• 제목/요약/키워드: multi-echelon

검색결과 72건 처리시간 0.026초

생산 능력 제한이 존재하는 다단계 공급망을 위한 Look-ahead 기반의 분배계획 (Look-ahead Based Distribution Planning for Capacitated Multi-stage Supply Chains)

  • 노주석;권익현;김성식
    • 대한안전경영과학회지
    • /
    • 제8권5호
    • /
    • pp.139-150
    • /
    • 2006
  • The aim of this study is to establish an efficient distribution planning for a capacitated multi-stage supply chain. We assume that the demand information during planning horizon is given a deterministic form using a certain forecasting method. Under such a condition, we present a cost effective heuristic method for minimizing chain-wide supply chain inventory cost that is the sum of holding and backorder costs by using look-ahead technique. We cope with the capacity restriction constraints through look-ahead technique that considers not only the current demand information but also future demand information. To evaluate performance of the proposed heuristic method, we compared it with the extant research that utilizes echelon stock concept, under various supply chain settings.

동일수준 조달을 고려한 다단계 분배시스템 운영에 관한 연구 (A Study on the Operation of Multi-Echelon Distribution System with Supply the Same Level.)

  • 이내형
    • 한국컴퓨터정보학회논문지
    • /
    • 제6권4호
    • /
    • pp.163-167
    • /
    • 2001
  • 물적분배시스템의 운영에 있어서 발생하는 품절에 대한 대처방법으로서 동일단계의 측면 재공급 허용을 통한 시스템 운영방안을 제안함으로써 최적물류비용을 갖는 물적분배시스템을 설계하였으며, 또한 본 연구의 고려 대상인 중앙분배센터와 지역분배센터 사이의 수송비용관계, 지역분배센터 상호간 보충허용 하의 물적분배시스템 운영에 관한 연구를 통하여 다중공급원 알고리즘을 개발하고, 기존의 단일 공급원 가정하의 분배시스템과의 총운용비용에 대한 비교분석을 통하여 본 연구에서 개발된 알고리즘의 효율성을 입증하고, 또한 수치 예를 통하여 본 연구의 타당성을 검토하였다.

  • PDF

유한 가동 능력을 고려한 IMES(지능형 다단물류 시스템)을 위한 최적 알고리듬 (An Optimal Algorithm for the IMES (Intelligent Multi-Echelon Systems) with Finite Operating Capacity)

  • 김태영
    • 산업경영시스템학회지
    • /
    • 제34권4호
    • /
    • pp.98-105
    • /
    • 2011
  • 수리가능 제품은 가격 비싸고 중요성이 크면서 새 제품을 구매하기 어려운 부품을 의미하며, 항공기 또는 선박의 엔진 등을 들 수 있다. 수리가능 제품에 대하여 고장이 발생할 경우 가용성을 유지하기 위하여 즉지 교체하여야 하고, 교체된 부품은 수리에 들어가야 한다. 이러한 문제에 대한 통제 시스템은 시스템의 효율성을 결정하는 중요한 요소이기 때문에, 다양한 시스템 구성에 대하여 많은 연구가 이루어져 왔다. 본 연구에서는 우선 중앙 수리기지와 여러 지역 수리기지를 대상으로 하고 있으며, 물류량의 변화에 따라 중앙 수리기지와 지역 수리기지 간의 효과적인 운영 방안을 고려하고 있다. 각 지역 수리기지는 수리 운영 능력이 제한되어 있는 것으로 가정하고 있으며, 한정된 수의 여분의 제품을 유지하고 있다. 중앙 수리기지는 여분을 제품을 보유하거나 유지하지 않고 오직 수리 작업만을 수행하고 있다. 유한 가동에 대한 효율적인 알고리즘은 이러한 상황에 대하여 운영 능력의 한계를 고려하면서 효율성을 최대화하기 위하여 개발되었다. 지역 수리기지에서는 제품의 고장이 발생하는 속도와 현재 보유한 제품 수량에 따라 효율성이 바뀌고, 시스템이 보유할 수 있는 재고량과 수리할 수 있는 능력의 한계가 제한되어 있다. 대기행렬이론에 기반하여 고장율과 수리율에 의한 비용 함수를 정의하고, 최적해를 구할 수 있는 IMES(지능형 다단물류 시스템)을 개발하였다. 총 예상 재고량에 의한 재고 비용과 품절 비용을 최소화함으로써 최적의 보유 재고수량을 찾아내고 실제로 사용자가 활용할 수 있는 시간 내에 해를 구할 수 있는 효율성을 갖춘 알고리듬을 개발하였다. 본 연구의 목적은 전체 시스템의 총비용을 최소화하는 것이며, 예제를 통하여 알고리듬을 묘사하고 수치예제를 통한 실험을 실시하여 제안 알고리듬이 정확하고 효율적임을 보였다. 제안된 알고리즘에 의하여 매우 정확하고 효율적인 계산 결과를 얻을 수 있었으며, 이 방법을 통해 신속하고 정확하게 많은 문제를 해결할 수 있을 것으로 생각된다.

An integrated system for synthesis of plant-wide control structure

  • Choi, In-Seok;Yoon, En-Sup
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1990년도 한국자동제어학술회의논문집(국제학술편); KOEX, Seoul; 26-27 Oct. 1990
    • /
    • pp.1265-1270
    • /
    • 1990
  • A prototype integrated system and its theories for distributed SISO control structure synthesis of complete chemical plants is developed. The scope of this work includes control structure synthesis not only of simple units with unspecified control loops but also of the complex process at preliminary and basic design stage. Hierarchical approach and dual-decomposition strategy (that is multi-layer decomposition and multi-echelon decomposition) is applied to this system. Because automatic control structure synthesis of complex plants is a problem defined as a series of knowledge-intensive tasks within multiple spaces, the established methodology is complemented by not only techniques from knowledge-based expert systems but also shortcut and rigorous control theories. This system is used for education of control designers, process engineers, operators and students as well as for operability studying, in-line and on-line process control structure synthesis.

  • PDF

일반거리산정방법을 이용한 다-물류센터의 최적 수송경로 계획 모델 (A Vehicle Routing Model for Multi-Supply Centers Based on Lp-Distance)

  • 황흥석
    • 산업공학
    • /
    • 제11권1호
    • /
    • pp.85-95
    • /
    • 1998
  • This study is focussed on an optimal vehicle routing model for multi-supply centers in two-echelon logistic system. The aim of this study is to deliver goods for demand sites with optimal decision. This study investigated an integrated model using step-by-step approach based on relationship that exists between the inventory allocation and vehicle routing with restricted amount of inventory and transportations such as the capability of supply centers, vehicle capacity and transportation parameters. Three sub-models are developed: 1) sector-clustering model, 2) a vehicle-routing model based on clustering and a heuristic algorithm, and 3) a vehicle route scheduling model using TSP-solver based on genetic and branch-and-bound algorithm. Also, we have developed computer programs for each sub-models and user interface with visualization for major inputs and outputs. The application and superior performance of the proposed model are demonstrated by several sample runs for the inventory-allocation and vehicle routing problems.

  • PDF

물류개선을 위한 DRP시스템에 관한 연구 - 복수공급원이 있는 물류시스템을 중심으로- (A Study on DRP System for Logistics Improvement - A Case of a Multi-sourcing Logistics System)

  • 장융남
    • 경영과학
    • /
    • 제11권1호
    • /
    • pp.73-90
    • /
    • 1994
  • Recently the recongnition of Logistics becomes important to enterpries as a means for improving their competition, but the Korea enterpries falls for far behind in management techniques for analyzing realities and problems in the Logistics compare to the advanced countries. Especially the function of inventory control which is most undeveloped in them should be improved in Korea. Inventory is very important in Logistics, but there exists trade-off between inventory level and customer in the service level. It is difficult to coordinate both the reduction in the inventory level and the enhancement in the service level. Its effective technique is a DRP system. In general, it deals with arborescent distribution network in which a given channel member has a single source of supply. This article aims to present a DRP system, and more a DRP system which is flexible and responsive in the multisourcing, multi-echelon distribution network. Related research issues are discussed. Finally, using a DRP system on logistics and the management performance. So we can help the physical distribution improvement of the Korean enterprises.

  • PDF

가용도 제약하에 시뮬레이션과 메타 휴리스틱을 이용한 MIME 시스템의 수리수준 및 수리부속 할당 동시 최적화 (Simultaneous Optimization of Level of Repair and Spare Parts Allocation for MIME Systems under Availability Constraint with Simulation and a Meta-heuristic)

  • 정일한;윤원영;김호균
    • 경영과학
    • /
    • 제26권1호
    • /
    • pp.209-223
    • /
    • 2009
  • In this paper, an analysis problem of repair levels and spare part allocation for MIME(Multi indenture multi echelon) systems is studied using simulation and meta-heuristics. We suggest a method to determine simultaneously repair levels and spare parts allocation to minimize the life cycle cost of MIME system under availability constraint. A simulated annealing method is used to analyze the repair levels and genetic algorithm is used to obtain the optimal allocation of spare parts. We also develop a simulation system to calculate the life cycle cost and system availability. Some numerical examples are also studied.

지역분배센터의 고객수요분할을 통한 다단계 분배체계 재구축에 관한 연구 (A Study on the Reconstruction of Multi-Echelon Distribution System by the Customer Demand Decomposition of Regional Distribution Center)

  • 최진영
    • 산업경영시스템학회지
    • /
    • 제20권44호
    • /
    • pp.61-68
    • /
    • 1997
  • The algorithm of customer demand decomposition suggested by this study is a reconstruction method of distribution network under the allowance of same level supply. Regional distribution center(RDC) distributes additional inventories of some of the supplying items to retailers under its charge to reduce the time needed for emergency delivery to neighborhood retailer where backlog happened. This also restrict the purpose of the inventories held by RDC as only regular supply. All of which leads to the creation of more realistic method allowing the affiliation of closing related RDC with one in the vicinity. In this study, the role of RDC is restricted only as supplying items regularity and the conruction of distribution system processing through the closing by consideration of the possibility of supplying retailers from the RDC in the vicinity is discussed.

  • PDF

철도 시스템 가용성능 시뮬레이션 개념 모형 (Conceptual Simulation Model for Evaluating Availability of Railway System)

  • 김종운;김희욱;온정근;권태수;정도식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1241-1245
    • /
    • 2011
  • High RAM performance and efficient operation plan and maintenance equipment and policies are needed for improving the system availability performance such as punctuality and schedule adherence while reducing life cycle cost. Because railway systems are repairable, complex and have multi-echelon maintenance support structure, it is much complicated to set RAM performance targets and operation and maintenance plan. It is not easy to solve these problem by mathematical method and simulation can be consider for them. This article suggests the conceptual simulation model for analysing availability of railway system which has complex system structure and operation/maintenance environment.

  • PDF

다단계 수리체계의 성능평가를 위한 폐쇄형 대기행렬 네트워크 모형 (A Closed Queueing Network Model for the Performance Evaluation of the Multi-Echelon Repair System)

  • 박찬우;김창곤;이효성
    • 한국경영과학회지
    • /
    • 제25권4호
    • /
    • pp.27-44
    • /
    • 2000
  • In this study we consider a spares provisioning problem for repairable items in which a parts inventory system is incorporated. If a machine fails, a replacement part must be obtained at the parts inventory system before the failed machine enters the repair center. The inventory policy adopted at the parts inventory system is the (S, Q) policy. Operating times of the machine before failure, ordering lead times and repair times are assumed to follow a two-stage Coxian distribution. For this system, we develop an approximation method to obtain the performance measures such as steady state probabilities of the number of machines at each station and the probability that a part will wait at the parts inventory system. For the analysis of the proposed system, we model the system as a closed queueing network and analyze it using a product-form approximation method. A recursive technique as well as an iterative procedure is used to analyze the sub-network. Numerical tests show that the approximation method provides fairly good estimation of the performance measures of interest.

  • PDF