, the required area and power consumption of the hydrocyclone-type AGS separator were reduced by 27.5% and 83.8%, respectively.

A Study on Operating Condition of Test-Bed Plant using Membrane filtration of D Water Treatment Plant in Gwang-Ju (D정수장 정밀여과막 실증플랜트의 최적 운전조건 연구)

  • Yang, Hyung-Jae;Yi, Seung-Hoon;Moon, Kyung-Ran
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.3
    • /
    • pp.155-163
    • /
    • 2017
  • Membrane filtration has become more popular in drinking water treatment recently, since the filtration can control not only particulate matters but also pathogenic microorganisms such as giardia and cryptosporidium very effectively. Pilot-scale ($120m^3/d$ of treatment capacity) and test-bed ($25,000m^3/d$ of treatment capacity) microfiltration experiments were conducted to find optimum operating mode and the critical flux. Optimum operating mode of pilot-test was assessed as inflow 1.0 min, filtration 36.5 min, air backwash 0.9 min, backwash 1.0 min and outflow 1.0 min with 50 LMH ($L/min{\cdot}m3^$) of critical flux. Critical Flux was calculated to be $50L/m^2-h$ (within TMP 0.5 bar) based on the increase formula of the transmembrane pressure difference according to the change of time at Flux 20, 40, 56 and 62 LMH in pilot operation. Chemical cleaning was first acid washed twice, and alkali washing was performed secondarily, and a recovery rate of 95% was obtained in the test-bed plant. The results of operating under these appropriate conditions are as follows. Turbidity of treated water were 0.028, 0.024, 0.026 and 0.028 NTU in spring, summer, autumn and winter time, respectively. Microfiltration has superior treatment capability and performance characteristics in removing suspended solids and colloidal materials, which are the main cause of turbidity and important carrier of metal elements, and it has shown great potential in being an economically substitute to traditional processes (sand filtration).

Development of Uldolmok Tidal Current Energy (울돌목 조류에너지 개발 현황과 전망)

  • Lee Kwang-Soo;Yum Ki-Dai;Park Jin Soon;Kang Sok Kuh;Park Woo-Sun;Han Sang-Hun;Jung Gong-Il;Park Jung Woo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.512-515
    • /
    • 2005
  • The Korean peninsula has a number of coastal sites where the rhythmic rising and lowering of water surface due to tides result in strong tidal current. The kinetic energy of these currents can be efficiently exploited by using tidal current turbines. The pilot tidal current power plant is to be constructed at the Uldolmok between Chindo and Haenam. Extensive coastal engineer ing research works have been carried out. This paper describes some observation results of field campaign, design of the supporting structure of a pilot plant of 1,000kW and a future tidal current power plant and so on.

  • PDF

CO2 dry-ice cleaning for the removal of air preheater plugging in coal-fired power plant. (석탄 화력발전소의 공기예열기 막힘 제거를 위한 CO2 드라이아이스 세정)

  • Ju, Saerom;Kim, Gyeong-Min;Kim, Do-Jung;Kim, Dong-Won
    • Proceedings of the Korean Institute of Surface Engineering Conference
    • /
    • 2014.11a
    • /
    • pp.204-206
    • /
    • 2014
  • 석탄 화력발전소에는 연소가스의 질소산화물(NOx) 저감을 위한 SCR(selective catalytic reduction)설비가 운전되고 있으며, SCR은 환원제인 암모니아($NH_3$)를 이용하여 연소가스 내에 질소산화물을 물과 질소로 분해하는 역할을 한다. 그러나, 연소가스 중의 일부 삼산화황($SO_3$)과 미반응 암모니아가 결합하여 황산암모늄염(Ammonium bisulfate; $NH_4HSO_4$)을 생성하며, 이는 후단 APH(air preheater)의 열소자에 점착된 후 분진들과 함께 성장하여 막힘을 야기한다. 막힘이 발생된 APH는 연소가스의 흐름을 방해하기 때문에 차압을 증가시키며, 이는 발전효율의 감소뿐만 아니라 급전정지를 초래한다. 이를 해결하기 위하여 $CO_2$ 드라이아이스 세정 방법을 적용하였으며, pilot-scale plant에서 실험을 수행하였다. 또한, 드라이아이스 공정변수인 분사압력과 분사시간을 제어하여 pilot-scale plant의 APH 열소자 표면에 생성되어있는 오염물질들의 제거효율을 관찰한 결과 95 %의 높은 제거효율을 보였다.

  • PDF

Experimental Study on CO2 Reaction Mechanism in Oxy Gasification Reaction Field (순산소 가스화 반응장에서 CO2 전환 메커니즘 연구)

  • Roh, Seon Ah;Yun, Jin Han;Keel, Sang In;Lee, Jung Kyu;Min, Tai Jin
    • Transactions of the KSME C: Technology and Education
    • /
    • v.3 no.4
    • /
    • pp.285-290
    • /
    • 2015
  • Oxy gasification was performed for the production of high quality syngas from the waste. $CO_2$ was used as reactant with $O_2$ for $CO_2$ gasification and greenhouse gas reduction. Therefore, gasification was performed at high temperature of $1000-1400^{\circ}C$. RPF was gasified in the thermobalance and 0.5 ton/day pilot plant gasifier. Weight variation with temperature and CO production by Boudouard reaction were studied for $CO_2$ gasification of RPF in thermobalance reactor. Syngas of high $H_2$ concentration was produced from oxy gasification in 0.5 ton/day pilot system, which showed appropriate $H_2$/CO ratio for the production of transport fuel and chemical products.

Phosphorus Removal in Pilot Plant Using Biofilm Filter Process from Farm Wastewater

  • Shin, Sung-Euy;Choi, Du-Bok;Lee, Choon-Boem;Cha, Wol-Suk
    • Biotechnology and Bioprocess Engineering:BBE
    • /
    • v.11 no.4
    • /
    • pp.325-331
    • /
    • 2006
  • Various environmental conditions affecting total phosphorus removal from farm wastewater in a biofilm filter process were investigated using loess balls and Chromobacterium LEE-38 at a pilot plant. When Chromobacterium LEE-38 was used, the removal efficiency of total phosphorous was approximately 10- or 5-fold higher than that of Acinetobacter CHA-2-14 or Acinetobacter CHA-4-5, respectively. When a loess ball of $11{\sim}14mm$ manufactured at a $960^{\circ}C$ calcining temperature was used, the removal efficiency of total phosphorous was 90.0%. When 70% of the volume fraction was used, the maximum efficiency of total phosphorus removal was 93.1%. Notably, when the initial pH was in the range of 6.0 to 8.0, the maximum removal efficiency of total phosphorus was obtained after 30 days. When the operating temperature was in the range of 30 to $55^{\circ}C$, the maximum removal efficiencies of total phosphorus, 95.6 to 94.6%, were obtained. On the other hand, at operating temperatures below $20^{\circ}C$ or above $40^{\circ}C$, the removal efficiency of total phosphorous decreased. Among the various processes, biofilm filter process A gave the highest removal efficiency of 96.4%. Pilot tests of total phosphorus removal using farm wastewater from the biofilm filter process A were carried out for 60 days under optimal conditions. When Acinetobacter sp. Lee-11 was used, the average removal efficiency in the p-adsorption area was only 32.5%, and the removal efficiencies of chemical oxygen demand (COD) and biological oxygen demand (BOD) were 56.7 and 62.5%, respectively. On the other hand, when Chromobacterium LEE-38 was used, the average removal efficiency was 95.1%, and the removal efficiencies of COD and BOD were 91.3 and 93.2%, respectively.

Research of water treatment system to reduce pollution by rainfall runoff (강우유출수 오염저감을 위한 수처리장치 개발)

  • Park, Jae-Young;Ko, Jai-Ung;;Chang, Jun-Young;Oh, Jong-Min
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1224-1228
    • /
    • 2005
  • 본 연구는 강우시 주로 발생되는 강우유출수에 의해 하천으로 직유입 되는 다량의 오염물질을 사전에 저감시키기 위하여 하천의 제방사면부와 둔치부를 형상화한 Pilot 규모의 수처리시스템에 관한 것이다. 본 Pilot Plant는 경희대학교 내 하수처리장 부근에 설치하였으며, 유입부, 사면수처리부, 평면수처리부, 유출부로 구성되며, 수처리조 내부에 다공성여재와 상부에는 식생을 조성하여 연속적으로 운영되는 시스템으로 설계되었다. 사면수처리부는 하천의 제방사면부를 형상화 한 것으로 2:1의 구배를 가지며, 15개의 육각형 모듈을 5개씩 3계열로 배치하여 여재의 처리효율 및 현장 적용성 검토를 실시할 수 있도록 배열하였다. 평면수처리부는 장방형의 접촉산화조로서 하부에 슬러지 침전 및 저류를 위한 hopper를 설치하여 슬러지의 원활한 수집 및 인발이 가능하도록 설계하였다. 또한, 역세를 위한 배관을 설치하여 여재에 부착된 슬러지의 양 조절이 가능하도록 하였다. 또한, 수처리시설물의 자연 친화성 확보 및 식생에 의한 수질개선 효과를 위해 수처리부 상부에 식생을 조성하였다. 본 Pilot Plant의 주요 오염물질의 제거기작은 수처리부 내부에 충진된 다공성 여재와 강우유출수 사이에 발생되는 침전, 여과, 흡착과 여재에 부착된 미생물에 의한 유기물 분해, 식생에 의한 영양물질 섭취 등으로 대별된다. 본 연구는 하천의 제방사면부와 둔치부를 형성화한 Pilot Plant에서 다양한 factor, 즉 유입수량과 농도, 다공성여재 형상 및 충진밀도 등에 따른 수질개선 효과를 각각 비교, 검토하였다.

  • PDF

Model Development of Spray Dryer Absorber FGD Process (Spray Dryer Absorber 배연탈황공정의 모델 개발)

  • Jang, Sun-Hee;Oh, Eui-Kyung;Lee, Hyung-Keun;Kim, Sun-Geon
    • Clean Technology
    • /
    • v.2 no.1
    • /
    • pp.80-95
    • /
    • 1996
  • A mathematical model has been developed for simulating the spray dryer absorber (SDA) used in semi-dry flue gas desulfurization process. Fundamental equations include the component mass and heat balances in both gas and droplet phases and the equation of motion for a single droplet. The model developed described the pilot-plant data much better than the existing SPRAYMOD-M model. The effect of the process variables, whose values were chosen within the operation limits of the actual pilot plants, on % $SO_2$ removal or conversion of the sorbent were calculated, and discussed in terms of $SO_2$ absorption rate, the residence time of flue gas, the velocity and drying time of droplets. Finally, the % $SO_2$ removal was calculated with two independent process variables and the results were shown on three-dimensional or two-dimensional diagrams with the lines of constant % $SO_2$ removal, so that they can be easily applied to preliminary design of the SDA.

  • PDF

Process Development of Pyrolysis Liquefaction for Waste Plastics (폐플라스틱의 열분해 유화기술 개발)

  • Nho, Nam-Sun;Shin, Dae-Hyun;Park, Sou-Won;Lee, Kyong-Hwan;Kim, Kwang-Ho;Jeon, Sang-Goo;Cho, Bong-Gyu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.523-526
    • /
    • 2006
  • The target of this work was the process development of demonstration plant to produce the high quailty alternative fuel oil by the pyrolysis of mixed plastic waste. In the first step of research, the bench-scale units of 70t/y and the pi lot plant of 360 t/v had been developed. Main research contents in this step were the process performance test of pilot plant ot 360ton/year and the development of demonstration plant of 3 000 t/y which was constructed at Korea R & D Company in Kimjae City. The process performance of pilot plant of 360 t/v showed components in PONA group appeared at between that of commercial gasoline and kerosene. On the other hand, HO product was mainly paraffin and olefin components and also appeared at upper temperature distribution range than commercial diesel. Gas product showed a high fraction of $C_3\;and\;C_4$ product like LPG composition, but also a high fraction of $CO_2$ and CO by probably a little leak of process.

  • PDF

Pilot Application of Fire Barrier Penetration Seal Evaluation in Nuclear Power Plant (원자력발전소 방화벽 관통부 성능평가 시범 적용)

  • Park, Jun-Hyun
    • Fire Science and Engineering
    • /
    • v.20 no.4 s.64
    • /
    • pp.98-104
    • /
    • 2006
  • The Fire Protection Regulatory documents require the fire-resistive rating of fire barrier penetration seals be same as that of fire barriers. Pilot application of penetration seal evaluation for K nuclear plant, built before penetration seal requirements were made, was done. In this evaluation, visual inspection and estimating fire rating by comparing installed configuration with tested configuration of penetration seals, called bounding approach method, were applied. Further improvements for retrofit and maintenance are recommended with penetration seal evaluation results also. The practical use of the methodology adopted in this study and the evaluation result of K nuclear plant will be anticipated for other plant's penetration seal evaluation.