• Title/Summary/Keyword: national project

Search Result 5,223, Processing Time 0.037 seconds

Plan of Sapti Community Garden-Park by Design Charrette

  • Lee, Kyoungjin;Sung, Junghan
    • Journal of recreation and landscape
    • /
    • v.12 no.4
    • /
    • pp.79-90
    • /
    • 2018
  • Yesan-gun was selected to receive a "Village Community Garden Project" in 2018 to foster a sense of community and improve the urban landscape by working with neighbors to create a happy living space for residents. Yesan-gun selected Sapti Park, located in Yesan-eup, as the project site. The project was carried out through the design charrette method (an intense period of collaborative creativity) to allow residents to propose and design park concepts themselves for the community garden construction project to ensure that that the park facilities would provide something for everyone to enjoy. This study followed the actual design project that actively introduced the design charrette in planning the community garden, describing the entire design process from planning to construction and revealing how the opinions of residents were projected onto the design drawings. The purpose of the project was to advance user-participation design methods by reviewing the progress of the design charrette process and to examine how storytelling, the act of conveying ideas through a fun and persuasive story, transformed the plans for the community garden.

A Japanese National Project for Superconductor Network Devices

  • Hidaka, M.
    • Progress in Superconductivity
    • /
    • v.5 no.1
    • /
    • pp.1-4
    • /
    • 2003
  • A five-year project for Nb-based single flux quantum (SFQ) circuits supported by Japan's Ministry of Economy Trade and Industry (METI) in Japan was started in September 2002. Since April 2003, the New Energy and Industrial Technology Development Organization (NEDO) has supported this Superconductor Network Device Project. The aim of the project is to improve the integration level of Nb-based SFQ circuits to several ten thousand Josephson junctions, in comparison with their starting integration level of only a few thousand junctions. Actual targets are a 20 GHz dual processor module for the servers and a 0.96 Tbps switch module for the routers. Starting in April 2003, the Nb project was merged with SFQ circuit research using a high-T$_{c}$ superconductor (HTS). The HTS research targets are a wide-band AD converter for mobile-phone base stations and a sampling oscilloscope for wide-band waveform measurements.

  • PDF

Stochastic Scheduling for Repetitive Construction Projects

  • Lee, Hong-Chul;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.166-168
    • /
    • 2015
  • Line of Balance (LOB) method is suitable to schedule construction projects composed of repetitive activities. Since existing LOB based repetitive project scheduling methods are deterministic, they do not lend themselves to handle uncertainties involved in repetitive construction process. Indeed, existing LOB scheduling dose not handle variability of project performance indicators. In order to bridge the gap between reality and estimation, this study provides a stochastic LOB based scheduling method that allows schedulers for effectively dealing with the uncertainties of a construction project performance. The proposed method retrieves an appropriate probability distribution function (PDF) concerning project completion times, and determines favorable start times of activities. A case study is demonstrated to verify and validate the capability of the proposed method in a repetitive construction project planning.

  • PDF

Study on the Tuning of PEFP DTL

  • Kim, Han-Sung;Kwon, Hyeok-Jung;Seol, Kyung-Tae;Cho, Yong-Sub;Hwang, Yong-Suk
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 2005.05a
    • /
    • pp.1060-1061
    • /
    • 2005
  • PDF

Gastrin-releasing peptide promotes the migration of vascular smooth muscle cells through upregulation of matrix metalloproteinase-2 and -9

  • Park, Hyun-Joo;Kim, Mi-Kyoung;Kim, Yeon;Bae, Sun Sik;Kim, Hyung Joon;Bae, Soo-Kyung;Bae, Moon-Kyoung
    • BMB Reports
    • /
    • v.50 no.12
    • /
    • pp.628-633
    • /
    • 2017
  • Gastrin-releasing peptide (GRP) has been reported to be implicated in the pathogenesis of inflammatory disorders. The migration and proliferation of vascular smooth muscle cells (VSMCs) are key components of vascular inflammation that leads to the development of atherosclerosis. The present study aimed to investigate the molecular effect of GRP on VSMC proliferation and migration. We report that GRP significantly enhanced the proliferation and migration of rat VSMCs. GRP increased mRNA and protein expression of matrix metalloproteinase-2 and -9 (MMP-2/9) in VSMCs. The induction of MMP-2/9 by GRP was regulated by the activation of the signal transducer and activator of transcription-3 (STAT3). In addition, STAT3-knockdown of VSMCs by siRNA or blockade of the GRP receptor inhibited GRP-induced migration of VSMCs. Taken together, our findings indicate that GRP promotes the migration of VSMCs through upregulation of MMP-2/9 via STAT3 activation.

Quantitative Effect Evaluation and Spatial Autocorrelation Analysis of Rural Development Projects (농촌개발사업 효과의 정량적 평가 및 공간적 연관 분석)

  • Lee, Jimin;Bae, Yeonjoung;Kim, Taegon;Lee, JeongJae;Suh, Kyo
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.2
    • /
    • pp.107-120
    • /
    • 2013
  • A lot of rural development projects have been planned and implemented for revitalizing rural areas in South Korea. However, it is not easy to properly evaluate and quantitatively analyze project outcomes. For this reason only selected regions have been evaluated for rural projects by government agencies. In this study, we analyzed the purpose and the contents of the Rural Village Development Project (RVDP) and Green Tourism Village Project (GTVP) to find indicators for evaluating results of rural projects using logistic regression analysis. Outputs of this study show that RVDPs increase regional population and GTVPs positively affect the sales of agricultural products. We also estimated the spatial distribution of project effects through spatial autocorrelation analysis and local-spatial autocorrelation analysis. Results show that the Moran's I values for the proportion of farmers with avocational jobs, product sales changes, and population growth in Jeol-La province are positive and the biggest one is population growth. Especially, key areas of agricultural product sales are widely distributed.

Parameter Impact Applied Case-based Reasoning Cost Estimation

  • Joseph Ahn;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Sooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.475-478
    • /
    • 2013
  • To carry out a one-off construction project successfully, effective and accurate early cost estimation is crucial, especially during the conceptual stage where very limited minimum information of construction project is given. As the level of accuracy of the early cost estimation has huge impacts on precise budgeting and cost management of a project, in other words, reducing the risk of a project, cost must be managed with special awareness. In an effort to improve the estimate accuracy of cost during the conceptual stage, this research introduces a Parameter Impact (PI) which can quantify weights of parameters and rank them; and PI development derived from the principle of impulse in physics is explicated. For a case study, 76 public apartment building cases in Korea are analyzed. To examine the validity of the proposed PI, a validation in terms of CBR applicability test and estimate accuracy comparisons using 10-nearest neighbor cases are carried out. The validation results support that the suggested PI can be applied in quantifying the weights of the parameters and CBR method for early cost estimation.

  • PDF

A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management (프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례)

  • Jung, Ha-Sung;Lee, Dong-Wha;Lee, Min-Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.3
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

Development of an Elaborated Project-Based Learning Model for the Scientifically Gifted

  • KIM, Hyekyung;CHOI, Seungkyu
    • Educational Technology International
    • /
    • v.11 no.1
    • /
    • pp.171-192
    • /
    • 2010
  • This study was to investigate the elaborated project based learning model for scientifically gifted in the context of R & E project learning. It is important for the scientifically gifted to provide the appropriate learning environments instead of general learning model for the gifted. Although R & E project learning model is effective, the model has the limitations of managing the course for the scientifically gifted. To improve R & E learning model, the elaborated project based learning model was suggested with integration of both project based learning model and goal based scenario. The elaborated project-based learning model was comprised with 'basic learning process', 'elaboration through inquiry', and 'presentation and reflection'. To measure the satisfaction, eighty scientifically gifted students participated in the class. The result shows that learners were satisfied with the elaborated project-based learning up to 90%, and teachers were satisfied with this model up to 77%.