Dynamic Analysis of Topside Module in Lifting Installation Phase  

Lee, Jong-Hyun (Offshore Wind Power Research Project Team, RIST)
Publication Information
Journal of Ocean Engineering and Technology / v.25, no.4, 2011 , pp. 7-11 More about this Journal
Abstract
The installation phase for a topside module suggested can be divided into 9 stages, which include start, pre-lifting, lifting, lifted, rotating, positioning, lowering, mating, and end of installation. The transfer of the topside module from a transport barge to a crane vessel takes place in the first three stages, from start to lifting, while the transfer of the module onto a floating spar hull occurs in the last three stages, from lowering to the end. The coupled multi-body motions are calculated in both calm water and in irregular waves with significant wave height (1.52m), with suggested force equilibrium diagrams. The effects of the hydrodynamic interactions between the crane vessel and barge during the lifting stage have been considered. The internal forces caused by the load transfer and ballasting are derived for the lifting phases. The results of these internal forces for the calm water condition are compared with those in the irregular sea condition. Although the effect of pitch motion on the relative vertical motion between the deck of the floating structure and the topside module is significant in the lifting phases, the internal force induced pitch motion is too small to show its influence. However, the effect of the internal force on the wave-induced heave responses in the lifting phases is noticeable in the irregular sea condition because the transfer mass-induced draught changes in the floating structure are observed to have higher amplitudes than the external force induced responses.
Keywords
Barge-crane coupled motion; Lifting analysis; Motion trajectory analysis; Force equilibrium diagram; Time domain motion analysis;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Schellin, T.E., Jiang, T. and Ostergaard, C. (1993). "Crane Ship Response to Wave Groups", Journal of Ship Research, Vol 37, No 3, Sept. 1993, pp 225-238.
2 Chan, H.S. (2003). "Global Wave Loads on Intact and Damaged Ro-Ro Ships in Regular Oblique Waves", Marine Structures 2003, Vol 16, No 4, 323-344.   DOI   ScienceOn
3 Choo, Y.S., Lim, C.K., and Bok, S.H. (1993). A Knowledgebased Approach to Design for Heavy Lift, Offshore 93, 3rd Intl Conf, Installation of Major Offshore Structures and Equipment, Feb., 1993, London, UK, ppr 8, pp 83-97.
4 Cveticanin L. (1995), "Dynamic Behavior of the Lifting Crane Mechanism", Mechanics Machine Theory, Vol 30, No 1, 1995, pp 141-151.   DOI   ScienceOn
5 Oortmerssen, G.van and Pinkster, J.A. (1976). "Computation of First and Second Order Wave Forces on Bodies Oscillation in Regular Waves", Proceedings 2nd International Conference Ship Hydrodynamics, Berkeley, 1976.