• Title/Summary/Keyword: pile foundation construction

Search Result 247, Processing Time 0.024 seconds

Field Applicability Evaluation of Foundation Combine with Footing and Pile by Model Test (모형실험을 통한 복합기초의 현장 적용성 평가)

  • Kim, Hak-Moon;Jang, Kyung-Jun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.8
    • /
    • pp.3729-3744
    • /
    • 2011
  • As the size of structures become larger by civil and architectural structures becoming large, deeply underground, and high-rise, the conditions of underground foundation vary according to the location that the lack of bearing capacity locally because of ununiform of foundation in some parts is frequent. Generally, when the foundation is not homogeneous, the acquisition of safety through applying the most conservative foundation method possible becomes the focus to secure the stability of the superstructures. It is considered as because of inability to verify the application and stability and application of construction of different foundations through an outlined review because of lack of study in case of different foundation of mixed use of direct foundation and pile foundation. Therefore, through measurement interpretation of the different foundation in which the direct foundation and pile foundation are mixed in use, the grounds in which the hypothetical bearing capacity changes dramatically was modeled to evaluate the applicability of different foundations. Also, based on the results of measurement interpretation, various foundations are created by using plaster, Joomunjin standard soil, and rubble to conduct an indoor model test to compare and analyze the movement of pile foundation and different foundations. Based on such research results, the stability and applicability of the different foundations which is more efficient and economical than the existing foundations in case of grounds in which the bearing capacity changes dramatically by comparing and analyzing the different foundations (direct foundation + pile foundation) with the conservative pile foundation and mat foundation. As a result, when the different foundation is applied, the overall settlement amount increased than the conservative pile foundation. However, the difference was very minute and it has been confirmed to be no issue as a result of assessment of stability of the differential settlement of structures through critical angle displacement.

Deep Foundations for High-Rise Buildings in Hong Kong

  • Sze, James W.C.
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.4
    • /
    • pp.261-270
    • /
    • 2015
  • Hong Kong is a renowned small city with densely placed skyscrapers. It is no surprise that heavy duty or even mega foundations are built over the years to support these structures. To cope with the fast construction pace, several heavy deep foundation types have been widely adopted with some prescribed design rules. This Paper has selected two commonly adopted but distinctive foundation types, namely large diameter bored piles and percussive steel H-piles to illustrate the special design and construction considerations related to these pile types in related to local context. The supervision requirement in related to foundation works for which again may be unique in Hong Kong will also be highlighted. A case history is also discussed in the later part of the Paper to illustrate the application of one of these foundations and to highlight the importance of considering foundation design and basement excavation method in a holistic manner.

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

A Case Study on the Design of High Capacity Foundations for High-Rise Buildings (국외 초고층 건축물의 대형기초 적용 사례)

  • Cho, Sung-Han;Han, Byoung-Kwon;Lee, Je-Man;Kim, Tae-Bum
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2007.09a
    • /
    • pp.78-89
    • /
    • 2007
  • Two design examples of deep foundations for high-rise buildings on soft ground are introduced in this paper. The first one is a 54-story building in Ho-Chi-Minh city, Vietnam, which was designed to be founded on $2.8m{\times}1.0m$ barrette foundations with approximately 60m to 75m depth. Based on a number of design guides and existing load test data from the construction sites in Ho-Chi-Minh city, the capacity of a barrette foundation in sand or clay layered ground was calculated to be 17.2MN to 27.8MN depending on the installing depth. The second one is a 40-story building in Baku city, Azerbaijan, which was designed to be supported by 2.0m diameter bored pile foundations with approximately 23m depth. As analytical or empirical guides for the local ground conditions were very limited, the design procedure from the SNiP Code, one of Russian specifications, was adopted and used to calculate the pile capacity. The capacity of bored pile foundation in highly weathered soil was expected to be 14.8MN to 15.5MN depending on the boring depth.

  • PDF

Applicability Evaluation of PHC Pile to Replace Myanmar Local Use Piles (PHC 말뚝의 미얀마 현지 사용말뚝 대체 적용 가능성 평가)

  • Ko, Hyo Jin;Kim, Hyun Woo;Park, Yong Kyu;Yoon, Ki Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.198-199
    • /
    • 2017
  • In this paper, the applicability of PHC piles to replace Myanmar local piles were evaluated. In Myanmar, based on the size of the building, foundation design and field applications are carried out using bored pile and square pile. As a result of the analysis, the application of PHC pile is more economical than conventional bored pile or square pile which was applied in the high rise (17-story) and middle story (12-story) buildings. However, in the low - rise (8-story) building, the application of the existing square piles was found to be more economical than PHC pile.

  • PDF

An Evaluation on the Seismic Stability of a Railway Bridge Pile Foundation Considering Soil-Structure Interaction (지반-구조물 상호작용을 고려한 철도 교량하부 말뚝 기초의 내진 안정성 평가)

  • 이기호;신민호
    • Journal of the Korean Society for Railway
    • /
    • v.6 no.1
    • /
    • pp.29-40
    • /
    • 2003
  • In this study, the three dimensional pile-soil dynamic interaction analysis of the railway bridge pile foundation was performed using SASSI 2000 program and the applicability of SASSI 2000 about an evaluation of the seismic stability of a pile foundation was examined. The numerical analysis was executed on the two site of actual construction and input properties such as the acceleration of bedrock were estimated by one dimensional seismic response analysis using the Pro-SHAKE. Consequently, all the piles of the subject of investigation showed that displacement occurred within a permitted limit and the shear force and moment largely occurred at the point where the soil stiffness varied rapidly.

Analysis of Dynamic Behavior on Group Piles in Two-Layered Sandy Ground (이층지반에 설치된 무리말뚝의 동적 거동 분석)

  • Heungtae Kim;Hongsig Kang;Kusik Jeong;Kwangkuk Ahn
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.10
    • /
    • pp.51-58
    • /
    • 2023
  • The dynamic behavior of the group piles supporting the superstructure in an earthquake is influenced by different complex dynamic mechanisms by the inertia force of the superstructure and the kinematic force of the ground. In an earthquake, The dynamic p-y curve is used to analyze the dynamic behavior of the pile foundation in consideration of the interaction of the ground, pile foundation, and superstructure due to the inertia force and the kinematic force. Most of the research has been conducted in order to confirm the dynamic p-y curve of the pile foundation by applying to the pile foundation installed on the single layered ground consisting of sand and clay, but the research for the multiple layered ground is insufficient. In this study, 1g shaking table tests were conducted to analyze the effect of the strata ratio of the top and bottom ground of the two layered sandy ground which has different relative densities on the dynamic behavior of group piles supporting the superstructure. The result shows that the maximum acceleration in the ground, the pile cap, and the superstructure increases as the strata ratio increases, and the location of the maximum bending moment of the pile foundation is changed. In addition, it was confirmed that the slope of the dynamic p-y curve of the pile foundation increased and decreased according to the strata ratio.

Case Study for Construction Cost Saving by means of Economic Pile Design Procedure (말뚝기초의 경제적인 설계절차에 의한 건설비용 절감 사례 연구)

  • Choi, Yong-Kyu;Lim, Jong-Seok;Kwon, Oh-Kyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.4 no.4
    • /
    • pp.73-84
    • /
    • 2003
  • In this study, the economic pile design procedure using the proof test results was proposed. In order to improve the inappropriate pile design routine, the proof test for 6 pile cases were performed and the construction saving effect were analyzed. The saving rate of construction cost with the small diameter piles and the large diameter drilled shafts were 34 - 47 and 0 - 55 %, respectively.

  • PDF

A Study on the Behavior of a Noise & Vibration-Free Screw Pile Method by Means of numerical analysis (무소음.무진동 스크류말뚝공법의 수치해석에 의한 거동 연구)

  • Kim, Young-Pil;Jung, Ho-Young;Ha, Young-Min;Oh, Seung-Ryul;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.30-37
    • /
    • 2009
  • In doing the foundation work in the downtown, the popular complaints by means of Noise and vibration have been became heavy burden. Therefore, the noise & vibration-free screw PHC pile method will contribute to the foundation work by removal of the popular complaints and improvement of the constructability. In this paper, the load bearing capacity and displacement characteristics of the noise & vibration-free screw PHC pile were analyzed. The noise & vibration-free screw PHC pile's behavior was better well than the existing PHC pile's one.

  • PDF

CASE STUDIES ON THE CONSTRUCTION CONTROL OF FILE FOUNDATION BY PILE DRIVING ANALYZER (항타분석기에 의한 말뚝시공관리 사례)

  • 이우진;이인모
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1994.09a
    • /
    • pp.79-86
    • /
    • 1994
  • Two case studies on the application of Pile Driving Analyzer (PDA) are introduced. It is shown that the PDA and CAPWAP are effective tools for the construction control of pile foundations with minimum cost and time. The PDA and CAPWAP techniques are able to evaluate the performace of hammer and driving system: to check the stresses in the pile due to driving: to determine the damage of pile: to predict the ultimate bearing capacity of pile: to estimate the important soil paramaters such as the soil resistance, quake, and damping etc.: and to provide the load - displacement curve from the simulated static load test. Theoretical backgrounds of wave mechanics is briefly reviewed and the methodology of construction control using the PDA is also discussed.

  • PDF