• Title/Summary/Keyword: operational test

Search Result 1,003, Processing Time 0.03 seconds

KASS Performance Analysis for Operational Test (운용시험을 통한 KASS 성능 분석)

  • Heesung Kim;Minhyuk Son;ByungSeok Lee;Baeckjun Yi
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.13 no.2
    • /
    • pp.167-177
    • /
    • 2024
  • The Korea Augmentation Satellite System (KASS) has been certified by the Ministry of Land, Infrastructure and Transport (MOLIT) and commenced Safety-of-Life (SoL) service at the end of 2023. KASS complies with the APV-I signal-in-space performance requirements defined in the International Civil Aviation Organization (ICAO) Standards and Recommendation Practices (SARPs). The performance of KASS is verified through two steps. In the first step, design conformity from the aspect of performance is verified by both review and analysis of design and simulation. In the second step, operational conformity is tested and assessed by operational testing using real data and a deployed system with operational SWs and configurations. This paper presents a methodology, a procedure and results for the KASS operational testing. Finally, performance degradation events and results by month and region during the operational testing are presented and analyzed.

Development on Test Procedure of Pitch and Yaw Bearings for Wind Turbine (풍력발전기용 피치/요 베어링의 시험절차 개발)

  • Nam, Ju Seok;Han, Jeong Woo
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.24 no.3
    • /
    • pp.355-362
    • /
    • 2015
  • Test procedure for the design verification of wind turbine pitch and yaw bearings has been developed. Test items were selected to evaluate operational reliability of pitch and yaw bearings by considering loading and operational conditions, and by analyzing the design criteria of pitch and yaw bearings. The developed test items consisted of preliminary test, fatigue load test, extreme load test, low temperature environmental test and dismantling inspection after all the test were completed. Because it reflects the actual operational conditions of the pitch and yaw bearings, the developed test procedure has high reliability and can verify the basic design considerations in the international standard and guidelines.

Model-Based Design and Enhancement of Operational Procedure for Guided Missile Flight Test System (유도무기 비행시험 시스템을 위한 모델 기반 운용절차의 설계 및 개선)

  • Park, Woong;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.4
    • /
    • pp.479-488
    • /
    • 2019
  • The flight test operational procedure artifact includes mission planning, execution methods, and safety measures for each step of test progress. As the development of guided missiles has become more advanced and strategic, flight test has become increasingly complex and broadened. Therefore, increased reliability of the flight test operation procedures was required to ensure test safety. Particularly, the design of the flight test operational procedures required verification through M&S to predict and prepare for the uncertainty in a new test. The relevant studies have published the optimal framework development for flight tests and the model-based improvements of flight test processes, but they lacked the specificity to be applied directly to the flight test operational procedures. In addition, the flight test operational procedures, which consist of document bases, have caused problems such as limitations of analysis capabilities, insensitive expressions, and lack of scalability for the behavior and performance analysis of test resources. To improve these problems, this paper proposes how to design operational procedure of guided missile flight test system by applying MBSE(Model-based Systems Engineering). This research has improved reliability by increasing the ability to analyze the behavior and performance of test resources, and increased efficiency with the scalability applicable to multiple flight tests. That can be also used continuously for the guided missile flight tests that will be developed in the future.

A Study on the Relationship between Vertical Separation and Operational Efficiency of Railway Industry (철도산업의 수직분리와 운영효율성의 관련성에 관한 연구)

  • Kim, Seong-Ho;Choi, Tae-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.844-851
    • /
    • 2009
  • Since 1990s, the European railway sector has undergone both a vertical separation and a vertical integration. Recently Simar and Wilson (2008) provides a bootstrap test procedure for testing whether two groups' mean efficiencies are equivalent. The purpose of this paper is to ascertain the relationship between vertical separation and operational efficiency of railway industry using the Simar and Wilson's bootstrap test procedure not used in previous studies with a data set of 20 European countries from 1998 to 2005. From the value of test statistic it seems that the mean operational efficiencies of vertically separated railway industry were higher than those of vertically integrated railway industry. However the p-value indicates that the differences of mean operational efficiencies are not significat at any meaningful level.

Stroke Verification Test and Operational Characteristics Analysis of KSLV-I Kick Motor TVC Nozzle (나로호 킥모터 TVC 노즐 행정확인시험 및 특성 분석)

  • Sun, Byung-Chan;Park, Yong-Kyu;Oh, Choong-Suk;Roh, Woong-Rae
    • Aerospace Engineering and Technology
    • /
    • v.11 no.1
    • /
    • pp.158-168
    • /
    • 2012
  • This paper deals with TVC nozzle stroke verification test and corresponding analysis techniques related to kick motor TVC system of KSLV-I second stage. It is shown that the relationship between TVC stroke and potentiometer voltage is revealed via the open-loop stroke verification test, and other major operational parameters including nozzle alignment error, actuation error, neutral position, radius of nozzle rotation, location of nozzle rotation center, angle conversion coefficients, etc. are analyzed via the closed-loop stroke verification test. The TVC stroke verification test results for the first and second flight model of KSLV-I show that all TVC operational parameters of KSLV-I second stage were normally setup for the first and second flight tests.

Design of bivariate step-stress partially accelerated degradation test plan using copula and gamma process

  • Srivastava, P.W.;Manisha, Manisha;Agarwal, M.L.
    • International Journal of Reliability and Applications
    • /
    • v.17 no.1
    • /
    • pp.21-49
    • /
    • 2016
  • Many mechanical, electrical and electronic products have more than one performance characteristics (PCs). For example the performance degradation of rubidium discharge lamps can be characterized by the rubidium consumption or the decreasing intensity the lamp. The product may degrade due to all the PCs which may be independent or dependent. This paper deals with the design of optimal bivariate step-stress partially accelerated degradation test (PADT) with degradation paths modelled by gamma process. The dependency between PCs has been modelled through Frank copula function. In partial step-stress loading, the unit is tested at usual stress for some time, and then the stress is accelerated. This helps in preventing over-stressing of the test specimens. Failure occurs when the performance characteristic crosses the critical value the first time. Under the constraint of total experimental cost, the optimal test duration and the optimal number of inspections at each intermediate stress level are obtained using variance optimality criterion.

Structural Analysis of KARI General Small-scaled Rotor Test System (GSRTS) (KARI 축소 로터 시험장치(GSRTS) 구조해석)

  • Kim, Deog-Kwan
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.15-23
    • /
    • 2008
  • This paper describes the structural analysis results of KARI General Small-scaled Rotor Test System (GSRTS) operated in KARI to verify operational safety. This GSRTS was developed to conduct a froude and mach small-scaled rotor test. This analysis was performed to investigate the structural Factor of Safety for the various small-scale rotor system like articulated or hingeless rotor and to check the operational capability using given operational design load. Specially, drive system has several bearings, mechanical gears, shaft, etc. and these parts must be required to achieve an operational safety. The calculation was done by using geometric data and material properties by analytical method. This rotor test system should be operated within these calculated Factor of Safety. Furthermore, the operational limitation should be defined as applied to small-scale rotor system of KUH in future.

  • PDF

A Study on the Operational Environment of Railway Signalling System (철도 신호시스템 환경요구사양 및 시험사양에 관한 연구)

  • Joung, E.J.;Hwang, J.G.;Lee, J.W.;Kim, Y.M.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1384-1386
    • /
    • 2000
  • To determine operational requirement, the environmental condition for an equipment must be investigated, and to certify equipment's normalized operation, appropriate test must be carried out under the considered environmental condition. The actual environmental conditions to which equipment is likely to be exposed are normally complex and will comprise a number of environmental factors and corresponding parameters, When defining the environmental conditions for a certain application it is, therefore, necessary to list the factors involved and select the appropriate severity. The operational environment is structured in two separate such as requirements, guidance and test specifications. For the preparation to determine operational requirement, operational environment of railway signalling equipment is investigated.

  • PDF

The Development of the Platform for the Simulations of the Vehicle Operational Control for PRT (소형궤도차량의 차량운행제어 모의시험을 위한 플랫폼 개발)

  • Lee, Jun-Ho;Jeong, Rac-Gyo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1441-1444
    • /
    • 2009
  • In this paper a platform that makes it possible the simulations of the vehicle operational control for PRT (Personal Rapid Transit) is introduced. PRT system has very short headway and requires accurate speed control of the vehicles to avoid the impact between the vehicles. The proposed platform is composed of central control system, station control system, communication control system, AP for wireless communication, and monitoring system. Simple operational test scenarios are presented and the effectiveness of the proposed platform is shown using the test scenarios.

  • PDF

Developing Strategies to Improve Operational Test and Evaluation of Weapon System in the Age of the Fourth Industrial Revolution (4차 산업혁명 시대에 적합한 무기체계 운용시험평가 개선전략 도출)

  • Lee, Kangkyong;Seol, Hyeonju
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.23 no.6
    • /
    • pp.591-601
    • /
    • 2020
  • After North Korea's sixth nuclear test, the operational environment on the Korean Peninsula has fundamentally changed, and the South Korean military faces various security challenges, including a reduction in military service resources and shorter military service periods. In particular, the South Korean military is seeking a new paradigm in military construction amid changes in the defense acquisition environment linked to the push for defense reform 2.0 and the utilization of the fourth industrial revolution. Therefore, this study considered strategies for improving the operational test and evaluation of weapons systems suitable for changes in the defense acquisition environment to effectively prepare for existing military threats and future warfare patterns. For this purpose, external environment analysis and internal capabilities were diagnosed using PEST Analysis and SPRO Analysis, and improvement strategies were derived through SWOT analysis.