• Title/Summary/Keyword: minimum-cost

Search Result 1,410, Processing Time 0.026 seconds

Optimum Life Cycle Cost Design of Steel Box Girder Bridges (강상형교의 최적 Life Cycle Cost 설계)

  • 조효남;민대홍;김구선
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1998.10a
    • /
    • pp.151-158
    • /
    • 1998
  • This paper presents an optimal decision model for minimizing the life-cycle cost of steel box girder bridges. The point is that it takes into account service life process as a whole, and the life-cycle costs include initial (design, testing, and construction) costs, maintenance costs and expected failure costs. The problem is formulated as that of minimization of expected total life-cycle cost with respect to the design variables. The optimal solution identifies those values of the decision variables that result in minimum expected total cost. The performance constraints in the form of flexural failure and shear failure are those specified in the design code. Based on extensive numerical investigations, it may be positively stated that the optimum design of steel box girder bridges based on life-cycle cost approach proposed in this study provides a lot more rational and economical design, and thus the proposed approach will propose the development of new concepts and design methodologies that may have important implications in the next generation performance-based design codes and standards.

  • PDF

Optimal Seismic Reliability of Bridges Based on Minimum Expected Life Cycle Costs (최소기대비용에 기초한 교량의 최적내진신뢰성)

  • 조효남;임종권;심성택
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.10a
    • /
    • pp.249-256
    • /
    • 1999
  • This study is intended to propose a systematic procedure for the development of the reliability-based seismic safety and cost-effective Performance criteria for design and upgrading of long span PC bridges. In the paper, a set of cost function models for life cycle cost analysis of bridges is proposed. The total life cycle cost functions consist of initial cost and direct/indirect damage costs considering repair/replacement costs, human losses and property damage costs, road user costs, and indirect regional economic losses. The damage costs are successfully expressed in terms of Park-Ang median global damage indices and damage probabilities. The proposed approach is successfully applied to model bridges in both regions of a moderate seismicity area like Seoul, Korea and a high one like Tokyo, Japan. It may be expected that the proposed approach can be effectively utilized for the development of cost-effective performance criteria for design and upgrading of various types of bridges as well as long span PC bridges.

  • PDF

MODELLING AFRICAN TRYPANOSOMIASIS IN HUMAN WITH OPTIMAL CONTROL AND COST-EFFECTIVENESS ANALYSIS

  • GERVAS, HAMENYIMANA EMANUEL;HUGO, ALFRED K.
    • Journal of applied mathematics & informatics
    • /
    • v.39 no.5_6
    • /
    • pp.895-918
    • /
    • 2021
  • Human African Trypanosomiasis (HAT) also known as sleeping sickness, is a neglected tropical vector borne disease caused by trypanosome protozoa transmitted by bites of infected tsetse fly. The basic reproduction number, R0 derived using the next generation matrix method which shows that the disease persists in the population if the value of R0 > 1. The numerical simulations of optimal control model carried out to determine the control strategy that can combat HAT under the minimum cost. The results indicate that, the use of both education campaign, treatment and insecticides are more efficient and effective to eliminate HAT in African community but too costly. Furthermore, the cost-effectiveness of the control measures (education campaign, treatment and insecticides) were determined using incremental cost-effectiveness ratio (ICER) approach and the results show that, the use of education and treatment of infected people as the best cost effective strategy compared to other strategies.

Preventive Maintenance Scheduling Guide

  • Park, Kyung-S.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.1 no.1
    • /
    • pp.93-98
    • /
    • 1975
  • This paper presents a generalized model for determining minimum cost preventive maintenance schedules where accurate failure data are not available except the "average"(mean) and the "typical" value(mode) of the component lifetime.

  • PDF

Optimal Relocating of Compensators for Real-Reactive Power Management in Distributed Systems

  • Chintam, Jagadeeswar Reddy;Geetha, V.;Mary, D.
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.6
    • /
    • pp.2145-2157
    • /
    • 2018
  • Congestion Management (CM) is an attractive research area in the electrical power transmission with the power compensation abilities. Reconfiguration and the Flexible Alternating Current Transmission Systems (FACTS) devices utilization relieve the congestion in transmission lines. The lack of optimal power (real and reactive) usage with the better transfer capability and minimum cost is still challenging issue in the CM. The prediction of suitable place for the energy resources to control the power flow is the major requirement for power handling scenario. This paper proposes the novel optimization principle to select the best location for the energy resources to achieve the real-reactive power compensation. The parameters estimation and the selection of values with the best fitness through the Symmetrical Distance Travelling Optimization (SDTO) algorithm establishes the proper controlling of optimal power flow in the transmission lines. The modified fitness function formulation based on the bus parameters, index estimation correspond to the optimal reactive power usage enhances the power transfer capability with the minimum cost. The comparative analysis between the proposed method with the existing power management techniques regarding the parameters of power loss, cost value, load power and energy loss confirms the effectiveness of proposed work in the distributed renewable energy systems.

The Processing Method of Nearest Neighbor Queries Considering a Circular Location Property of Object (객체의 순환적 위치속성을 고려한 최대근접질의의 처리방법)

  • Seon, Hwi-Joon
    • Journal of Korea Spatial Information System Society
    • /
    • v.11 no.4
    • /
    • pp.85-88
    • /
    • 2009
  • In multimedia database systems, the nearest neighbor Query occurs frequently and requires the processing cost higher than other spatial Queries do. It needs the measurement of search distance that the number of searched nodes and the computation time in an index can be minimized for optimizing the cost of processing the nearest neighbor query. The circular location property of objects is considered to accurately select the nodes which will be searched in the nearest neighbor query. In this paper, we propose the processing method of nearest neighbor queries be considered a circular location property of object where the search space consists of a circular domain and show its characteristics. The proposed method uses the circular minimum distance and the circular optimal distance, the search measurement for optimizing the processing cost of nearest neighbor queries.

  • PDF

A Study on Transmission System Expansion Planning using Fuzzy Branch and Bound Method

  • Park, Jaeseok;Sungrok Kang;Kim, Hongsik;Seungpil Moon;Lee, Soonyoung;Roy Billinton
    • KIEE International Transactions on Power Engineering
    • /
    • v.2A no.3
    • /
    • pp.121-128
    • /
    • 2002
  • This study proposes a new method for transmission system expansion planning using fuzzy integer programming. It presents stepwise cost characteristics analysis which is a practical condition of an actual system. A branch and bound method which includes the network flow method and the maximum flow - minimum cut set theorem has been used in order to carry out the stepwise cost characteristics analysis. Uncertainties of the permissibility of the construction cost and the lenient reserve rate and load forecasting of expansion planning have been included and also processed using the fuzzy set theory in this study. In order to carry out the latter analysis, the solving procedure is illustrated in detail by the branch and bound method which includes the network flow method and maximum flow-minimum cut set theorem. Finally, case studies on the 21- bus test system show that the algorithm proposed is efficiently applicable to the practical expansion planning of transmission systems in the future.

A Study on the Transmission System Expansion Planning using Fuzzy Integer Programming (Fuzzy 정수계획법을 이용한 송전망의 확충계획에 관한 연구)

  • Kim, Hong-Sik;Moon, Seung-Pil;Lee, Young-Jin;Choi, Hyong-Lim;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.350-353
    • /
    • 2001
  • This study proposes a new method for the transmission system expansion planning using the fuzzy integer programming. It presents stepwise cost characteristics analysis which is a practical condition of an actual systems. A branch and bound method which includes the network flow method and the maximum flow-minimum cut set theorem has been used in order to proceed the stepwise cost characteristics analysis. Uncertainties of the permission of the construction cost and not strict reserve rate and load forecasting of expansion planning have been included and also processed using fuzzy set theory in this study. In order to proceed the latter analysis, the solving procedure is illustrated in detail by branch and bound method which includes the network flow method and maximum flow-minimum cut set theorem. Finally, case studies on 21-bus test system show that the algorithm proposed is efficiently applicable to the practical expansion planning of transmission systems in future.

  • PDF

Optimum Dosage of Fenton's Reagent for the Dyeing Wastewater by the Different Conditions of Biological Treatment as the Pre-treatment Process (염색폐수의 생물학적 전처리 조건변화에 의한 최적 펜톤시약 투입량 결정에 관한 연구)

  • Bea Joan-Sam;Lee Sang-Ho
    • Journal of Environmental Science International
    • /
    • v.14 no.7
    • /
    • pp.683-689
    • /
    • 2005
  • The consecutive combination process of a biological process as the pre-treatment and a chemical process as the post-treatment is applied for the dyeing wastewater. The poor efficiency of biological treatment using pure oxygen makes the chemical treatment cost high. It is necessary to improve the efficiency of biological treatment in order to reduce the cost of chemical treatment. The purpose of this paper is to find the minimum dose of chemical reagent to fit the Discharged Water Quality Standards for the different biological treatment effluents. Results revealed that the minimum dosage of Fenton's reagent lead to save the cost of chemical treatment based on the guideline dose in the treatment plant. The possible maximum saving reagents was up to $70\%$ for the effluent of the pilot plant packed with the carrier imbedded microorganisms which were selected from the present treatment plant.

CO2 emissions optimization of reinforced concrete ribbed slab by hybrid metaheuristic optimization algorithm (IDEACO)

  • Shima Bijari;Mojtaba Sheikhi Azqandi
    • Advances in Computational Design
    • /
    • v.8 no.4
    • /
    • pp.295-307
    • /
    • 2023
  • This paper presents an optimization of the reinforced concrete ribbed slab in terms of minimum CO2 emissions and an economic justification of the final optimal design. The design variables are six geometry variables including the slab thickness, the ribs spacing, the rib width at the lower and toper end, the depth of the rib and the bar diameter of the reinforcement, and the seventh variable defines the concrete strength. The objective function is considered to be the minimum amount of carbon dioxide gas (CO2) emission and at the same time, the optimal design is economical. Seven significant design constraints of American Concrete Institute's Standard were considered. A robust metaheuristic optimization method called improved dolphin echolocation and ant colony optimization (IDEACO) has been used to obtain the best possible answer. At optimal design, the three most important sources of CO2 emissions include concrete, steel reinforcement, and formwork that the contribution of them are 63.72, 32.17, and 4.11 percent respectively. Formwork, concrete, steel reinforcement, and CO2 are the four most important sources of cost with contributions of 67.56, 19.49, 12.44, and 0.51 percent respectively. Results obtained by IDEACO show that cost and CO2 emissions are closely related, so the presented method is a practical solution that was able to reduce the cost and CO2 emissions simultaneously.