• 제목/요약/키워드: offshore floating crane

검색결과 14건 처리시간 0.02초

Heave Compensator를 고려한 파랑 중 해상 크레인 설치작업 수치해석 (Numerical Analysis of Offshore Installation Using a Floating Crane with Heave Compensator in Waves)

  • 남보우;홍사영;김종욱;이동엽
    • 한국해양공학회지
    • /
    • 제26권1호
    • /
    • pp.70-77
    • /
    • 2012
  • In this study, a numerical analysis of offshore installation using a floating crane with heave compensator is carried out in time domain. The motion analysis of crane vessels is based on floating body dynamics using convolution integral and the crane wire is treated as simple spring. The lifted structure is assumed as a rigid body with 3 degree-of-freedom translational motion. The heave compensator is numerically modelled by the generalized spring-damper system. Firstly, forced motion simulations of crane wire system are carried out to figure out the basic principle of heave compensator. The transfer function of crane wire system is obtained and effective wave period of heave compensator are found. Then, coupled analysis of crane vessel, crane wire, and lifted structure are performed in regular and irregular sea conditions. Two different crane vessels and two lifted structures (suction pile and manifold) are considered in this study. Through a series of numerical calculations, the effective zone of heave compensator is investigated with respect to wave period and crane wire length.

해상 크레인을 이용한 해상 풍력 발전기의 다물체계 동역학 설치 해석 (Installation Analysis of Multibody Systems Dynamics of an Offshore Wind Turbine Using an Offshore Floating Crane)

  • 구남국;하솔;김기수;노명일
    • 한국전산구조공학회논문집
    • /
    • 제26권4호
    • /
    • pp.233-239
    • /
    • 2013
  • 신재생, 친환경 에너지에 대한 관심의 증가로 최근 상당수의 풍력 발전기가 설치되고 있다. 특히, 육상과 달리 부지 확보의 어려움도 없고 고품질의 바람을 얻을 수 있다는 점에서 해상 풍력 발전기가 더욱 주목을 받고 있다. 이와 같은 장점을 가진 해상 풍력 발전기는 육상의 조선소 등에서 제작된 후, 해상 크레인을 이용하여 운용 지점까지 이송되어 설치되는데, 이때 그 크기의 거대함과 고가라는 이유로 무엇보다 안전이 보증되어야 한다. 따라서 본 연구에서는 해상 풍력 발전기의 이송 및 설치 시 안전성을 보증하기 위한 근거로서, 다물체계 동역학 기법을 활용하여 해상 크레인에 연결된 해상 풍력 발전기의 동역학 해석을 수행하였다. 그 결과, 본 기법이 해상 풍력 발전기의 이송 및 설치방법에 대한 검증용으로 충분히 활용 가능함을 확인할 수 있었다.

해상 풍력 발전기 리프팅 해석을 위한 해상 크레인 멀티 붐 모델링 (Modeling of Multi-Boom Floating Crane for Lifting Analysis of Offshore Wind Turbine)

  • 박광필;차주환;이규열
    • 대한기계학회논문집A
    • /
    • 제35권1호
    • /
    • pp.115-120
    • /
    • 2011
  • 본 논문에서는 해양 풍력발전기를 해상 크레인으로 리프팅하기 위해 두 개의 탄성 붐을 가진 해상 크레인을 모델링 하고 동적 거동을 시뮬레이션 하였다. 운동 방정식은 강체와 탄성체가 포함된 다물체계 동역학을 기반으로 구성하였다. 외력으로는 유체정역학 힘, 규칙파에 의한 유체동역학 힘, 와이어로프의 장력, 계류력, 그리고 중력이 고려되었다. 두 개의 탄성 붐을 사용한 시뮬레이션 결과는 탄성 붐 한 개를 사용한 경우와 비교하여 모델의 타당성을 검증하였다. 5-MW(megawatt)급 해양 풍력 발전기를 해상 크레인이 리프팅하는 경우에 대해 동적 거동을 시뮬레이션하고 그 결과를 분석하였다.

해양플랜트용 라티스 붐 크레인의 최적 설계에 관한 연구 (A Study on the optimal design of lattice boom crane for offshore plant)

  • 김현지;김지혜;박상혁;최시연;허선철
    • 한국산업융합학회 논문집
    • /
    • 제22권6호
    • /
    • pp.757-765
    • /
    • 2019
  • In manufacturing An offshore plant is a structure that produces resources buried in the seabed. It can be classified into fixed, floating, and hybrid methods depending on the installation method. In particular, the Lattice boom type crane is typically used because it is used for a long time in the sea and moves to other seas, which is less affected by wind. In this study, the crane was designed by using three-step optimization design in the early stage of the design of Lattice boom crane for offshore plant. Finite element analysis was performed to verify the safety factor, deflection, buckling coefficient and fatigue life of the designed crane and the results were verified.

동수력학 해석 기반 부유식 해양 플랫폼의 동적 운동 및 계류력 산정 (Estimation of Dynamic Motions and Mooring Forces for Floating Type Offshore Platform Based on Hydrodynamic Analysis)

  • 차주환;문창일;송창용
    • 한국해양공학회지
    • /
    • 제26권2호
    • /
    • pp.48-57
    • /
    • 2012
  • This paper deals with numerical analyses in the context of estimations of hydrodynamic motions and dynamic loads for a floating type offshore platform using some exclusive simulation code such as code for the simulation of a floating type of offshore crane based on multi-body dynamics, along with the commercial code AQWA. Verifications of numerical models are carried out by comparing the RAO results from the simulation code. In the verification analyses, hydrodynamic motions are examined in the frequency domain for the floating type offshore platform according to the mooring lines. Both the hydrodynamic motions and dynamic loads are estimated for floating type offshore platforms equipped with the catenary type and taut mooring lines. A review and comparison are carried out for the numerically estimated results. The structural safety of the connection parts in an offshore structure such as a floating type offshore platform is one of the most important design criteria in view of fatigue life. The dynamic loads in the connecting area between a floating type offshore platform and its mooring lines are estimated in detail according to variations in the mechanical properties of the mooring lines. The dynamic tension load on the mooring lines is also estimated.

Dynamic Analysis of Topside Module in Lifting Installation Phase

  • Lee, Jong-Hyun
    • 한국해양공학회지
    • /
    • 제25권4호
    • /
    • pp.7-11
    • /
    • 2011
  • The installation phase for a topside module suggested can be divided into 9 stages, which include start, pre-lifting, lifting, lifted, rotating, positioning, lowering, mating, and end of installation. The transfer of the topside module from a transport barge to a crane vessel takes place in the first three stages, from start to lifting, while the transfer of the module onto a floating spar hull occurs in the last three stages, from lowering to the end. The coupled multi-body motions are calculated in both calm water and in irregular waves with significant wave height (1.52m), with suggested force equilibrium diagrams. The effects of the hydrodynamic interactions between the crane vessel and barge during the lifting stage have been considered. The internal forces caused by the load transfer and ballasting are derived for the lifting phases. The results of these internal forces for the calm water condition are compared with those in the irregular sea condition. Although the effect of pitch motion on the relative vertical motion between the deck of the floating structure and the topside module is significant in the lifting phases, the internal force induced pitch motion is too small to show its influence. However, the effect of the internal force on the wave-induced heave responses in the lifting phases is noticeable in the irregular sea condition because the transfer mass-induced draught changes in the floating structure are observed to have higher amplitudes than the external force induced responses.

Innovative Methodology for Assembling Jack up Leg of 205m on ground of Ultra

  • 양영태;심송섭;이승엽;황외주;신봉영
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2003년도 추계학술대회 논문집
    • /
    • pp.87-92
    • /
    • 2003
  • Generally, in jack up rig design for harsh environment, its leg height is a major factor for achieving a sufficient serviceability & operability in terms of the worst environment and the workable depth. Due to difficulties in constructing such a high-slender leg, inaccessibility of yard fabrication equipment, etc. the construction of Jack up rig fur harsh deep sea has not been common. Method using heavy crawler crane, fabrication tower or extension by the floating crane vessel is still conventional construction but, considering high cost fur mobilizing heavy lift vessel (HLV) or additional marine work for implementing preload / full height test at sea, the ground-base construction is much advantageous. Air skidding method (ASM hereafter) is ground-based construction methodology, newly developed due to such requests. ASM could also be extended to similar engineering fields. This paper presents the operating sequence, design parameters and procedure which were verified through successful operation at the end of May 2002.

  • PDF

Comparative evaluation of different offshore wind turbine installation vessels for Korean west-south wind farm

  • Ahn, Dang;Shin, Sung-chul;Kim, Soo-young;Kharoufi, Hicham;Kim, Hyun-cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제9권1호
    • /
    • pp.45-54
    • /
    • 2017
  • The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west-south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane ${\cdots}$ etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west-south wind farm.