• Title/Summary/Keyword: on-site testing

Search Result 453, Processing Time 0.03 seconds

Efficient Multi-site Testing Using ATE Channel Sharing

  • Eom, Kyoung-Woon;Han, Dong-Kwan;Lee, Yong;Kim, Hak-Song;Kang, Sungho
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.13 no.3
    • /
    • pp.259-262
    • /
    • 2013
  • Multi-site testing is considered as a solution to reduce test costs. This paper presents a new channel sharing architecture that enables I/O pins to share automatic test equipment (ATE) channels using simple circuitry such as tri-state buffers, AND gates, and multiple-input signature registers (MISR). The main advantage of the proposed architecture is that it is implemented on probe cards and does not require any additional circuitry on a target device under test (DUT). In addition, the proposed architecture can perform DC parametric testing of the DUT such as leakage testing, even if the different DUTs share the same ATE channels. The simulation results show that the proposed architecture is very efficient and is applicable to both wafer testing and package testing.

A Study for the Effect on the Uncertainty of Power Performance Testing of Windturbine by a Site Calibration (Site calibration이 풍력발전시스템 성능시험 불확도에 미치는 영향 연구)

  • Kim, Keon-Hoon;Hyun, Seung-Gun
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.2
    • /
    • pp.107-112
    • /
    • 2011
  • A comparison study between two performance testing results, one is on the site calibration not needed and the other is needed, was proceeded for the understanding on the effect of site calibration on the complex terrain. As a result, it is revealed that all of uncertainty components is effected by the topographical features dramatically. And the maximum difference of uncertainty reached at around 8% of rated capacity of wind turbine. So, the site calibration is an effective method to remove the variable wind effect by the ground complexity and must be proceeded before the power performance testing of a wind turbine.

On-line and Off-line Partial Discharge Monitoring System with HVAC Testing (HVAC에 의한 On-line, Off-line PD 모니터링)

  • Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.111-114
    • /
    • 2008
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

THE ASTRONOMICAL SITE SURVEY IN WEST CHINA

  • YAO YONGQIANG
    • Journal of The Korean Astronomical Society
    • /
    • v.38 no.2
    • /
    • pp.113-116
    • /
    • 2005
  • The program of site survey in western China has been initiated by the National Astronomical Observatories of China(NAOC) toward large telescope facilities. The program is carried out in aspects of remote studies and local surveys. The preliminary results show that the eastern Pamirs and Ali area in Tibet may be the best candidates for further monitoring. The site survey group of NAOC will proceed to set up site testing stations on the selected sites and perform monitoring and campaign in 2005.

Wind Analysis and Site Assessment for Test Site of 3MW Wind Power System (3MW 풍력발전시스템 개발품의 육상풍력실증단지 조성 타당성 평가를 위한 풍황 및 지형평가 연구)

  • Woo, Sangwoo;Lee, Ki-Hak;Lee, Sang-Il;Park, Jong-Po
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.35.2-35.2
    • /
    • 2011
  • A wind turbine power performance test is very important to wind turbine manufacturers because a wind farm developer or planner must want to define power performance characteristics and reliability of new wind turbines. Based on the IEC 61400-12-1, A wind turbine test site has to be nicely installed at flat terrain for testing. We are developing the wind power system which is IEC wind class IIa model with rated power of 3MW. KEPCO's Gochang power testing center was considered as candidates to build the test site without site calibration. This paper aims to verify the validity of the test site by using implement site assessment result that was based on IEC 61400-12-1.

  • PDF

Performance-measure of the domestic web site design (국내 웹 사이트 디자인의 행동적 사용성 측정)

  • Gwak, Ho-Wan;Gwak, Ji-Eun;Kim, Su-Jin
    • Journal of the Ergonomics Society of Korea
    • /
    • v.18 no.3
    • /
    • pp.87-103
    • /
    • 1999
  • The present study employed an experimental usability testing technique to explore cognitive engineering characteristics of WWW. Based on the results of our previous study which employed non-experimental methods such as questionnaire and heuristic evaluation method, this study used a behavioral performance-measurement technique to evaluate the usability of a domestic web-site design. Specifically, we revised the menu and document structure of the original 'Movie-Friend' site to solve the design problems which were extracted from the results of the heuristic evaluation method of our previous study. Exp. 1 compared the relative navigation efficiency of the original frame menu site and the revised pop-up toolbar site, and Exp. 2 compared the toolbar menu site and the revised frame site. As a result of Exp. 1, the revised pop-up toolbar site showed improved navigation efficiency compared to the original site, as indicated by the mean latency and the number of pathways to reach the target page. However, we found no performance difference between the frame site and toolbar site in Exp. 2.

  • PDF

On-line Condition Monitoring for Electric Equipments (전력 설비 시스템의 온라인 감시)

  • Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.103-105
    • /
    • 2008
  • In, this paper, we consider the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PO) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PO testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PO measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

A Research Trend on On-Line/Off-Line PD Insulation Diagnostic System (온라인 및 오프라인 PD 모니터링에 관한 연구 동향)

  • Choo, Jong-Hoon;Hong, Chang-Il;Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.2008-2009
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is introduced.

  • PDF

Evaluation of the Korean e-government Web Sites Focused on Usability (대한민국 전자정부 웹사이트의 유용성 평가)

  • Byun, Dae-Ho
    • Information Systems Review
    • /
    • v.7 no.1
    • /
    • pp.1-20
    • /
    • 2005
  • In this paper we evaluate the Korean e-government portal and linked web sites, based on usability. We pick a set of 18 representative government sites, and consider two approaches of type-I and type-II testing with different questionnaires. We ask users two questions at each site, regarding simple facts. We count a task as successful if the user find the right answer for fact questions. In type-I testing, after users have finished working with a site, we give them a post-test questionnaire asking them to rate the site in 16 different areas, in order to calculate the site rating. In type-II testing, we investigate page design, contents design, and site design of the web sites.

Trend in Off-Line PD Monitoring with HVAC Testing (배전반 설비의 온라인 모니터링 및 진단의 동향)

  • Yun, Ju-Ho;Hong, Chang-Il;Hwang, Jong-Sun;Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2007.06a
    • /
    • pp.529-530
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF