1 |
Choi, J.H., Kim, D.H., Kim, S.H., and Kim, S.K., Factors Affecting Selection and Combination of Earthwork Equipment, Korea Journal of Construction Engineering and Management, 2010, Vol. 10, No. 1, pp. 201-205.
|
2 |
Dileep, R.S., Industrial Scheduling, PWS Publishing Company, 1997.
|
3 |
Hong, S.P., Management Science, second ed., Yul-Gok, 2010.
|
4 |
Jang, Y.C., Study of optimum allocation in military engineering equipment for effective artillery position development operation, [Master's Thesis], Korean National Defense University, 2016.
|
5 |
Jung, I.H., Optimization of redundancy allocation in multilevel system considering alternative units, Journal of the Korea Society for Quality Management, 2015, Vol. 43, No. 1, pp. 31-42.
DOI
|
6 |
Kang, Y.H., Lee, H.C., and Kim, S.S., Scheduling Jobs with different Due-Date on Nonidentical Parallel Machine, Journal of Korean Institute of Industrial Engineers, 1998, Vol. 24, No. 1, pp. 37-50.
|
7 |
Kim, D.C., Unrelated Parallel Machine Scheduling for PCB Manufacturing, Journal of the Society of Korea Industrial and Systems Engineering, 2004, Vol. 27, No. 4, pp. 141-146.
|
8 |
Kim, D.H. and Lee, Y.H., The Heuristic Algorithm for The fire target allocation and sequencing problem, Journal of Korean Academic Society of Busin ess Administration, 2010, Vol. 25, No. 1, pp. 47-63.
|
9 |
Kim, Y.K., Metaheuristic, Young-Ji, 1997.
|
10 |
Moon, J.H. and Lee, S.H., Study on vehicle routing problem of artillery position construction for survivability support, Journal of Korean Institute of Industrial Engineers, 2011, Vol. 37, No. 3, pp. 171-179.
DOI
|
11 |
ROK Army Training Doctrine Command, Data of Engineering Field(34-0-2), Korea Military printing Institution, 2013.
|
12 |
Ronald, L.R., Optimization in Operations Research, PrenticeHall, 1997.
|
13 |
Shah, R.K., A New Approach for Automation of Location-based Earthwork Scheduling in Road Construction Projects, Automation in Construction, 2014, Vol. 43, No. 2, pp. 156-169.
DOI
|
14 |
Won, S.K., Kim, S.K., and Han, C.H., A Combination Model of Earthwork equipment using System Dynamics, Korea Journal of Construction Engineering and Management, 2007, Vol. 8, No. 2, pp. 194-202.
|