• Title/Summary/Keyword: next-generation high-speed train

Search Result 102, Processing Time 0.023 seconds

Design Optimization of Double-deck Train Carbody Under Multi-loading Condition (다중하중조건에서 2층열차 차체의 최적설계)

  • Lee, Tae-Hee;Lee, Jin-Min;Jung, Jae-Jun;Hwang, Won-Ju;Kim, Hyeong-Jin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.30 no.11 s.254
    • /
    • pp.1472-1478
    • /
    • 2006
  • Double-deck train has been attracted growing attention as next generation transportation around metropolis because of high passenger carrying capacity. To develop high-speed double-deck train with low operational costs, the carbody must be designed as light as possible. In addition, the carbody must be strong enough to ensure the safety of passengers. To meet these design requirements, we perform systematically weight minimization that determines thickness of aluminum extruded panels of the carbody. First, to reduce the design variables, we carry out the screening process that select sensitive or/and important design variables through design exploration. Then, weight minimization is accomplished under multi-loading condition such as vertical, compressive and torsional loads, while satisfying strength constraints of the design regulations. Finally, the result of design optimization is discussed by comparison with its initial design.

Investigation of Design and Technical Specifications on Cable Supported Bridges for Next-Generation High-Speed Railways (차세대 고속철도 특수교량의 설계 및 기술사양 조사)

  • Park, Man-Ho;Mun, Je-U;Kim, Sung-Il;Hong, Seong-Mo;Kim, Jong-Tae
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.206-213
    • /
    • 2008
  • Mo-Am arch bridge is only the long-span bridge (with 125m span) in the Kyong-Bu high-speed line in service, while other bridges are PSC box girder bridges and steel composite bridges with span lengths of $25\sim50m$. However, in foreign high-speed lines, special cable-supported bridges like cable-stayed bridges and extradosed bridges are being adopted in earnest with technical specifications. The cable supported bridge is recognized as one of the indices of technology in civil engineering field, and thus it is being adpoted with a sense of rivalry in countries with advanced technology in railway engineering. In this paper, to apply the top-level cable-supported bridge technology to the domestic high-speed line up to 400km/h by establishing the technical specifications on cable-supported bridges including span length, the requirements for securing the dynamic stability and running safety of high speed train are analyzed through case studies for domestic and foreign cases.

  • PDF

A Study on PWM Converter of Auxiliary Power Block for Next Generation High Speed Train (차세대 고속전철용 보조전원장치용 PWM 컨버터에 대한 연구)

  • Jeong, Jeong-Han;Cha, Gil-Ro;Lee, Won-Cheol;Won, Chung-Yuen
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.245-248
    • /
    • 2008
  • This paper gives a description of the mode'ling and control of a single phase PWM(Pulse Width Modulation) converter for HEMU-400X(High-speed Electric Multiple Unit - 400 km/h experiment). The converter is part of a Auxiliary power unit supplied by the 25[kV], 60[Hz] overhead line. A model of the converter in a synchronously rotating reference frame of coordinates is used to develop a new type of control. The control system has separate controllers for the active and reactive current, permitting the free choice of the power factor. This paper proposes a new control method of PWM converter for Auxiliary power unit.

  • PDF

The analysis of TSI procedure in the ERTMS/ETCS (ERTMS/ETCS의 TSI 절차에 관한 분석)

  • Lee, Sang-Hyeok;Kim, Min-Seok;Jung, Dae-Young;Ko, Young-Hwan;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.125-131
    • /
    • 2011
  • TSI(Technical Specification for Interoperability) is the highest technical specification in the Europe Railway and is composed by assessment items and essential requirements included by safety, reliability, availability, health, environment protection and technical compatibility. It is used on the research and development in the next generation railway technical. Currently, TSI procedures have been asked to bid for high speed rail business in Europe and Brazil. Also, all the railway systems such as infrastructure, signaling, electric and rolling stock system corresponding with standard of TSI procedures are exported and imported. Recently, Safety Critical System which has been studied on future railway R&D business in Korea is the state of the art train control system. And it is needed for system assessment of TSI procedures before system test and operation. In this paper, basic research is performed for analyzing TSI procedures suitable for the state of the art train control system in Korean railway.

  • PDF

A Study on the Test and Evaluation Process Development for Korea Next Generation Highspeed Electric Multiple Unit (차세대 고속열차 시험평가 프로세스에 관한 연구)

  • Lee, Tae-Hyung;Kim, Sang-Soo;Kim, Seog-Won;Kim, Ki-Hwan;Chung, Heung-Chai
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.7-11
    • /
    • 2011
  • A high-speed railway system represents a typical example of large-scale multi-disciplinary system, consisting of subsystems such as rolling-stock, electrical hardware, electronics, control, information, communication, civil technology etc. The system design and acquisition data of the large-scale system must be the subject under strict configuration control and management. Systems engineering technology development project for Korea next generation High-speed Electric Multiple Unit (HEMU) system in progress is a national large system development project that is not only a large-size and complex but also multi-disciplinary in nature. Therefore, all stakeholders must understand and share the functional and performance requirements of HEMU throughout its life-cycle phases. Also in the test and evaluation phase, all systems requirements must be verified. In 2011, the prototype train manufacturing will be completed. It will do test run on the commercial line and all systems requirements are verified until 2012. For the system verification, the test and evaluation process have to be established before the test trial run. Using a systems engineering tool, the system design database(SDD) with requirements traceability and development process management in the course of the development have to be established. This paper represents the test and evaluation process development based on the SEMP(Systems Engineering Management Plan) developed in the design stage. The test and evaluation process is refined and updated in comparison to the design stage one. The test and evaluation process consists of procedure, test and evaluation method and schedule. So through this process, it is defined that each systems requirements is verified on which test and about what time.

Assessment of the Running Resistance of a High-speed Train Using a Coasting Test (타행 시험을 이용한 고속열차 주행저항 평가)

  • Kwon, Hyeok-Bin;Kim, Seogwon;Oh, Hyuck Keun
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.3
    • /
    • pp.165-170
    • /
    • 2014
  • The resistance to motion of the Korean next-generation high-speed train (HEUM-430X) was assessed on the basis of 12 coasting test runs at coasting speeds up to approximately 380km/h. Two different methods, a linear regression method and a time-integral method, were employed to calculate decelerations from the time-velocity data and the time-distance data, respectively, and an equation of resistance to motion was devised from the deceleration data calculated at each time section. The effect of an improvement of the aerodynamic shape on the resistance to motion was investigated, with the results showing that the running resistance was reduced by about 15% due to these improvements. An increase of approximately 28% of the running resistance was also noted when running in a tunnel relative to running through an open field.

An analysis of mutual influence between power conversions caused by contact loss during traction of next generation high speed train (차세대 고속전철 주행에 따른 이선현상이 전력변환 상호간에 미치는 영향분석)

  • Kim, Jae-Moon;Chang, Chin-Young;Kim, Yang-Soo;Ahn, Jeong-Joon;Kim, Yeon-Joon
    • Proceedings of the KIEE Conference
    • /
    • 2009.04a
    • /
    • pp.10-12
    • /
    • 2009
  • Electromagnetic Interference(EMI) in electric railway operation has become increasingly important. The components within very high power electronic, and the circuits for treating low-level signals, comprise complex system that must coexist and be highly reliable. To study it, It were included how much the HEMU-400X generates EMI and it has an effect on the power conversion units which resulted from Power Line Disturbance (PLD) phenomenon by contact loss during its running. In this study, the dynamic characteristic of a contact wire and pantograph suppling electrical power to high-speed trains are investigated. The analysis of the loss of contact based on Power Simulator program software is performed to develop power line disturbance model suitable for high speed operation. It is confirmed that a contact wire and pantograph model are necessary for studying the dynamic behavior of the pantograph system.

  • PDF

Analysis of Change of Contact Force in the Pantograph Pan Head of Next Generation High Speed Train (차세대 고속전철 팬터그래프 팬 헤드의 압상력 변화 해석)

  • Kang, Hyungmin;Kwon, Hyeok-bin
    • The KSFM Journal of Fluid Machinery
    • /
    • v.20 no.1
    • /
    • pp.35-40
    • /
    • 2017
  • In order to investigate the change of contact force of pantograph pan head due to the change of aerodynamic force, three dimensional flow around the pan head were calculated. For this, the aerodynamic modeling of pan head of CX pantograph was performed and the standard deviation of the contact force of the simulation results were compared with those of the experimental results of wind tunnel tests. From the comparison, it was confirmed that the current grid system and the numerical methodologies can be utilized to calculate the aerodynamic characteristics of the pantograph pan head. By using these grid system and the methodologies, the standard deviations of the contact force of pan head were calculated with velocities as 200, 250, 300, 350, and 400 km/h. The maximum standard deviation of the aerodynamic contact force of pan head was 92 N at 400 km/h and statistical minimum contact force was more than 0 N. Therefore, it was confirmed that and the pan head of CX pantograph was statistically contacted with the catenary system with the train speed of 350 km/h though the aerodynamic contact force was changed.

Numerical Analysis for Dynamic Characteristics of Next-Generation High-Speed Railway Bridge (차세대 고속철 통과 교량의 동적특성에 대한 수치해석)

  • Oh, Soon-Taek;Lee, Dong-Jun;Yi, Seong-Tae;Jeong, Byeong-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.2
    • /
    • pp.9-17
    • /
    • 2022
  • To take into account of the increasing speed of next generation high-speed trains, a new design code for the traffic safety of railway bridges is required. To solve dynamic responses of the bridge, this research offers a numerical analyses of PSC (Pre-stressed Concrete) box girder bridge, which is most representative of all the bridges on Gyungbu high-speed train line. This model takes into account of the inertial mass forces by the 38-degree-of-freedom and interaction forces as well as track irregularities. Our numerical analyses analyze the maximum vertical deflection and DAF (Dynamic Amplification Factor) between simple span and two-span continuous bridges to show the dynamic stability of the bridge. The third-order polynomial regression equations we use predict the maximum vertical deflections depending on varying running speeds of the train. We also compare the vertical deflections at several cross-sectional positions to check the influence of running speeds and the maximum irregularity at a longitudinal level. Moreover, our model analyzes the influence lines of vertical deflection accelerations of the bridge to evaluate traffic safety.

Experimental Studies on Aerodynamic Characteristics of Pantograph system for HEMU-400X (차세대 고속열차(HEMU-400X)의 팬터그래프 시스템에 대한 공력특성 연구)

  • Lee, Yeong-Bin;Rho, Joo-Hyun;Kwak, Min-Ho;Lee, Jae-Ho;Kim, Kyu-Hong;Lee, Dong-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.133-138
    • /
    • 2010
  • This paper describes on aerodynamic characteristics of pantograph system for Next generation high speed train(HEMU-400). The pantograph which supports electric power is located on the roof. Because of this, it generate high drag, severe acoustic noise and vibration which induced unstable flow due to complex configuration. Therefore, the design of high efficient pantograph needs to increase operational speed. In this research, wind tunnel tests were performed to design a high efficient pantograph system using 1/4 scaled model which were KTX-II pantograph, single arm pantograph and periscope type pantograph with square cylinder shape panhead and optimized shape panhead. For real operational condition, flow directions were adapted by rotation of pantograph. From this results of wind tunnel, it is checked that the pantograph with optimized panhead and single arm type or periscope type has better aerodynamic performance. In addition, lift control device and spoiler in pantograph were tested to investigate the validity of application.

  • PDF