Pilot Application of Fire Barrier Penetration Seal Evaluation in Nuclear Power Plant

원자력발전소 방화벽 관통부 성능평가 시범 적용

  • 박준현 (전력연구원(한국전력공사))
  • Published : 2006.12.31

Abstract

The Fire Protection Regulatory documents require the fire-resistive rating of fire barrier penetration seals be same as that of fire barriers. Pilot application of penetration seal evaluation for K nuclear plant, built before penetration seal requirements were made, was done. In this evaluation, visual inspection and estimating fire rating by comparing installed configuration with tested configuration of penetration seals, called bounding approach method, were applied. Further improvements for retrofit and maintenance are recommended with penetration seal evaluation results also. The practical use of the methodology adopted in this study and the evaluation result of K nuclear plant will be anticipated for other plant's penetration seal evaluation.

원자력발전소 화재방호 규정에서 방화벽 관통부는 방화벽과 동등한 내화성능을 갖는 구조로 시공할 것을 요구하고 있다. 화재방호 규정이 제정되기 이전에 설계되어 방화벽 관통부 내화성능 인증되지 않은 'K' 원자력발전소에 대해서 내화성능을 평가하였다. 내화성능 평가는 육안점검에 의한 방법과 시공된 관통부 데이터와 시험체 데이터를 비교하여 판단하는 한계접근법을 적용하였다. 내화성능 평가 결과, 전체 관통부의 50%에 해당하는 관통부가 성능기준에 미달하는 것으로 나타났다. 본 연구에서는 성능평가 결과와 더불어 관통부 내화성능을 확보하기 위한 설비 개선, 유지관리 방안 등을 제시하였다. 본 연구는 가동중인 발전소를 대상으로 한 실증평가로서 본 연구에서 적용한 평가방법, 연구결과 등은 향후 타원전의 관통부 성능평가에 유용하게 활용될 것으로 기대된다.

Keywords

References

  1. USNRC, 'Fire Protection for Operating Nuclear Power Plants', Regulatory Guide 1.189(2001)
  2. USNRC, 'Fire Barrier Penetration Seals in Nuclear Power Plants', NUREG-1552(1996)
  3. EPRI, 'Fire Barrier Penetration Seal Handbook', TR-1000196(2000)
  4. 박준현, 김원국, '원자력발전소 방화벽 관통부 성능평가', 한국화재소방학회추계학술대회논문집, pp.415-421(2003)
  5. 전력연구원, '방화벽 관통부 내화충전구조 성능평가 (2차년도)', TM.02NE16.P2004.361(2004)
  6. 조홍석, 박준현, 손봉세, 임정순, '원자력발전소 관통부 충전구조의 내화성능평가에 관한 연구', 한국화재소방학회논문지, Vol. 18, No. 4, pp.93-102(2004)
  7. 한수원(주), '고리1호기 방화벽 관통부 성능평가 최종보고서'(2006)
  8. 한수원(주), '월성1호기 방화벽 관통부 성능평가 최종보고서'(2006)