• Title/Summary/Keyword: new road project

Search Result 108, Processing Time 0.022 seconds

A Strategy for Developing New Road Projects (경관도로 등 신개념의 도로사업 개발에 관한 연구)

  • Kim, Eung-Cheol
    • International Journal of Highway Engineering
    • /
    • v.9 no.2 s.32
    • /
    • pp.115-127
    • /
    • 2007
  • Developed countries, especially in road construction and management fields, introduce new road porjects such as National Scenic Byways Program(NSBP program) in USA and the Eco-road project in Japan. This study develops a conceptual model for deploying new road projects in Korea. The four step approach is suggested to create new road projects, including foundation of an act based on the existing Road Act, creation of new road project ideas, development of evaluation process and guidelines, and enhancement of an administrative scheme. To create new road projects, three different ways are devised; (1) designation of national roads having uniqueness in overall spectrum, (2) designation of roads having intrinsic values in a different aspect, (3) designation of single structures of engineering outcomes such as bridges, tunnels, new design techniques, considerable Value Engineering output, and well analyzed Life Cycle Cost Analysis practices. For the evaluation process, NSBP program of USA and/or Sustainable City Award program of Korea would be recommended. An administrative scheme and integrated funding process for the new road projects are also suggested based on evaluation of tasks of each team or division of Korea Ministry of Construction and Transportation.

  • PDF

Dynamic Sustainability Assessment of Road Projects

  • Kaira, Sneha;Mohamed, Sherif;Rahman, Anisur
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.493-502
    • /
    • 2020
  • Traditionally, road projects are initiated based on an assessment of their economic benefit, after which the environmental, social and governance effects are addressed discretely for the project according to a set of predetermined alternatives. Sustainable road infrastructure planning is vital as issues like diminishing access to road construction supplies, water scarcity, Greenhouse Gas emissions, road-related fatalities and congestion pricing etc., have imposed severe economic, social, and environmental damages to the society. In the process of addressing these sustainability factors in the operational phase of the project, the dynamics of these factors are generally ignored. This paper argues that effective delivery of sustainable roads should consider such dynamics and highlights how different aspects of sustainability have the potential to affect project sustainability. The paper initially presents the different sustainability-assessment tools that have been developed to determine the sustainability performance of road projects and discuss the inability of these tools to model the interrelationships among sustainability-related factors. The paper then argues the need for a new assessment framework that facilitates modelling these dynamics at the macro-level (system level) and helping policymakers for sustainable infrastructure planning through evaluating regulatory policies.

  • PDF

Impacts of Rural Road Project on the Social and Economic Activities of Community People (농어촌도로사업이 지역사회 주민의 사회.경제 활동에 미치는 영향)

  • Hong, Chan-Sun;Im, Sang-Bong;Huh, Yoo-Man
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.95-98
    • /
    • 2003
  • The objectives of the study are to analyze the impacts of rural road project on the social and economic activities of community people, offer basic data to perform evaluation of the project, and suggest future directions of the project. Research methodology adopted is a questionnaire method. There were interviewed 281 adult residents selected from 34 villages in Yeongdong-gun(mountainous), Miryang-si(middle), and Gochang-gun(plain). Results of the study are as follows: 1) Increase of income and land prices in mountainous and middle regions by the rural road project is higher than in plain; 2) Most inconvenient road expressed by the interviewee is the one linking farm and residence and 3) The problems of rural roads derived are narrowness, unpavement and partial pavement, unreliable maintenance, and long construction time. In order to meet the community needs on rural roads, it may be necessary that community people participate in the process of the project. And it is desirable to put priority on expanding and paving existing roads rather than constructing new one.

  • PDF

Introduction on the by-pass road construction for Siem Reap, Cambodia (캄보디아 시엠립 우회도로건설 사업 소개)

  • Roh, Han-Sung;Kim, Hyo-Bae
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.614-625
    • /
    • 2008
  • The project of Construction of Siem Reap bypass road in Cambodia consists of alignment improvement of existing route, extension of width of road and laterite paving. This project is carried out by fast-track method on the design and construction for bypass road of 15.2 km length and 8m width for five months. Though some difficulties for the construction works such as the location of borrow pit and rock source, rainy seasons etc, the construction could be completed successfully owing to the cooperation of related authorities, company and residents. This 2 way Angkor detouring road will function as industrial roads in Siemreap region. These new two roads will not only bring better logistics requirements and safety, but also impact to poverty alleviation and preservation the beauty of the ecological environment of Angkor region. The basic information related to geotechnical engineering of this project is introduced.

  • PDF

ESTIMATING COSTS DURING THE INITIAL STAGE OF CONCEPTUAL PLANNING FOR PUBLIC ROAD PROJECTS: CASE-BASED REASONING APPROACH

  • Seokjin Choi;Donghoon Yeo;Seung H. Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1183-1188
    • /
    • 2009
  • Estimating project costs during the early stage of conceptual planning is very important when deciding whether to approve the project and allocate an appropriate budget. However, due to greater uncertainties involved in a project, it is challenging to estimate costs during this initial stage within a reasonable tolerance. This paper attempts to develop a cost-estimate model for public road projects under these circumstances and limitations. In the conceptual planning stage of a road project, there is only limited information for cost estimation, for example, such input data as total length of the route, origin and destination, number of lanes, general geographic characteristics of the route, and other basic attributes. This implies that the model should individuate suitable but restricted information without considering detailed features such as quantity of earthwork and a detailed route of a given condition. With these limited facts, this paper applies a case-based reasoning (CBR) method to solve a new problem by deriving similar past problems, which in turn is used to estimate the cost of a given project based on best-fitted previous cases. To develop a CBR cost-estimate model, the authors classified 8 representative variables, including project type, the number of lanes, total length, road design grades, etc. Then, we developed the CBR model, primarily by using 180 actual cases of public road projects, procured over the last decade. With the CBR model, it was found that the degree of error in estimation can be reasonably reduced, to below approximately 30% compared to the final costs estimated upon the completion of detailed design.

  • PDF

In the middle of a perfect storm: political risks of the Belt and Road project at Kyaukphyu, Myanmar

  • Morris, David
    • Journal of Contemporary Eastern Asia
    • /
    • v.20 no.2
    • /
    • pp.210-236
    • /
    • 2021
  • China's Belt and Road Initiative infrastructure connectivity and other projects are presented in much of the discourse as a grand strategy to trap developing nations in debt, to exert asymmetric power and construct a new world economic order. The asymmetric relationship between China and Myanmar might therefore be expected to generate a range of political risks for stakeholders. Myanmar itself presents a "perfect storm" of problems, with dysfunctional governance, civil conflict, under-development and growing economic dependence on China. The Kyaukphyu port project and associated Special Economic Zone in Myanmar's troubled Rakhine state is investigated as a case study of risks on the Belt and Road. While worst case fears China might seize military control of the port appear unlikely, at least in current conditions, empirical observation indicates the complexity on the ground generates an array of other risks - as well as opportunities, should conditions allow. Further, despite challenges and constrained capacity, Myanmar governments have demonstrated agency, including by re-negotiating control and costs of the Kyaukphyu project. The case underlines that conditions are more complicated than simply China's asymmetric power. A sceptical approach is taken to normative discourses in order to build inductive understanding of how stakeholders and local experts perceive dynamics underway. A political risk approach is deployed to develop a framework to identify, analyse and assess risks for actors in relation to the Kyaukphyu project. The research findings are presented on an interim basis, given current constraints on field interviews due to the current crisis.

A Study on Road Safety Evaluation Method for Improvement Project of Two-Lane Road (2차로 시설개량 사업의 도로 안전성 평가방법 연구)

  • Shin, Chul-Ho;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.1
    • /
    • pp.105-114
    • /
    • 2019
  • Recently, the paradigm of road policy has been focused on user safety. Recently, the number of road facility improvement project has been continuously increased but the economic feasibility (B/C ratio) is insufficient. Therefore, it is necessary to select a reasonable road improvement project through accurate and objective analysis of the road safety evaluation. In this study, to develop a new road safety evaluation method, data were collected based on the current road safety evaluation method for 75 routes including national roads and provincial ones. Based on the collected data, problems were analyzed and utilized as the basic factors of the new road safety evaluation method. Therefore, in this study, traffic accidents were reflected as a general evaluation item by weighing to solve these problems, and the evaluation items were added from experiences and ideas of the local public officials. For each evaluation item, a reasonable weight was determined through AHP (Analytic Hierarchy Process) questionnaire evaluation with highway experts. In addition, the safety index was determined based on the evaluation criteria for each evaluation item. The criteria for evaluating the danger zone are determined by the overall safety index. Finally, the criteria for selection of road improvement projects based on the overall risk level were derived.

Acquisition of Evidential Information to Control Total Volume of Road Density per Tributary Watershed (도로밀도에 대한 소하천 유역 기반의 총량규제 기초자료 확보 방안)

  • Um, Jung-Sup
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.5
    • /
    • pp.317-335
    • /
    • 2005
  • This paper is primarily intended to propose a new concept of "aggregate control of road density" which is defined as the area-wide road surface per watershed area. An empirical study for experimental sites was conducted to confirm how a standard GIS technology can be used to assist in estimating the road density in terms of total volume threshold control. Guidelines for a replicable methodology are presented to provide a strong theoretical basis for the standardization of factors involved in the estimation of the road space threshold; the meaningful classification of road types, delination of watershed boundary, interpretation for distribution trends of road density etc. A variety of visual maps using overlay analysis can be generated over large areas quickly and easily to show the fact that some degree of road space already exists in the experimental sites. They could be used as an evidence to limit further construction of road network in comparison with other tributary watershed. It is anticipated that this research output could be used as a valuable reference to confirm the potential of introducing the new concept of "site specific road density" to support more scientific and objective decision-making in the process of road construction project.

The Procedure for Improving Structural Methodology or Information engineering Methodology (구조적 또는 정보공학 소프트웨어 개발 방법론 개선 절차)

  • Jung, Byung-Kwon;Yoon, Seok-Min
    • The KIPS Transactions:PartD
    • /
    • v.9D no.6
    • /
    • pp.1083-1090
    • /
    • 2002
  • The software development methodology has not caught up with the rapid change of information technology. Most of the software development projects use structural methodology or information engineering methodology. If established software development methodologies don't reflect technologies applied to the project, the project may be performed ineffectively. This paper describes a model in which we can apply a new information technology to an already existed structural methodology or information engineering methodology. This model uses the technique of the divide and conquer that software development life cycle is divided into phases, each phase is divided into viewpoint- areas and the software development processes of a new information technology are applied to each small area. By using the design phase this paper shows application example, in which I applied web-based development processes to CS@RoadMap Methodology of KCC Information & Communication, a system provider in Korea. The CS@RoadMap Methodology reflecting the Web technology, Web@RoadMap Methodology, has been applied to the public-domain projects.

Analysis on Performance Assessment Framework of Construction Phase for Road Construction Projects (도로건설사업 시공단계 성과평가 프레임워크 연구)

  • Mun, Junbu;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.801-809
    • /
    • 2023
  • Road construction projects have a long duration so cost overruns and schedule delays are occurred. However, performance assessment system that can manage and prepare for this in advance is insufficient. In addition, road construction are affected by many factors during under construction. Therefore it is necessary to conduct performance assessment considering the characteristics of roads and prepare for similar projects in the future. The purpose of this study is to provide a framework to evaluate construction phase performance and present a performance management plan using road construction information. Also, This study conducted time adjustment between the start and the finish of the project and developed performance metrics based on absolute and relative indicator. This study analyzed the cost, schedule, and changes of the road project construction process, showing the possibility of advancement of performance assessment and how to use it when planning new road construction projects.