• Title/Summary/Keyword: offshore wind farm

Search Result 170, Processing Time 0.028 seconds

CFD Study on Aerodynamic Power Output of 6 MW Offshore Wind Farm According to the Wind Turbine Separation Distance (CFD를 활용한 6 MW 해상풍력발전단지의 풍력터빈 이격거리에 따른 공기역학적 출력 변화연구)

  • Choi, Nak-Joon;Nam, Sang-Hyun;Jeong, Jong-Hyun;Kim, Kyung-Chun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.35 no.8
    • /
    • pp.1063-1069
    • /
    • 2011
  • This paper presents aerodynamic power outputs of wind turbine of 6 MW wind farm composed of 3 sets of 2 MW wind turbine according to the separation distance by using CFD. Layout design including offshore wind farm and onshore wind farm is key factor for the initial investment cost, annual energy production and maintenance cost. For each wind turbine rotor, not actuator disc model with momentum source but full 3-dimensional model is used for CFD and it has a great technical meaning. The results of this study can be applied to the offshore wind farm layout design effectively.

A Study on Local Acceptance of Offshore Wind Farm: Focus on Maldo, Gunsan (해상풍력 주민수용성 연구: 군산 말도를 중심으로)

  • Lee, Sanghyuk;Park, Jaepil
    • New & Renewable Energy
    • /
    • v.16 no.2
    • /
    • pp.20-27
    • /
    • 2020
  • According to "The Renewable Energy 3020 Implementation Plan", offshore wind power accounts for 12 GW of the total new capacity of 48.7 GW. Like the south-west 2.5 GW offshore wind farm case, government-led development has had difficulty in securing the residents' acceptability. This study contributes to the study of local acceptance by analyzing the perceptions of Maldo residents. To this end, in-depth interviews were conducted with the head of a village and fishing village chief, and the entire contents of the interview were revised and analyzed. The cognitive structure of the stakeholders could be confirmed using semantic network analysis, which analyzes the network structure among words. Based on the analysis results, focusing on the identity frames related to the compensation process from previous national projects, gain vs. loss frames act as the dominant frame in terms of profits from offshore wind turbines. To invigorate offshore wind farms, the policy implications as follows. First, a negotiation organization should be organized to deal with strategic opposition by fishes. Second, installing offshore wind farms on a public water body will result in demands for compensation from various actors, and a licensed fishing territory as an offshore wind farm installation site should be considered.

A Study on the Application of DC HTS cable systems to enhance power transfer limits of a grid-connected offshore wind farm

  • Hur, Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.2
    • /
    • pp.97-103
    • /
    • 2015
  • This paper introduces two on-going projects for DC high temperature superconducting (HTS) cable systems in South Korea. This study proposes the application of DC HTS cable systems to enhance power transfer limits of a grid-connected offshore wind farm. In order to develop the superconducting DC transmission system model based on HTS power cables, the maximum transfer limits from offshore wind farm are estimated and the system marginal price (SMP) calculated through a Two-Step Power Transfer (TSPT) model based on PV analysis and DC-optimal power flow. The proposed TSPT model will be applied to 2022 KEPCO systems with offshore wind farms.

A Study on the Establishment of Allowable Criteria for Sailing Ships at Offshore Wind Farms (해상풍력발전단지해역 선박 통항 허용기준 설정에 관한 연구)

  • Ohn, Sung-Wook;Lee, Chang-Hyun;Kim, Cheol-Seong
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.7
    • /
    • pp.841-847
    • /
    • 2018
  • Since global energy consumption and demand for energy have dramatically risen, a focus on environmental problems and sustainability has become more important. Clean and renewable energy sources such as offshore wind power generation have received attention among new renewable energy options as alternative energy resources. Due to maintenance and operational perspectives, offshore wind farms have been planned for installation in many coastal waters. However, development of offshore wind farms faces interference from existing maritime traffic along the planned areas. In order to safely and effectively govern marine traffic in the vicinity of wind farms and inner areas, standard criteria are suggested to allow vessels to sail the internal waters of offshore wind farm areas. Therefore, the purpose of this study is to establish allowable criteria for sailing vessels and safety zones for offshore wind farms by investigating the local regulations of various offshore wind farm cases overseas. The commended inner safety zone of wind farms is proposed to be a distance of 150 % of the rotation diameter of the wind turbine rotor and a distance of 200 m from the outer wind turbine for the outer safety zone. Besides this, the allowable criteria for sailing vessels within a wind farm is proposed to have an air draft of 14.47 m south-west wind farm sea areas for a minimum margin to avoid hull contact through evaluation of the tide and height of a wind turbine. further studies will be needed to establish vessel sailing criteria among adjacent offshore wind farms as well as vessel sailing criteria within a single offshore wind farm.

DC-link Voltage Control of HVDC for Offshore Wind Farm using Improved De-loading Method (개선된 De-loading기법을 이용한 해상풍력 연계용 HVDC의 DC 전압의 제어방안)

  • Huh, Jae-Sun;Moon, Won-Sik;Park, Sang-In;Kim, Doo-Hee;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.3
    • /
    • pp.399-404
    • /
    • 2015
  • This paper presents the DC voltage control method in DC link of High Voltage Direct Current(HVDC) for an offshore wind farm in Low Voltage Ride Through(LVRT) situation. Wind generators in an offshore wind farm are connected to onshore network via HVDC transmission. Due to LVRT control of grid side inverter in HVDC, power imbalancing in DC link is generated and this consequentially causes rising of DC voltage. A de-loading scheme is one of the method to protect the wind power system DC link capacitors from over voltage. But the flaw of this method is slow control response time and that it needs long recovery time to pre-fault condition after fault clear. Thus, this paper proposes improved de-loading method and we analyze control performance for DC voltage in LVRT control of HVDC for an offshore wind farm.

A Study on the Building of Tuna Farming in Floating Offshore Wind Power Generation Field at East Sea (동해 부유식 해상풍력발전단지 내 참다랑어 양식장 조성에 관한 연구)

  • Choi, Gun Hwan;Kim, Mi Jeong;Jang, Ki Ho;Kim, Hyo Seon
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.33 no.5
    • /
    • pp.179-186
    • /
    • 2021
  • We need measures that can come up with alternative about fishery living zone and enhance local acceptance for responding to the increase in the proportion of renewable energy production and construction of 12GW Offshore wind power according to Korea's Renewable Energy 3020 initiative and Korean-version New Deal. In this study, We suggest that differentiation plans of co-location model in connection with offshore wind power generation suitable for the East Sea. The East Sea is an optimal site for building of a floating offshore wind power generation(FOWPG) field. It is expected that economic effects like energy production, aquatic resource development and tourism industrialization by farming bluefin tuna which is high valued fish and suitable for offshore aquaculture on public waters in FOWPG field. And we can confirm that budget reduction, smart management by sharing operation management technology and increase in fishermen income.

Evaluation of Implementation Potential of Offshore Wind Farm Capacity in Korea Using National Wind Map and Commercial Wind Farm Design Tool (국가바람지도와 상용 단지설계 프로그램을 활용한 국내 해상풍력단지 공급가능 잠재량 산정)

  • Song, Yuan;Kim, Chanjong;Paek, Insu;Kim, Hyungoo
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.4
    • /
    • pp.21-29
    • /
    • 2016
  • Commercial wind farm design tools and the national wind map are used to determine the implementation potential of offshore wind power in Korea in this study. For this, the territorial waters of Korea were divided into nine analysis regions and a commercial CFD code was used to obtain wind resource maps at 100m A.S.L. which is the hub height of a 5MW wind turbine used in this study. With the wind resource obtained, factors including water depth, distance from substations, minimum and maximum capacity of a wind farm, distance between turbines and wind farms were considered to determine wind power potential. Also, the conservation areas, military zones, ports, fishing grounds, etc. were considered and excluded. As the result, a total capacity of 6,720 MW was found to be the implementation potential and this corresponds to $3.38MW/km^2$ in API. Also if the distance from the substation is not considered, the potential increased to be 10,040 MW. This offshore wind farm potential is considered enough to satisfy the target of wind farm capacities in the 7th national plan for electricity demand and supply.

Design of SCADA System for a Large-Scale Offshore Wind Farm (대규모 해상풍력발전단지 운용을 위한 SCADA 시스템 설계)

  • Kim, Dong Wook;Song, Jae Ju;Jung, Nam Joon;Choi, Hyo Yul
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.1 no.3
    • /
    • pp.161-170
    • /
    • 2012
  • In recent years, many researchers and developers have been interested in renewable energy all over the world. Particularly, the development of wind power is being processed actively due to its high economic efficiency. A few years ago, Korean government has started the research for building a large-scale offshore wind farm in domestic west-southern area. Current domestic SCADA technology level for operating wind farm is very low compared with foreign SCADA technology level. In this paper, we found IT issues and solutions for developing SCADA system. Based on these solutions, we designed SCADA system for a large-scale offshore wind farm.

Construction Technology Roadmapping for Port Offshore Wind Farm (항만해상풍력단지 건설기술 로드맵 수립)

  • Kim, Ki-Yoon;Jeong, Suk-Jai;Lee, Suk-Jun
    • Journal of Digital Convergence
    • /
    • v.11 no.2
    • /
    • pp.137-148
    • /
    • 2013
  • This paper aims to presents a systematic procedure for the development of construction technology roadmap, which can consider the offshore wind farm on port. Then the weight among the large/medium/small classified construction technology has identified through the AHP(Analytical Hierarchy Process) approach using FGI(Focus Group Interview) and questionnaire study. Based on the priority for classified construction technology a construction technology roadmap for port offshore wind farm was also developed. The technology roadmap suggests the time frame(20 years, from 2016 to 2036) to complete R&D work for the classified construction technology of port offshore wind farm. Such construction technology roadmap can be utilized as a milestone in setting up the R&D strategy in the green port construction industry.

A Study on the Conditions Analysis and Assessment of Supporting Port for Offshore Wind Farm : Focusing on Ports in Gyeongsangnam-do (해상풍력단지 지원항만 여건 분석 및 평가에 관한 연구 -경상남도 항만을 중심으로-)

  • Yang, Hang-Jin;Chiang, Bong-Gyu
    • Journal of Korea Port Economic Association
    • /
    • v.35 no.4
    • /
    • pp.85-106
    • /
    • 2019
  • Offshore wind power is a representative renewable energy source and a rapidly growing industry. In Gyeongsangnam-do, offshore wind farms of 461.9MW are being pushed for in the Yokji island and are expected to expand further to over 1GW in the future. Accordingly, ports supporting the storage, assembly, transportation, and installation of offshore wind power equipment are expected to play an important role in the smooth progress of the offshore wind farm development project. Based on previous research and cases in major countries,this study prepared criteria for assessment of ports supporting offshore wind farmsand evaluated ports in Gyeongsangnam-do, which are linked to Yokji island offshore wind farms. The assessment criteria have been subdivided into distance from the offshore wind farm, port entry and exit restrictions, navigational areas, fishery rights factors, additional costs, berth length, depth of berth, size of the port yard, port berth bearing pressure, interference with other cargo, a civil appeal, and relevant industrial aggregation. The ports of Tongyeong, Samcheonpo, Kohyun, Masan, and Jinhae in Gyeongsangnam-do were selected and evaluated. As a result, the port of Tongyoung was superior in terms of distance from the Yokji island offshore wind farm. The ports of Samcheonpo, Masan, and Jinhae were evaluated as excellent in other criteria such as berth length, depth of berth, and so on. This study is expected to be used as a source of basic data for offshore wind power companies and policymakers to select and evaluate the supporting ports of offshore wind farms.