• 제목/요약/키워드: objective cost function

검색결과 464건 처리시간 0.019초

전원계측에서의 공급지장비와 자계비용의 해석적 추정에 관한 연구 (Analytic Outage Cost and Marginal Cost Evaluation in Generation Planning)

  • Bong-Yong Lee;Chung-Hoon Kim;Young-Moon Park
    • 대한전기학회논문지
    • /
    • 제32권2호
    • /
    • pp.33-42
    • /
    • 1983
  • Outage cost inclusion in operational simulation is very important subject in generation planning. Conventional discretized one in probabilistic simulation has unavoidably insufficient modeling and costly computation time. Now that the analytic operational simulation is possible, the outage cost inclusion is desired. With this inclusion the objective function of operational simulation becomes convex, so that analytic manipulation is easier. The derivation of outage cost is made in this paper, and the effects is evaluated. Further marginal cost is mentioned.

전시 최장 획득완료시간 최소화를 위한 복수 순회구매자 문제 (The Multiple Traveling Purchaser Problem for Minimizing the Maximal Acquisition Completion Time in Wartime)

  • 최명진;문우범;최진호
    • 한국군사과학기술학회지
    • /
    • 제14권3호
    • /
    • pp.458-466
    • /
    • 2011
  • In war time, minimizing the logistics response time for supporting military operations is strongly needed. In this paper, i propose the mathematical formulation for minimizing the maximal acquisition completion time in wartime or during a state of emergency. The main structure of this formulation is based on the traveling purchaser problem (TPP), which is a generalized form of the well-known traveling salesman problem (TSP). In the case of the general TPP, an objective function is to minimize the sum of the traveling cost and the purchase cost. However, in this study, the objective function is to minimize the traveling cost only. That's why it's more important to minimize the traveling cost (time or distance) than the purchase cost in wartime or in a state of emergency. I generate a specific instance and find out the optimal solution of this instance by using ILOG OPL STUDIO (CPLEX version 11.1).

면적강우량 산정을 위한 관측망 최적설계 연구 (Optimal Network Design for the Estimation of Areal Rainfall)

  • 이재형;유양규
    • 한국수자원학회논문집
    • /
    • 제35권2호
    • /
    • pp.187-194
    • /
    • 2002
  • 하천유역 면적강우량 산정의 정확도를 개선하기 위하여 기존 강우관측자료의 통계적 특성을 이용한 강우관측망의 최적설계방법을 연구하였다. 최적설계를 위한 목적함수는 면적강우량의 추정오차 및 지점강우량 관측비용의 항으로 구성하고, 그 값이 최소인 관측망은 선정하였다. 통계f7파의 추정방법으로는 통계적 분산 산정방법인 크리깅 모형을 채택하였다. 비용은 강우관측소의 설치비와 연간운영 비론 적용하고, 오차항과 비용항의 통합에는 등치매개변수를 이용하였다. 연구된 최적설계방법을 댐 신설로 강우관측소 증설이 필요한 용담댐 유역에 적용하여, 대상유역의 최적 강우관측망을 제안하였다.

마이크로그리드의 효율적 운영을 위한 최적화기법의 응용 (An Application of Optimization method for Efficient Operation of Micro Grid)

  • 김규호
    • 조명전기설비학회논문지
    • /
    • 제26권12호
    • /
    • pp.50-55
    • /
    • 2012
  • This paper presents an application of optimization method for efficient operation in micro grid. For operational efficiency, the objective function in a diesel generator consists of the fuel cost function similar to the cost functions used for the conventional fossil-fuel generating plants. The wind turbine generator is modeled by the characteristics of variable output. The cost function of fuel cell plant considers the efficiency of fuel cell. Particle swarm optimization(PSO) and sequential quadratic programming(SQP) are used for solving the problem of microgrid system operation. Also, from the results this paper presents the way to attend power markets which can buy and sell power from upper lever grids by connecting a various generation resources to micro grid.

ESGA를 이용한 불평형 배전계통의 커패시터 설치에 관한 연구 (A Study on Capacitor Placement Using ESGA Hybrid Approach in Unbalanced Distribution Systems)

  • 김규호;이유정;이상봉;유석구
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권6호
    • /
    • pp.316-324
    • /
    • 2003
  • This paper applied Elite-based Simplex-GA hybrid approach combined with Muptipop-GA (ESGA) to determining the location, size and number of capacitors to improve voltage profile and minimize power losses in unbalanced distribution systems. One of the main obstacles in applying GA to complex problems has been the high computational cost due to their slow convergence rate. To alleviate this difficulty, ESGA approach was developed that combines Elite-based Simplex-GA hybrid approach with Muptipop-GA. The objective function formulated consists of two terms: cost for energy losses and cost related to capacitor purchase and capacitor installation. The cost function associated with capacitor placement is considered as a step function due to banks of standard discrete capacities. Its efficiency was proved through the application in IEEE 13 bus and 34 bus test systems and was compared with several methods using GA.

다차원 유인부 계약의 운영구조 -성과유인의 구조화를 중심으로- (The Operating Structure of Multiple Incentive Contracts : Emphasis on Structuring with the Performance Incentives)

  • 김정본
    • 한국국방경영분석학회지
    • /
    • 제6권1호
    • /
    • pp.79-92
    • /
    • 1980
  • In cost-only incentive contract the emphasis is the attainment of efficient and effective cost control. In contrast multiple incentives contract correlates contractor's profit motives with the generalized government objective function, the decision variables of which are performance or quality (technical progress), time or schedule (timely development and delivery) and the cost (efficient and effective cost control) Under multiple incentive structure, it is essential to formulate the trade-off curves between cost and performance, which are called iso-fee curves. Trade-off curves depict the combination of cost and performance achievement for which the contractor will be rewarded with the same fee. The basic function of trade-off curves is to show he the contractor will be motivated by incentive arragement to trade off or sacrifice the achievement in one incentive element for the acnievment in another.

  • PDF

경제적인 아파트 설계에 대한 연구 (A Study on the Economical Design of Apartment House)

  • 강문영
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1995년도 봄 학술발표회 논문집
    • /
    • pp.378-384
    • /
    • 1995
  • This paper descrides on the economical design of apartment house. * The optimal problems are made by considering the objective function which minimize the construction cost of frame. * The object functions are taken as the codfficient equations of the cost function for a unit area. * Constraints are the design limits defined by the ultimate flexural strength, the ultimate shear strength. the minimum thickness, and the ratio of steel in accordance with ACI 318-89 Code. * Optimization is achieved by optimum nonlinear GINO(General interactive Optimizer)program. In design examples, it is compared with the optimum design results of apartment house and underground parking lot for structural systems.

  • PDF

"V-shape"를 이용한 흐름작업 일정계획 (Flow Shop Scheduling Problems By using Y-Shape Property)

  • 노인규;이정환
    • 산업경영시스템학회지
    • /
    • 제14권23호
    • /
    • pp.65-70
    • /
    • 1991
  • This paper is concerned with a flow-shop scheduling problem for all jobs having the common due date using V-Shape penalty cost function for earliness and lateness. The objective of the paper is to develop an efficient heuristic scheduling algorithm for minimizing total penalty cost function and for determining the optimal common due date. In addition, the between-job-delay for two machines are considered for developing the algorithm. A numerical example is given for illustrating the proposed algorithm.

  • PDF

비용요소를 고려한 자동차 차체조립라인의 설계 최적화 (Optimizing Design Problem in an Automotive Body Assembly Line Considering Cost Factors)

  • 이영훈;김동옥;백경민;신양우;문덕희
    • 한국시뮬레이션학회논문지
    • /
    • 제29권4호
    • /
    • pp.95-109
    • /
    • 2020
  • 이 논문에서는 자동차 차체 조립라인과 같은 제조시스템을 설계할 때, 설비투자비용과 같은 다양한 비용요소를 고려하여 최적 배치안을 결정하는 문제를 다룬다. 시스템의 성능 평가에 필요한 생산율 재공품 재고 수준을 추정하기 위해서는 시뮬레이션 실험 결과를 기반으로 하는 메타모델 방법론을 사용하였다. 최적화 문제의 목적함수는 목표생산율을 만족시키는 최소비용으로 정하였는데, 비용요소로는 로봇, 버퍼, 운송장비에 대한 투자비용을 고려하였고, 운영비용으로는 재공품 재고비용을 포함시켰다. 최적화 문제를 풀기 위해서는 하모니 탐색방법론을 사용하였다.

조기완료 및 납기지연 벌과금을 고려한 흐름작업 시스템의 일정계획 (A Study on Flow Shop Scheduling with Early & Tardy Penalty Cost)

  • 이정환
    • 산업경영시스템학회지
    • /
    • 제16권27호
    • /
    • pp.91-104
    • /
    • 1993
  • This paper is concerned with flow shop scheduling problems having the common due date. V-shape property is used for algorithms with early and tardy penalty cost. The objective of this paper is developing efficient heuristic scheduling algorithms for minimizing total penalty cost function and determining the optimal common due date. The between job delay and the work in process are considered for developing algorithms as penalty cost. Algorithms is simulated to analyze interrelated factors. A numerical example is given for illustrating the proposed algorithms.

  • PDF