• Title/Summary/Keyword: military construction

Search Result 358, Processing Time 0.027 seconds

Extending Plans of the Role of ROK Navy vis-'a-vis the Expansion of Maritime Security Threats (해양안보위협의 확산에 따른 한국해군의 역할 확대방안)

  • Kil, Byung-ok
    • Strategy21
    • /
    • s.30
    • /
    • pp.63-98
    • /
    • 2012
  • Northeast Asia has a multi-layered security structure within which major economic and military powers both confront one another and cooperate at the same time. Major regional powers maintain mutually cooperative activities in the economic sphere while competing one another in order to secure a dominant position in the politico-military arena. The multifarious threats, posed by the North Korea's nuclear development, territorial disputes, and maritime demarcation line issues demonstrate that Northeast Asia suffers more from military conflicts and strifes than any other region in the world. Specifically, major maritime security threats include North Korea's nuclear proliferation and missile launching problems as well as military provocations nearby the Northern Limit Line(NLL) as witnessed in the Cheonan naval ship and Yeonpyong incidents. The ROK Navy has been supplementing its firm military readiness posture in consideration of North Korea's threats on the NLL. It has performed superb roles in defending the nation and establishing the Navy advanced and best picked. It also has been conducive to defend the nation from external military threats and invasion, secure the sea lanes of communications, and establish regional stability and world peace. In order to effectively cope with the strategic environment and future warfares, the ROK Navy needs to shift its military structure to one that is more information and technology intensive. In addition, it should consolidate the ROK-US alliance and extend military cooperative measures with neighboring countries in the Asia-Pacific region. Evolved steadily for the last 60 years, the ROK-US alliance format has contributed to peace and security on the Korean peninsula and in the Northeast Asian region. In conclusion, this manuscript contends that the ROK Navy should strive for the establishment of the following: (1) Construction of Jeju Naval Base; (2) Strategic Navy Equipped with War Deterrence Capabilities; (3) Korean-type of System of Systems; (4) Structure, Budget and Human Resources of the Naval Forces Similar to the Advanced Countries; and (5) Strategic Maritime Alliance and Alignment System as well as Domestic Governance Network for the Naval Families.

  • PDF

Field Application of Land Mine Crater using HPFRCC and ERCO (HPFRCC 및 ERCO를 활용한 지뢰매설호 현장적용)

  • Lee, Jea-Hyeon;Lee, Jong-Tae;Jung, Ung-Seon;Jo, Sung-Jun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.90-91
    • /
    • 2017
  • Military camps deal with various types of explosives. For instance, military engineering unit conducts education and training for laying landmines. However, in case of land mine craters installed with regular-level RC, structural safety may be in danger thus there is a necessity to utilize High Performance Fiber-Reinforced Cement Composites (HPFRCC), which has high functionality in protection and blast resistance. Therefore, in this research we conducted an field application of land mine crater of HPFRCC, using the existing optimal fiber mixing ratio and ERCO addition ratio.

  • PDF

Client/server system construction and practical guidelines for the configuration of the client/server system (클라이언트/서버 구조에 기반한 시스템 구축과 시스템 구축시 고려사항)

  • 김유정
    • Journal of the military operations research society of Korea
    • /
    • v.22 no.1
    • /
    • pp.1-17
    • /
    • 1996
  • In this paper, a client/server architecture and design concerns deduced from a real system design are described. The MIS system carried on IDIS is the one to be described. The experience from the system design is listed up and analized also. It is common to see that a distributed computing environment has much more complex structure than a conventional centralized one. As a consequence, a distributed system design is a complex task. It is worth to note that there should be sufficient considerations which had not been though ever for a centralized system. The objectives of this paper is to list up these problems and the solutions from experiences on a real system construction.

  • PDF

(An Effective Way to Construction the Highest Interworkable Virtual Network) (최상위 상호작용을 위한 효과적인 가상 네트워크 구축방법)

  • 석진원;이태공
    • Journal of the military operations research society of Korea
    • /
    • v.23 no.1
    • /
    • pp.100-114
    • /
    • 1997
  • The network for proving information exchange function in distributed system is interconnected among other networks which are in the state of independent construction and operation. However, due to various network protocols and distributed applications, Problems occurred in the area of network interconnectivity and interoperability of distributed applications in internetworking which should provide a good interoperability. This paper proposed an improved method for finding route which has the highest interworkability between end-systems using the interrelationship of network protocol. An algorithm and method of constructing a virtual network which is suitable for required distributed application are also proposed in this research.

  • PDF

The Design, Construction and Flight of Human Powered Aircraft Sky Runner (인력비행기 스카이 러너 설계.제작.비행)

  • Lee, Ki-Young;Choy, Seoung-Ok;Oh, Jang-Geun
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.4
    • /
    • pp.534-541
    • /
    • 2010
  • With the financial sponsorship of FKI and six other companies, the design and construction of the human powered aircraft Sky Runner has been begun to design in December of 2008. And it flew in late December of 2009. The original design configuration was continuously modified in response to test results as a 30.36m span, $35.25m^2$ wing area, 26.0 aspect ratio and 39.8kg of empty weight. Although, we have made only 150m flight flying a few seconds so far however, it will contribute to the research of ultra-light and long duration flying planes. A brief review of some design features, wing layout, prop design, fabrication and flight test results are presented.

Optimal Allocation Heuristic Method of Military Engineering Equipments during Artillery Position Construction Operation (휴리스틱 기법을 이용한 포병진지 구축작전시 공병장비 최적배정)

  • Park, Se Hwan;Lee, Moon Gul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.1
    • /
    • pp.11-21
    • /
    • 2017
  • Artillery fire power due to effectiveness which is hard to predict well-planned and surprising attack can give a fear and shock to the personnel and is a very core weapon system and takes a critical role in wartime. Therefore in order to maximize operational effectiveness, Army required protecting artillery and takes a quick attack action through rapid construction of artillery's positions. The artillery use artillery's position to prevent exposure by moving to other position frequently. They have to move and construct at new artillery's positions quickly against exposing existed place by foe's recognition. These positions should be built by not manpower but engineering construction equipment. Because artillery positions have to protect human and artillery equipment well and build quickly. Military engineering battalion have lots of construction equipment which include excavator, loader, dozer, combat multi-purposed excavator, armored combat earthmover dump truck and so on. So they have to decide to optimal number of Team combining these equipments and determine construction sequence of artillery's position in operational plan. In this research, we propose to decide number of Team efficiently and allocate required construction's positions for each Team under constraints of limited equipments and time. To do so, we develop efficient heuristic method which can give near optimal solution and be applied to various situation including commander's intention, artillery position's priority or grouping etc. This heuristic can support quick and flexible construction plan of artillery positions not only for using various composition's equipment to organize Teams but also for changing quantity of positions.

Evaluation on South and North Korean Military Power by Military Officers (남북 군사력 우열에 대한 군간부들의 인식 평가)

  • Lee Sang-Jin
    • Survey Research
    • /
    • v.7 no.1
    • /
    • pp.29-53
    • /
    • 2006
  • This paper analyzes which of the military sub-fields has an effect on a soldier's evaluation of South and North Korean military power. There are three objectives of this paper. First, it is to analyze whether the South is superior to the North in the overall military power and military sub -fields, without the presence of the US armed forces in South Korea. Second, it is to assess which of the military sub-fields influences the overall evaluation of military power through a regression analysis. Finally, it is to look at whether the professional soldiers have a motivational bias, due to an argument that the military personnel tend to exaggerate the inferiority of their own military power to get more budget for defense construction. Research in 2002 and 2003 tell us that South Korean military power is slightly inferior to North Korea's. However, research in 2005 shows that military power of South and North Korea is almost equal. The sub-fields in which South Korea is superior are in the order of War Sustainability, Information Warfare, Air Force, and Navy. North Korea is regarded to be superior in the fields of Atomic Biological Chemical Warfare Capability, Special Force, Reserve Mobilization, and Army. The higher ranked soldiers tend to evaluate that the North is superior to the South.

  • PDF

A Study on the Application of Defense IoT for the Implementation of Common Service in the Army, Navy, and Air Force (전군 공통 서비스 구현을 위한 국방 IoT 적용방향 연구)

  • Bae, Young-Min
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.3
    • /
    • pp.31-39
    • /
    • 2022
  • The Army, Navy, and Air Force are currently making various efforts to apply defense IoT technology by reflecting the characteristics of each military. However, there are concerns that comprehensive collection, management, and analysis may be limited because each military has no overlapping system or guaranteed interoperability of data, and there are inefficient aspects in terms of using and investing a limited defense budget. In this study, evaluation items and priorities for pilot projects were selected by applying Delphi technique and AHP method to determine which projects are preferentially effective when commonly applied in terms of Army, Navy, and Air force. As a result of the analysis, the project basis and driving force, project feasibility, performance and ripple effect, redundancy and connection were identified in the order of IoT-based small detachment units and unmanned base construction, intelligent smart unit, smart ground ammunition depot, and smart training management system. According to the comprehensive results reflecting the weights of each evaluation item, the fact that small detachment units and unmanned base construction project are recognized as the first project to be applied to the Army, Navy, and Air Force is a valid approach to be effective while each military is burdened with personnel management because of the reduction of manpower. Through the research results, it is expected that the direction of application to the policy of the defense IoT project can be confirmed in terms of efficient use of limited budgets.

Performance Comparison of Heuristics for Weapon-Target Assignment Problem with Transitivity Rules in Weapon's Kill Probability (무장 할당문제에서 휴리스틱 방법 효율성 비교: 이행성 규칙이 성립하는 무장성능차이를 중심으로)

  • Yim, Dong-Soon;Choi, Bong-Wan
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.3
    • /
    • pp.29-42
    • /
    • 2010
  • In this study, the weapon-target assignment problem arising in military application of operations research is considered. We reformulated the problem in order to simplify the solution methods based on genetic algorithms and heuristics. Since the problem is well known as NP-complete and cannot be solved in polynomial time, such solution methods have been widely used to obtain good solutions. Two chromosome representations--target number representation and permutation representation--in genetic algorithm are compared. In addition, a construction heuristic and three improving heuristics are developed. Several experiments under the condition of transitivity rules in weapon's kill probability have been accomplished. It shows that the construction heuristic and exchange-based improving heuristic guarantees good solutions within a second and the performance of construction heuristic is sensitive to transitivity rules.

Comparison of Predicted Maintenance Costs and Actual Maintenance Cost of Military Facilities - Focused on BTL Project - (병영 시설물 수선유지비용 예산대비 실투입 비교에 관한 연구 - BTL사업 중심으로 -)

  • Lee, Don-Soo;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.473-481
    • /
    • 2017
  • With the barracks modernization project, the Ministry of National Defense has been operating 60 projects of the 75 that have been announced. It was difficult to investigate and analyze the data in the past because data could not be obtained while it was much easier to do that since data can be obtained from private companies. With the aim of increasing the usability of the facilities, the objective of this study is to present a reasonable alternative for repair and maintenance costs by investigating and analyzing the budget and the actual expenses of repair and maintenance of military facilities for the past 3 to 5 years, and then identifying the problems with these. To accomplish this, a theoretical review of previous studies and legal grounds related to repair and maintenance costs was performed, and data on the estimates and the actual expenses data used in BTL projects carried out by private companies were analyzed. First, one of the problems was that there are some items omitted, including consumables, and these items should be included in order to secure their budget. Second, in terms of the items for divided payments, two improvements had been presented: a short-term payment plan for the operation period of 3 to 5 years and a long-term payment plan for an additional and complemented period other than the operation period. The repair and maintenance costs should be further studied at the point of time in a future when the actual data on the costs and operation period of military facilities can be secured. This study is expected to serve as empirical data that will form the basis for a reasonable calculation of the construction cost for military facilities.