• 제목/요약/키워드: next-generation high-speed train

검색결과 102건 처리시간 0.024초

다중하중조건에서 2층열차 차체의 최적설계 (Design Optimization of Double-deck Train Carbody Under Multi-loading Condition)

  • 이태희;이진민;정재준;황원주;김형진
    • 대한기계학회논문집A
    • /
    • 제30권11호
    • /
    • pp.1472-1478
    • /
    • 2006
  • Double-deck train has been attracted growing attention as next generation transportation around metropolis because of high passenger carrying capacity. To develop high-speed double-deck train with low operational costs, the carbody must be designed as light as possible. In addition, the carbody must be strong enough to ensure the safety of passengers. To meet these design requirements, we perform systematically weight minimization that determines thickness of aluminum extruded panels of the carbody. First, to reduce the design variables, we carry out the screening process that select sensitive or/and important design variables through design exploration. Then, weight minimization is accomplished under multi-loading condition such as vertical, compressive and torsional loads, while satisfying strength constraints of the design regulations. Finally, the result of design optimization is discussed by comparison with its initial design.

차세대 고속철도 특수교량의 설계 및 기술사양 조사 (Investigation of Design and Technical Specifications on Cable Supported Bridges for Next-Generation High-Speed Railways)

  • 박만호;문제우;김성일;홍성모;김종태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.206-213
    • /
    • 2008
  • Mo-Am arch bridge is only the long-span bridge (with 125m span) in the Kyong-Bu high-speed line in service, while other bridges are PSC box girder bridges and steel composite bridges with span lengths of $25\sim50m$. However, in foreign high-speed lines, special cable-supported bridges like cable-stayed bridges and extradosed bridges are being adopted in earnest with technical specifications. The cable supported bridge is recognized as one of the indices of technology in civil engineering field, and thus it is being adpoted with a sense of rivalry in countries with advanced technology in railway engineering. In this paper, to apply the top-level cable-supported bridge technology to the domestic high-speed line up to 400km/h by establishing the technical specifications on cable-supported bridges including span length, the requirements for securing the dynamic stability and running safety of high speed train are analyzed through case studies for domestic and foreign cases.

  • PDF

차세대 고속전철용 보조전원장치용 PWM 컨버터에 대한 연구 (A Study on PWM Converter of Auxiliary Power Block for Next Generation High Speed Train)

  • 정한정;차길로;이원철;원충연
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2008년도 춘계학술대회 논문집
    • /
    • pp.245-248
    • /
    • 2008
  • This paper gives a description of the mode'ling and control of a single phase PWM(Pulse Width Modulation) converter for HEMU-400X(High-speed Electric Multiple Unit - 400 km/h experiment). The converter is part of a Auxiliary power unit supplied by the 25[kV], 60[Hz] overhead line. A model of the converter in a synchronously rotating reference frame of coordinates is used to develop a new type of control. The control system has separate controllers for the active and reactive current, permitting the free choice of the power factor. This paper proposes a new control method of PWM converter for Auxiliary power unit.

  • PDF

ERTMS/ETCS의 TSI 절차에 관한 분석 (The analysis of TSI procedure in the ERTMS/ETCS)

  • 이상혁;김민석;정대영;고영환;이종우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.125-131
    • /
    • 2011
  • TSI(Technical Specification for Interoperability) is the highest technical specification in the Europe Railway and is composed by assessment items and essential requirements included by safety, reliability, availability, health, environment protection and technical compatibility. It is used on the research and development in the next generation railway technical. Currently, TSI procedures have been asked to bid for high speed rail business in Europe and Brazil. Also, all the railway systems such as infrastructure, signaling, electric and rolling stock system corresponding with standard of TSI procedures are exported and imported. Recently, Safety Critical System which has been studied on future railway R&D business in Korea is the state of the art train control system. And it is needed for system assessment of TSI procedures before system test and operation. In this paper, basic research is performed for analyzing TSI procedures suitable for the state of the art train control system in Korean railway.

  • PDF

차세대 고속열차 시험평가 프로세스에 관한 연구 (A Study on the Test and Evaluation Process Development for Korea Next Generation Highspeed Electric Multiple Unit)

  • 이태형;김상수;김석원;김기환;정흥채
    • 시스템엔지니어링학술지
    • /
    • 제7권2호
    • /
    • pp.7-11
    • /
    • 2011
  • A high-speed railway system represents a typical example of large-scale multi-disciplinary system, consisting of subsystems such as rolling-stock, electrical hardware, electronics, control, information, communication, civil technology etc. The system design and acquisition data of the large-scale system must be the subject under strict configuration control and management. Systems engineering technology development project for Korea next generation High-speed Electric Multiple Unit (HEMU) system in progress is a national large system development project that is not only a large-size and complex but also multi-disciplinary in nature. Therefore, all stakeholders must understand and share the functional and performance requirements of HEMU throughout its life-cycle phases. Also in the test and evaluation phase, all systems requirements must be verified. In 2011, the prototype train manufacturing will be completed. It will do test run on the commercial line and all systems requirements are verified until 2012. For the system verification, the test and evaluation process have to be established before the test trial run. Using a systems engineering tool, the system design database(SDD) with requirements traceability and development process management in the course of the development have to be established. This paper represents the test and evaluation process development based on the SEMP(Systems Engineering Management Plan) developed in the design stage. The test and evaluation process is refined and updated in comparison to the design stage one. The test and evaluation process consists of procedure, test and evaluation method and schedule. So through this process, it is defined that each systems requirements is verified on which test and about what time.

타행 시험을 이용한 고속열차 주행저항 평가 (Assessment of the Running Resistance of a High-speed Train Using a Coasting Test)

  • 권혁빈;김석원;오혁근
    • 한국철도학회논문집
    • /
    • 제17권3호
    • /
    • pp.165-170
    • /
    • 2014
  • 차세대 한국형 고속열차(HEMU-430X)의 주행저항을 타행속도 380km/h에 이르는 고속 타행을 포함한 총 12회의 타행시험 결과를 이용하여 평가하였다. 선형회귀법과 시간적분법의 두 가지 방법을 이용하여 각각 시간-속도 곡선 및 시간-거리 곡선으로부터 가속도를 계산하였으며, 각각의 구간에서 계산된 가속도를 바탕으로 시험 속도 대역에서 근사화된 주행저항식이 도출되었다. 이를 통해 공기역학적 형상 개선에 의해 주행저항이 15% 정도 감소하였고, 터널 주행 시에는 개활지 주행 시에 비하여 약 28%의 주행저항이 증가하는 것으로 평가되었다.

차세대 고속전철 주행에 따른 이선현상이 전력변환 상호간에 미치는 영향분석 (An analysis of mutual influence between power conversions caused by contact loss during traction of next generation high speed train)

  • 김재문;장진영;김양수;안정준;김연준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.10-12
    • /
    • 2009
  • Electromagnetic Interference(EMI) in electric railway operation has become increasingly important. The components within very high power electronic, and the circuits for treating low-level signals, comprise complex system that must coexist and be highly reliable. To study it, It were included how much the HEMU-400X generates EMI and it has an effect on the power conversion units which resulted from Power Line Disturbance (PLD) phenomenon by contact loss during its running. In this study, the dynamic characteristic of a contact wire and pantograph suppling electrical power to high-speed trains are investigated. The analysis of the loss of contact based on Power Simulator program software is performed to develop power line disturbance model suitable for high speed operation. It is confirmed that a contact wire and pantograph model are necessary for studying the dynamic behavior of the pantograph system.

  • PDF

차세대 고속전철 팬터그래프 팬 헤드의 압상력 변화 해석 (Analysis of Change of Contact Force in the Pantograph Pan Head of Next Generation High Speed Train)

  • 강형민;권혁빈
    • 한국유체기계학회 논문집
    • /
    • 제20권1호
    • /
    • pp.35-40
    • /
    • 2017
  • In order to investigate the change of contact force of pantograph pan head due to the change of aerodynamic force, three dimensional flow around the pan head were calculated. For this, the aerodynamic modeling of pan head of CX pantograph was performed and the standard deviation of the contact force of the simulation results were compared with those of the experimental results of wind tunnel tests. From the comparison, it was confirmed that the current grid system and the numerical methodologies can be utilized to calculate the aerodynamic characteristics of the pantograph pan head. By using these grid system and the methodologies, the standard deviations of the contact force of pan head were calculated with velocities as 200, 250, 300, 350, and 400 km/h. The maximum standard deviation of the aerodynamic contact force of pan head was 92 N at 400 km/h and statistical minimum contact force was more than 0 N. Therefore, it was confirmed that and the pan head of CX pantograph was statistically contacted with the catenary system with the train speed of 350 km/h though the aerodynamic contact force was changed.

차세대 고속철 통과 교량의 동적특성에 대한 수치해석 (Numerical Analysis for Dynamic Characteristics of Next-Generation High-Speed Railway Bridge)

  • 오순택;이동준;이성태;정병준
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제26권2호
    • /
    • pp.9-17
    • /
    • 2022
  • 차세대 고속철은 주행 속도가 점점 증가하므로 이를 반영한 고속철 차량 통과교량에 대한 새로운 주행 안정성의 평가가 요구된다. 이를 위하여 현재 공용 중인 경부 고속철 구간의 대표 교량형식인 PSC (Pre-stressed Concrete) 박스거더 교량을 대상으로 관성질량을 고려한 38-자유도 차량과 궤도 불규칙성과 상호 작용력을 반영하여 모형화하였으며, 고속철 차량 주행속도 별로 동적 수치해석을 수행하여 주행 안정성을 평가하였다. 수치해석을 통해 단순교와 2 경간 연속교의 최대 수직 변위와 DAF (Dynamic Amplification Factor; 동적확대계수)를 산출하여 동적 안정성 여부를 판단하였으며, 또한 주행 속도 별 최대 수직 변위를 추정하기 위한 3차 다항 회귀 분석식을 제안하였다. 대표적인 주행 속도와 횡 단면 위치 별 수직 변위 차이를 비교하고, 종 방향 최대 면틀림을 분석하였다. 또한, 고속철 차량의 교량통과 중 교량의 수직변위에 대한 가속도 영향선과 각 항목 간의 연관성을 분석하여 주행 안정성을 평가하였다.

차세대 고속열차(HEMU-400X)의 팬터그래프 시스템에 대한 공력특성 연구 (Experimental Studies on Aerodynamic Characteristics of Pantograph system for HEMU-400X)

  • 이영빈;노주현;곽민호;이재호;김규홍;이동호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.133-138
    • /
    • 2010
  • This paper describes on aerodynamic characteristics of pantograph system for Next generation high speed train(HEMU-400). The pantograph which supports electric power is located on the roof. Because of this, it generate high drag, severe acoustic noise and vibration which induced unstable flow due to complex configuration. Therefore, the design of high efficient pantograph needs to increase operational speed. In this research, wind tunnel tests were performed to design a high efficient pantograph system using 1/4 scaled model which were KTX-II pantograph, single arm pantograph and periscope type pantograph with square cylinder shape panhead and optimized shape panhead. For real operational condition, flow directions were adapted by rotation of pantograph. From this results of wind tunnel, it is checked that the pantograph with optimized panhead and single arm type or periscope type has better aerodynamic performance. In addition, lift control device and spoiler in pantograph were tested to investigate the validity of application.

  • PDF