• 제목/요약/키워드: multi-span bridge

검색결과 153건 처리시간 0.02초

지진과 세굴의 복합적인 영향을 받는 연속교의 동적거동분석 (Dynamic Analysis of Multi-Span Continuous Bridges under Combined Effects of Earthquake and Local Scour)

  • 김상효;마호성;이상우;심정욱
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.166-173
    • /
    • 2002
  • Seismic bridge failure due to the combined effects of earthquake and local scour are examined in probabilistic perspectives. The seismic responses of multi-span continuous bridge with deep foundations are evaluated with a simplified mechanical model. The probabilistic local scour depths around the deep foundations are estimated by using the Monte Carlo simulation. From the simulation results, it is found that seismic responses of a bridge slightly increase due to the local scour effect. The effect of local scour on the global motion of the continuous bridge is found to be significant under weak seismic intensity. In addition, the duration to regain its original foundation stiffness is critical in estimating the probability of foundation failure under earthquake. Therefore, the duration in recovering the foundation stiffness should be determined reasonably and the safely of the whole bridge system should be evaluated by considering the scour effect.

  • PDF

Optimal variables of TMDs for multi-mode buffeting control of long-span bridges

  • Chen, S.R.;Cai, C.S.;Gu, M.;Chang, C.C.
    • Wind and Structures
    • /
    • 제6권5호
    • /
    • pp.387-402
    • /
    • 2003
  • In the past decades, much effort has been made towards the study of single-mode-based vibration controls with dynamic energy absorbers such as single or multiple Tuned Mass Dampers(TMDs). With the increase of bridge span length and the tendency of the bridge cross-section being more slender and streamlined, multi-mode coupled vibrations as well as their controls have become very important for large bridges susceptible to strong winds. As a simple but effective device, the TMD system especially the semi-active one has become a promising option for such coupled vibration controls. However, despite various studies of optimal controls of single-mode-based vibrations with TMDs, research on the corresponding controls of the multi-mode coupled vibrations is very rare so far. For the development of a semi-active control strategy to suppress the multi-mode coupled vibrations, a comprehensive parametric analysis on the optimal variables of this control is substantial. In the present study, a multi-mode control strategy named "three-row" TMD system is discussed and the general numerical equations are developed at first. Then a parametric study on the optimal control variables for the "three-row" TMD system is conducted for a prototype Humen Suspension Bridge, through which some useful information and a better understanding of the optimal control variables to suppress the coupled vibrations are obtained. This information lays a foundation for the design of semi-active control.

가동받침 마찰을 고려한 다경간 연속교의 내진 해석 (Seismic Analysis of the Multi-Span Continuous Bridge Considering the Friction of the Expansion Bearings)

  • 전귀현
    • 대한토목학회논문집
    • /
    • 제14권1호
    • /
    • pp.63-70
    • /
    • 1994
  • 본 연구에서는 다경간 연속교의 내진해석시 가동받침의 마찰을 고려할 수 있는 비선형 동적해석 방법을 제시하고 가동받침의 마찰계수에 따른 연속교의 내진응답을 고찰하였다. 연구결과 국내와 같은 소규모 설계지진시에는 가동받침의 마찰은 마찰계수가 작더라도 에너지 감쇠에 의한 상부구조의 변위감소와 마찰력에 의한 상부구조의 관성력의 각 하부구조로 분배에있어 상당한 효과가 있음을 알 수 있었다. 또한 이러한 가동받침의 마찰효과는 마찰계수가 클수록, 입력지진의 규모가 작을수록 커짐을 보였다. 따라서 경간수가 많고 상부구조의 중량이 큰 다경간 연속교에 있어서 가동반침의 마찰계수를 적절히 사용함으로써 중소규모 설계지진 작용시 상부구조의 수평변위를 조절할 수 있고 상부구조의 교축방향 관성력을 각 하부구조로 분배하는 효과에 의해 경제성과 전체교량의 내진 안전성을 확보할 수 있다.

  • PDF

Reasonably completed state assessment of the self-anchored hybrid cable-stayed suspension bridge: An analytical algorithm

  • Kai Wang;Wen-ming Zhang;Jie Chen;Zhe-hong Zhang
    • Structural Engineering and Mechanics
    • /
    • 제90권2호
    • /
    • pp.159-175
    • /
    • 2024
  • In order to solve the problem of calculating the reasonable completed bridge state of a self-anchored hybrid cable-stayed suspension bridge (SA-HCSB), this paper proposes an analytical method. This method simplifies the main beam into a continuous beam with multi-point rigid supports and solves the support reaction forces. According to the segmented catenary theory, it simultaneously solves the horizontal forces of the main span main cables and the stay cables and iteratively calculates the equilibrium force system on the main beam in the collaborative system bridge state while completing the shape finding of the main span main cable and stay cables. Then, the horizontal forces of the side span main cables and stay cables are obtained based on the balance of horizontal forces on the bridge towers, and the shape finding of the side spans are completed according to the segmented catenary theory. Next, the difference between the support reaction forces of the continuous beam with multiple rigid supports obtained from the initial and final iterations is used to calculate the load of ballast on the side span main beam. Finally, the axial forces and strains of each segment of the main beam and bridge tower are obtained based on the loads applied by the main cable and stay cables on the main beam and bridge tower, thereby obtaining analytical data for the bridge in the reasonable completed state. In this paper, the rationality and effectiveness of this analytical method are verified through a case study of a SA-HCSB with a main span of 720m in finite element analysis. At the same time, it is also verified that the equilibrium force of the main beam under the reasonably completed bridge state can be obtained through iterative calculation. The analytical algorithm in this paper has clear physical significance, strong applicability, and high accuracy of calculation results, enriching the shape-finding method of this bridge type.

Mode identifiability of a multi-span cable-stayed bridge utilizing stabilization diagram and singular values

  • Goi, Y.;Kim, C.W.
    • Smart Structures and Systems
    • /
    • 제17권3호
    • /
    • pp.391-411
    • /
    • 2016
  • This study investigates the mode identifiability of a multi-span cable-stayed bridge in terms of a benchmark study using stabilization diagrams of a system model identified using stochastic subspace identification (SSI). Cumulative contribution ratios (CCRs) estimated from singular values of system models under different wind conditions were also considered. Observations revealed that wind speed might influence the mode identifiability of a specific mode of a cable-stayed bridge. Moreover the cumulative contribution ratio showed that the time histories monitored during strong winds, such as those of a typhoon, can be modeled with less system order than under weak winds. The blind data Acc 1 and Acc 2 were categorized as data obtained under a typhoon. Blind data Acc 3 and Acc 4 were categorized as data obtained under wind conditions of critical wind speeds around 7.5 m/s. Finally, blind data Acc 5 and Acc 6 were categorized as data measured under weak wind conditions.

The characteristics of the multi-span suspension bridge with double main cables in the vertical plane

  • Zhang, Li-Wen;Xiao, Ru-Cheng;Jiang, Yang;Chai, Sheng-Bo
    • Structural Engineering and Mechanics
    • /
    • 제42권3호
    • /
    • pp.291-311
    • /
    • 2012
  • The multi-span suspension bridge having double main cables in the vertical plane is investigated regarding endurance of live load distribution in the case of non-displaced pylon and pylon displacement. The coefficient formula of live load distribution described as the ratio of live load on the bottom cable to the top cable is obtained. Based on this formula, some function in respect of this bridge are derived and used to analyze its characteristics. This analysis targets the cable force, the cable sag and the horizontal displacement at the pylon top under live load etc. The results clarified that the performance of the live load distribution and the horizontal force of cables in the case of non-deformed pylon has a similar tendency to those in the case of deformed pylon, and the increase of pylon rigidity can increase live load distributed to the bottom cable and slightly raise the cable horizontal force under live load. However, effect on the vertical rigidity of bridge and the horizontal force increment of cables caused by live load is different in the case of non-deformed pylon and deformed pylon.

미 중부 및 동남부 지역의 다경간 교량의 지진응답 (Seismic Response of Multiple Span Steel Bridges in the Central and Southeastern United States)

  • Choi, Eunsoo
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.427-439
    • /
    • 2003
  • A previous study evaluated the seismic response of typical multi-span simply supported (MSSS) and multi-span continuous (MSC) steel-girder bridges in the central and southeastern United States. The results showed that the bridges were vulnerable to damage resulting from impact between decks, and large ductility demands on nonductile columns. Furthermore, fixed and expansion bearings were likely to fail during strong ground motion. In this paper, several retrofit measures to improve the seismic performance of typical multi-span simply supported and multi-span continuous steel girder bridges are evaluated, including the use of elastomeric bearings, lead-rubber bearings, and restrainer cables. It is determined that lead-rubber bearings are the most effective retrofit measure for reducing the seismic vulnerability of typical bridges. While isolation provided by elastomeric bearings limits the forces into the columns, the added flexibility results in pounding between decks in the MSSS steel-girder bridge. Restrainer cables, which are becoming a common retrofit measure, are only moderately effective in reducing the seismic vulnerability of MSSS and MSC steel girder bridges.

  • PDF

장대교량의 거동분석을 위한 GPS 모니터링시스템 개발에 관한 연구 (Development of GPS Monitoring System for Behavior Analysis of Long Span Bridge)

  • 최병길;조광희;나영우
    • 대한공간정보학회지
    • /
    • 제16권3호
    • /
    • pp.111-117
    • /
    • 2008
  • 본 연구의 목적은 다수의 GPS 센서를 이용하여 장대교량의 거동을 실시간으로 모니터링 하여 분석 할 수 있는 시스템을 개발하는데 있다. 다수의 GPS 센서를 장대교량의 주요 지점에 설치하고 변위를 실시간으로 측정하여 전체적인 거동을 분석한다. 본 연구에서 개발한 거동분석시스템은 교량의 전체적, 지점별 변위정보를 수치화, 시각화하고 이벤트에 대해 능동적인 대응이 가능하며 측정데이터의 DB화를 통해서 거동분석에 관계된 통계정보를 산출할 수 있다.

  • PDF

Interaction analysis of Continuous Slab Track (CST) on long-span continuous high-speed rail bridges

  • Dai, Gonglian;Ge, Hao;Liu, Wenshuo;Chen, Y. Frank
    • Structural Engineering and Mechanics
    • /
    • 제63권6호
    • /
    • pp.713-723
    • /
    • 2017
  • As a new type of ballastless track, longitudinal continuous slab track (CST) has been widely used in China. It can partly isolate the interaction between the ballastless track and the bridge and thus the rail expansion device would be unnecessary. Compared with the traditional track, CST is composed of multi layers of continuous structures and various connecting components. In order to investigate the performance of CST on a long-span bridge, the spatial finite element model considering each layer of the CST structure, connecting components, bridge, and subgrade is established and verified according to the theory of beam-rail interaction. The nonlinear resistance of materials between multilayer track structures is measured by experiments, while the temperature gradients of the bridge and CST are based on the long-term measured data. This study compares the force distribution rules of ballasted track and CST as respectively applied to a long span bridge. The effects of different damage conditions on CST structures are also discussed. The results show that the additional rail stress is small and the CST structure has a high safety factor under the measured temperature load. The rail expansion device can be cancelled when CST is adopted on the long span bridge. Beam end rotation caused by temperature gradient and vertical load will have a significant effect on the rail stress of CST. The additional flexure stress should be considered with the additional expansion stress simultaneously when the rail stress of CST requires to be checked. Both the maximum sliding friction coefficient of sliding layer and cracking condition of concrete plate should be considered to decide the arrangement of connecting components and the ultimate expansion span of the bridge when adopting CST.