• 제목/요약/키워드: open cut

Search Result 242, Processing Time 0.026 seconds

A Study on Environmental Monitoring of Open-cut Mining Ground Using Remote Sensing Technique

  • Tanaka Yoshiki;Tachiiri Kaoru;Gotoh Keinosuke;Hamamoto Ryota
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.549-552
    • /
    • 2004
  • Since open-cut mining excavates gradually from the top of the mountain, vegetation planting is needed to reduce negative environmental impact on the surrounding environment. Accordingly, this study aimed at performing the environmental monitoring of the open-cut mining ground using the satellite remote sensing technique. As the research technique, in order to grasp the environmental change around the open-cut mining ground, NDVI (normalized difference vegetation index) was calculated, and every year change of the vegetation activity was analyzed. The results of the study showed lower vegetation activity in the open-cut mining ground compared to the surrounding areas and suggested the need for closed monitoring by remote sensing techniques.

  • PDF

Railway Underground Crossing Method Using PC Slab (직접 PC슬래브설치를 통한 철도지하횡단 공법의 적용 연구)

  • Min, Kyung-Ju;Lee, Bang-Woo;Park, Byung-Yong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2439-2449
    • /
    • 2011
  • Existing grade crossings between railway and roadway area gradually changed to grade separation systems by the law. In the case of new roadway construction which crosses railways, it shall be grade separation system in principle. With the railway underground crossing method, many practices have been developed which can minimize rail displacements and avoid rail release. With these methods, the effects to the train can be reduced. The underground crossing methods can be identified as open-cut methods and non open-cut methods. The open-cut methods include temporary support methods and special rail construction methods. Also the non open-cut methods includes pipe roof methods, front jacking methods, messer shield methods, NTR methods and JES methods. Among these, the most suitable method is applied considering safety, economy, class of each rail system (train passing frequency and velocity), etc. In the non open-cut methods, the cost and duration shall be increased to keep existing rail system during construction. In the open-cut methods which use plate girders, the rail speed shall be restricted due to the displacement and vibration of the girder. In this study new grade separation methods were developed. With this method, the safety during construction can be increased. This method refines temporary support methods, but pc slab girder with huge stiffness is applied instead of plate girders. With this method, the rail displacement can be reduced and higher safety can be obtained during construction. Also construction cost and duration can be minimized because the temporary work and the overburden soil depth can be reduced.

  • PDF

ON FUZZY MAXIMAL, MINIMAL AND MEAN OPEN SETS

  • SWAMINATHAN, A.;SIVARAJA, S.
    • Journal of Applied and Pure Mathematics
    • /
    • v.4 no.1_2
    • /
    • pp.79-84
    • /
    • 2022
  • We have observed that there exist certain fuzzy topological spaces with no fuzzy minimal open sets. This observation motivates us to investigate fuzzy topological spaces with neither fuzzy minimal open sets nor fuzzy maximal open sets. We have observed if such fuzzy topological spaces exist and if it is connected are not fuzzy cut-point spaces. We also study and characterize certain properties of fuzzy mean open sets in fuzzy T1-connected fuzzy topological spaces.

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • v.32 no.1
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.

Measures to Reduce Mine Hazards Caused by Open- cut Mining of Limestone Mines (석회석광산에서 노천채굴에 따른 광해 발생을 감소시키기 위한 대책)

  • Won, Yeon-Ho;Ah, Jin-Man
    • Explosives and Blasting
    • /
    • v.24 no.2
    • /
    • pp.75-82
    • /
    • 2006
  • Most of limestone mines in Korea have been developed by a open-cut mining method in consideration of a deposited condition of ore, ore recovery, safety, economic efficiency, etc.. But it has produced environmental problems such as dust flying, blasting noise & vibration, and spoil of farmlands due to slope failure of waste rock mass caused by access road construction, fragmentation & crush of rocks, blasting, transportation, and mineral processing. In this study, it has been suggested for measures to reduce mine hazards caused by open- cut mining of limestone nines.

Experimental study to determine the optimal tensile force of non-open cut tunnels using concrete modular roof method

  • Jung, Hyuk-Sang;Kim, Jin-Hwan;Yoon, Hwan-Hee;Sagong, Myung;Lee, Hyoung-Hoon
    • Geomechanics and Engineering
    • /
    • v.29 no.3
    • /
    • pp.229-236
    • /
    • 2022
  • In this study, a model experiment and field experiment was conducted to introduce the optimal tensile force when constructing a non-open cut tunnel according to the ground conditions of sandy soil. CMR (Concrete Modular Roof) method is economical because of the high precision and excellent durability, and corrosion resistance, and the inserted parts can be used as the main structure of a tunnel. In addition the CMR method has a stable advantage in interconnection because the concrete beam is press-fitted compared to the NTR (New Tubular Roof) method, and the need for quality control can be minimized. The ground conditions were corrected by adjusting the relative density of sandy soil during the construction of non-open cut tunnels, and after introducing various tensile forces, the surface settlement according to excavation was measured, and the optimal tensile force was derived. As a result of the experiment, the amount of settlement according to the relative density was found to be minor. Furthermore, analysis of each tensile force based on loose ground conditions resulted in an average decrease of approximately 22% in maximum settlement when the force was increased by 0.8 kN per segment. Considering these results, it is indicated that more than 2.0 kN tensile force per segment is recommended for settlement of the upper ground.

Symbolic Generation of Dynamic Equations and Modeling of a Parallel Robot (기호 운동방정식 생성과 병렬형 로봇 모델링)

  • Song, Sung-Jae;Cho, Byung-Kwan;Lee, Jang-Moo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.20 no.1
    • /
    • pp.35-43
    • /
    • 1996
  • A computer program for automatic deriving the symbolic equations of motion for robots using the programming language MATHEMATICA has been developed. The program, developed based on the Lagrange formalism, is applicable to the closed chain robots as well as the open chain robots. The closed chains are virtually cut open, and the kinematics and dynamics of the virtual open chain robot are analyzed. The constraints are applied to the virtually cut joints. As a result, the spatial closed chain robot can be considered as a tree structured open chain robot with kinematic constraints. The topology of tree structured open chain robot is described by a FATHER array. The FATHER array of a link indicates the link that is connected in the direction of base link. The constraints are represented by Lagrange multipliers. The parallel robot, DELTA, having three-dimensional closed chains is modeled and simulated to illustrate the approach.

A Hybrid Genetic Algorithm for Optimizing Torch Paths to Cut Stock Plates Nested with Open Contours (열린 윤곽선 부재로 이루어진 판재의 절단가공경로 최적화를 위한 혼합형 유전알고리즘)

  • Lee, Moon-Kyu
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.30-39
    • /
    • 2010
  • This paper considers a problem of optimizing torch paths to cut stock plates nested with open contours. For each contour, one of the two ending points is to be selected as a starting point of cutting with the other being the exit point. A torch path is composed of a single depot and a series of starting and ending points of contours to be cut. The torch path optimization problem is shown to be formulated as an extended version of the standard travelling salesman problem. To solve the problem, a hybrid genetic algorithm with the local search of torch paths is proposed. The genetic algorithm is tested for hypothetical problems whose optimal solutions are known in advance due to the special structure of them. The computational results show that the algorithm generates very near optimal solutions for most cases of the test problems, which verifies the validity of the algorithms.

Dynamic Equations of Robots and Sensitivity Analysis (로봇 운동방정식과 감도해석)

  • Song, Sung-Jae;Lee, Jang-Moo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.12 no.6
    • /
    • pp.105-111
    • /
    • 1995
  • The inverse dynamic equations for 5 link robot including a closed chain have been derived. The closed chain is virtually cut open, and the kinematics and dynamics of the virtual open chain robot are analyzed. The constraints are applied to the virtually cut joints by the Jacobian matrix which represents the configuration of the closed chain. The topology of tree structrued open chain robot is described by a FATHER array. The FATHER array of a link indicates the link tha tis connected in the direction of base link. Based on the inverse dynamic equations, the torque sensitivity models of the 5 link robot have been developed. The sensitivity models characterize the sensitivity of the driving torque with respect to the link parameters. All the procedures are illustrated through the 2 link robot.

  • PDF

Influence of Forcing Cultivation Time on Cut Flower, Root Quality, and Yield in Peony (Paeonia lactiflora Pall. cv. Taebaek) (작약 촉성재배 시기가 절화와 뿌리품질 및 수량에 미치는 영향)

  • Bae, Su-Gon;Kim, Jwoo-Hwan;Park, Sang-Jo;Kim, Jae-Cheol
    • Korean Journal of Medicinal Crop Science
    • /
    • v.16 no.6
    • /
    • pp.421-426
    • /
    • 2008
  • Three year-old peony (Paeonia. lactiflora Pall. cv. Taebaek) was cultivated in green-house at Jan. 15, Feb. 15, or Mar. 15, respectively. The mean of temperature during the forcing cultivation was higher (air; $1.0{\sim}11.1^{\circ}C$, soil; $1.1{\sim}7.4^{\circ}C$) than that of open-field condition. From sprouting to flowering in peony cultivated at Jan. 15 was about 54 days, which is shorted the cut flower periods (ca. 26 days) compared with the open-field cultivation. However, earlier forcing cultivars were very susceptible to pathogens such as powdery mildew or gray mold. The yield in green house was also lower than in the open-field cultivation. The content of bioactive compounds such as paeoniflorin and albiflorin in green-house cultivars was similar that of open-field cultivars. These results showed the forcing cultivation time of peony at Feb. 15 in green-house was most desirable for commercialization.