• 제목/요약/키워드: operational estimation

검색결과 304건 처리시간 0.028초

Identification of bridge bending frequencies through drive-by monitoring compensating vehicle pitch detrimental effect

  • Lorenzo Benedetti;Lorenzo Bernardini;Antonio Argentino;Gabriele Cazzulani;Claudio Somaschini ;Marco Belloli
    • Structural Monitoring and Maintenance
    • /
    • 제9권4호
    • /
    • pp.305-321
    • /
    • 2022
  • Bridge structural health monitoring with the aim of continuously assessing structural safety and reliability represents a topic of major importance for worldwide infrastructure managers. In the last two decades, due to their potential economic and operational advantages, drive-by approaches experienced growing consideration from researcher and engineers. This work addresses two technical topics regarding indirect frequency estimation methods: bridge and vehicle dynamics overlapping, and bridge expansion joints impact. The experimental campaign was conducted on a mixed multi-span bridge located in Lombardy using a Ford Galaxy instrumented with a mesh of wireless accelerometers. The onboard time series were acquired for a number of 10 passages over the bridge,performed at a travelling speed of 30 km/h, with no limitations imposed to traffic. Exploiting an ad-hoc sensors positioning, pitch vehicle motion was compensated, allowing to estimate the first two bridge bending frequencies from PSD functions; moreover, the herein adopted approach proved to be insensitive to joints disturbance. Conclusively, a sensitivity study has been conducted to trace the relationship between estimation accuracy and number of trips considered in the analysis. Promising results were found, pointing out a clear positive correlation especially for the first bending frequency.

Hydraulic Clutch System의 Mission Profile 및 내구시험모수 결정에 관한 연구 (A Study on Mission Profile and Determination of Durability Test Parameters in the Hydraulic Clutch System)

  • 이상천;허만대;이춘곤;김재영;강지우;이홍범;소윤섭;이종형;민병길;이재열
    • 대한기계학회논문집A
    • /
    • 제33권5호
    • /
    • pp.521-528
    • /
    • 2009
  • One of reliability measurements of vehicle is estimated by driving mileage but the reliability of component, such as an hydraulic clutch system, is defined from the number of successful operational cycle. Relationship between these reliability measurement variables(mileage and cycle) should be examined first of all in the reliability estimation of components. Relationship between mileage and cycles is commonly known as linear function. However, the gradient depends on the operational environmental condition. Therefore, estimation of mission profile variable should be done with correlation analysis at the same time. In this paper, we derive mission profile variable of an hydraulic clutch system by field vehicle test and suggest the determination process of durability test parameters of CMC(Clutch Master Cylinder) with mission profile variable.

온실가스·에너지 목표관리제를 위한 폐기물 매립시설 메탄배출량의 적정 산정방법에 관한 고찰 (Review of the Estimation Method of Methane Emission from Waste Landfill for Korean Greenhouse Gas and Energy Target Management System)

  • 서동천;나제현;배성진;이동훈
    • 대한환경공학회지
    • /
    • 제35권12호
    • /
    • pp.867-876
    • /
    • 2013
  • 우리나라에서 시행되고 있는 '온실가스 에너지 목표관리제'의 효율적인 운영을 통하여 실질적인 온실가스 배출을 감축하고 향후 예정되어 있는 '탄소배출권 거래제'의 원활한 추진을 위해서는 온실가스배출량의 정확한 산정이 요구된다. 폐기물부문에서 주요 온실가스배출원인 폐기물 매립시설에 대해서도 목표관리제 운영지침에서 온실가스배출량 산정방법이 제시되어 있으나 계산방법과 매개변수 등에 오차요인이 있어 적정 산정방법에 대해 검토 제안하고자 하였다. 그 결과, 메탄회수율 0.75를 기준으로 산정방법을 구분하고 그 단일값과 메탄회수량으로부터 메탄발생량을 계산하는 방법은 삭제하여 온실가스배출량 산정과정의 중복적용과 과대평가 발생요인을 해소할 필요가 있음을 알 수 있었다. 메탄발생량은 일차분해모델로 추정하고 메탄회수량은 매립시설에서 측정한 값을 사용하도록 하되 과거 메탄회수량 데이터를 확보하기 곤란한 경우에는 메탄회수량을 산정할 수 있도록 일일복토나 중간복토가 포설된 사용중 매립시설에서는 가스배제공과 간이소각 0.60, 강제포집 시스템 0.65로, 최종복토가 이루어진 사용종료 매립시설은 자연적인 포집이나 강제포집이 수행되면 0.90으로 국내 매립시설에 적합한 조건별 메탄회수율 기준값을 제시하였다. 주요 매개변수 중 분해 가능한 유기탄소 비율(DOC)과 메탄으로 전환 가능한 DOC 비율($DOC_f$)은 국내 폐기물의 조성별 특성을 반영할 수 있도록 국내 연구결과를 이용하여 기준값을 도출하여 사용할 수 있으며, 메탄보정계수(MCF)는 매립시설의 설계나 설치 등의 단순한 기준으로 판단할 수 없으므로 명확한 기준이 요구되는 것으로 나타났다.

S-BRT 운행행태를 고려한 저상버스의 정차시간 예측모형 (A Estimation of Dwell Time of Low-floor Buses considering S-BRT Operation Behavior)

  • 신소명;이수범;김영찬;박신형;유연승;최정훈
    • 한국안전학회지
    • /
    • 제36권1호
    • /
    • pp.72-79
    • /
    • 2021
  • This basic study introduces the concept of S-BRT and develops dwell time estimation models that consider road geometry and S-BRT characteristics for a signal operation strategy to meet the S-BRT's operational goal of high speed and punctuality. Field surveys of low-floor buses similar in shape to S-BRTs and data collection of passengers, station elements, vehicle elements, and other factors that can affect stop times were used in a regression analysis to establish statistically significant dwell time estimation models. These dwell time estimation models are developed by categorizing according to the locations of the signal or sidewalk that have the most impact on the dwell time. In this way, the number of people boarding and alighting the bus at the crowded door and the number of people boarding and alighting the bus at the front door considering the internal congestion was analyzed to affect the dwell time. The estimation dwell time models in this study can be used in the establishment of strategies that provide priority signals to S-BRTs.

Impact of Working Capital Management on Firm Performance in Different Business Cycles: Evidence from Vietnam

  • NGUYEN, Co Trong
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권12호
    • /
    • pp.863-867
    • /
    • 2020
  • This study was conducted on financial data of 38 economic groups listed on Vietnam's stock market for the period 2009 - 2019 and it aims to provide an empirical evidence on the impact of working capital management policy on performance in all phases of the economic cycle of Vietnamese economic groups. The study uses FGLS estimation method with 2 dependent variables ROA, GOP, independent variables including INV, AR, AP, CCC, dummy variable representing different phases of the economic cycle, variables Control includes CAT, CR, LEV, SZ, GR. Research shows that the greater the level of investment by companies in liquid assets corresponding to a certain level of activity (shown by average days of inventory (INV), average days of collection. (AR), cash flow cycle (CCC)) the lower the rate of return on assets. The study also provides additional evidence of the negative effects of economic crisis on the performance of economic groups. The study also shows that the number of short-term asset cycles has a positive impact on operational efficiency, and the level of debt use has a negative impact on operational efficiency. This result implies that the managers of economic groups can increase the efficiency of businesses through a reasonable working capital policy.

Non-periodic Subway Scheduling that Minimizes Operational Cost and Passenger Waiting Time

  • Hong, YunWoo;Chung, Yerim;Min, YunHong
    • 한국컴퓨터정보학회논문지
    • /
    • 제23권8호
    • /
    • pp.133-142
    • /
    • 2018
  • Subway metro scheduling is one of the most important problems impacting passenger convenience today. To operate efficiently, the Seoul metro uses regular, periodic schedules for all lanes, both north and southbound. However, many past studies suggest that non-periodic scheduling would better optimize costs. Since the Seoul metro is continuously facing a deficit, adopting a non-periodic schedule may be necessary. Two objectives are presented; the first, to minimize the average passengers' waiting time, and the second, to minimize total costs, the sum of the passenger waiting time, and the operational costs. In this paper, we use passenger smart card data and a precise estimation of transfer times. To find the optimal time-table, a genetic algorithm is used to find the best solution for both objectives. Using Python 3.5 for the analysis, for the first objective, we are able to reduce the average waiting time, even when there are fewer trains. For the second objective, we are able to save about 4.5 thousand USD with six fewer trains.

중고선 개조와 신조에 의한 CO2 운송선 확보 및 운용방안에 관한 연구 (A Study on the Operational Plan and Acquisition Method for CO2 Carrier by Retrofitting Existing Vessels and New Ship-Building)

  • 신명수;박범진;기민석;이대학
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제18권1호
    • /
    • pp.15-21
    • /
    • 2015
  • 본 연구에서는 이산화탄소 해양지중저장을 위한 운송 수단으로 활용될 $CO_2$ 운송선의 타당성조사 결과에 대하여 논한다. 중고 화물선 개조에 의한 $CO_2$ 운송선 확보와 신조에 의한 운송선 확보를 위한 개념 설계를 수행하였고, 이를 토대로 $CO_2$ 운송선의 획득 비용을 추정하였다. 마지막으로 가정한 시나리오에 대한 운용 방안을 검토하여 연간 운송량을 수송할 수 있는 필요 척수와 소요 비용을 함께 추정하였다.

한국형 기동무기체계 양산비 비용추정관계식 개발에 관한 연구 (A Study on Developing a CER Using Production Cost Data in Korean Maneuver Weapon System)

  • 이두현;김각규
    • 한국경영과학회지
    • /
    • 제39권3호
    • /
    • pp.51-61
    • /
    • 2014
  • In this paper, we deal with developing a cost estimation relationships (CER) for Korean maneuverable weapons systems using historical production cost. To develop the CER, we collected the historical data of the production cost of four tanks and five armored vehicles. We also analyzed the Required Operational Capability (ROC) of the weapons systems and chose cost drivers that can compare operational capabilities of the weapons systems We used Forward selection, Backward selection, Stepwise Regression and $R^2$ selection as the cost drivers which have the greatest influence with the dependent variables. And we used Principle Component Regression, Robust Regression and Weighted Regression to deal with multicollinearity and outlier among the data to develop a more appropriate CER. As a result, we were able to develop a production cost CER for Korean maneuverable weapons systems that have the lowest cost errors. Thus, this research is meaningful in terms of developing a CER based on Korean original cost data without foreign data and these methods will contribute to developing a Korean cost analysis program in the future.

척추 융합 수술을 위한 삼차원 척추경 모델을 이용한 자동 수술 계획 시스템 (Automated Surgical Planning System for Spinal Fusion Surgery with Three-Dimensional Pedicle Model)

  • 이종원;김성민;김영수;정완균
    • 제어로봇시스템학회논문지
    • /
    • 제17권8호
    • /
    • pp.807-813
    • /
    • 2011
  • High precision of planning in the preoperative phase can contribute to increase operational safety during computer-aided spinal fusion surgery, which requires extreme caution on the part of the surgeon, due to the complexity and delicacy of the procedure. In this paper, an advanced preoperative planning framework for spinal fusion is presented. The framework is based on spinal pedicle data obtained from CT (Computed Tomography) images, and provides optimal insertion trajectories and pedicle screw sizes. The proposed approach begins with safety margin estimation for each potential insertion trajectory that passes through the pedicle volume, followed by procedures to collect a set of insertion trajectories that satisfy operation safety objectives. The radius of a pedicle screw was chosen as 70% of the pedicle radius. This framework has been tested on 68 spinal pedicles of 8 patients requiring spinal fusion. It was successfully applied, resulting in an average success rate of 100% and a final safety margin of $2.44{\pm}0.51mm$.

지형기후모형에 근거한 서리경보시스템 구축 (Site - Specific Frost Warning Based on Topoclimatic Estimation of Daily Minimum Temperature)

  • 정유란;서희철;윤진일
    • 한국농림기상학회지
    • /
    • 제6권3호
    • /
    • pp.164-169
    • /
    • 2004
  • A spatial interpolation scheme incorporating local geographic potential for cold air accumulation (TOPSIM) was used to test the feasibility of operational frost warning in Chatancheon basin in Yeoncheon County, where the introduction of new crops including temperate zone fruits is planned. Air temperature from April to June 2003 was measured at one-minute intervals at four locations within the basin. Cold-air accumulation potentials (CAP) at 4 sites were calculated for 3 different catchment scales: a rectangular area of 65 x 55 km which covers the whole county, the KOWACO (Korea Water Corporation) hydrologic unit which includes all 4 sites, and the sub-basins delineated by a stream network analysis of the digital elevation model. Daily minimum temperatures at 4 sites were calculated by interpolating the perfect prognosis (i.e., synoptic observations at KMA Dongducheon station) based on TOPSIM with 3 different CAPs. Mean error, mean absolute error, and root mean square error were calculated for 45 days with no precipitation to test the model performance. For the 3 flat locations, little difference was detected in model performance among 3 catchment areas, but the best performance was found with the CAPs calculated for sub-basins at one site (Oksan) on complex terrain. When TOPSIM loaded with sub-basin CAPs was applied to Oksan to predict frost events during the fruit flowering period in 2004, the goodness of fit was sufficient for making an operational frost warning system for mountainous areas.