• 제목/요약/키워드: material requirement plan

검색결과 13건 처리시간 0.036초

트리 구조의 BOM(Bill of Material)에 기초한 고성능 MRP(Material Requirement Planning) 시스템 (High performance MRP(Material Requirement Planning) system based on tree-structured BOM(Bill of Material))

  • 나홍범;이형곤;박진우
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2006년도 춘계학술대회 논문집
    • /
    • pp.601-602
    • /
    • 2006
  • The primary role of MRP(Material Requirement Planning) is to make a production plan so that we have an exact quantity of right materials on needed time at right place. But the ignorance on capacity constraints makes some problems whenever production schedule is established. To increase the performance of MRP system, a novel approach which is based on new input data structure is suggested. The new input data structure includes all the information about Material BOM, Routing and resource data so that we can easily examine the usage of resources and generate higher performance production plans.

  • PDF

Web기반을 활용한 자재 조달 시스템 개선방안 (A Study on the system Applied Air-Vent to Complex Lay Poly-Urethane Waterproofing Material and Air-Permeability Buffer Sheet of Disconnection Type)

  • 이임배;김홍현;윤수원;민경석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.141-145
    • /
    • 2008
  • Because of world financial crisis, The Korea domestic construction industry has been damaged hugely on material supplying work. A current domestic material supply system can't react properly on a great rise of foreign exchange rate and raw material price, so the system has a problem which is not properly supplying material. To solve this problem, a more innovative material supply work system is seriously needed than ever. So this study wants to improve material supply system for supplying material right time, right place through applying a web-based system. Applying this, overall process of material-supply-work can be done on a web-based system for immediately understanding change of ordering and warehousing by material-supply-schedule to a domestic construction field.

  • PDF

Atmospheric Pressure Plasma Research Activity in Korea

  • Uhm, Han S.
    • 한국표면공학회지
    • /
    • 제34권5호
    • /
    • pp.367-377
    • /
    • 2001
  • Plasma is generated by electrical discharge. Most plasma generation has been carried out at low-pressure gas typically less than one millionth of atmospheric pressure. Plasmas are in general generated from impact ionization of neutral gas molecules by accelerated electrons. The energy gain of electrons accelerated in an electrical field is proportional to the mean free path. Electrons gain more energy at low-pressure gas and generate plasma easily by ionization of neutrals, because the mean free path is longer. For this reason conventional plasma generation is carried out at low pressures. However, many practical applications require plasmas at high-pressure. In order to avoid the requirement for vacuum pumps, researchers in Korea start to develop plasmas in high-pressure chambers where the pressure is 1 atmosphere or greater. Material processing, environmental protection/restoration and improved energy production efficiency using plasmas are only possible for inexpensive bulk plasmas. We thus generate plasmas by new methods and plan to set foundations for new plasma technologies for $21^{st}$ / century industries. This technological research will play a central role in material processing, environmental and energy production industries.

  • PDF

지급자재 조달관리부담 평가에 기초한 중소기업 공사용자재 직접구매제도 대응방안: 공공아파트를 공급하는 발주자를 중심으로 (Developing Response Plan for the Direct Buying System for SME's Construction Materials based on the Analysis of Material Procurement Management Load: Focused on the Owner Providing Public Apartment Housing)

  • 송상훈;방종대;손정락
    • 토지주택연구
    • /
    • 제4권4호
    • /
    • pp.425-434
    • /
    • 2013
  • 중소기업청은 일정규모 이상의 공공건설사업에 대해 일반공사와 의무적으로 분리하여 직접 구매해야 하는 123개 공사용자재 제품군을 지정하고, 법에서 정한 바에 따라 발주기관이 자재를 직접 구매하여 수급인에게 공급하도록 하고 있다. 본 연구에서는 이러한 공사용자재 직접구매제도 하에서 공공아파트 건설 현장에 투입되는 지급자재가 지니는 다양한 특성과 관리요인을 발주자 입장에서 종합적으로 고려하여, 주요관리대상 자재를 파악하고, 자재 조달 프로세스를 기반으로 이들에 대한 적정 관리 방안을 제시하였다. 즉, 조달경로, 현장특화정도, 입주자 요구수준, 업체 책임범위, 납품분할정도, 현장작업 요구도, 부속자재 필요도, 검수조건 등 지급자재가 가지는 주요 관리요인을 적용하여 공공아파트 건설사업에 적용되는 43개 직접 구매 대상품목의 조달관리부담을 평가한 결과, 상대적으로 높은 조달관리노력이 요구되는 주요관리대상그룹에는 목재창호, 알루미늄창호, 승강기, 목재마루재, 레미콘, 타일, 합성수지창호가 포함되었고, 그 중 알루미늄창호와 타일은 집중관리대상으로 분류되었다. 나아가 직접구매제도의 영향에 따른 집중관리대상 자재에 대한 대응방안은 발주자 입장에서 실태, 문제점, 관리측면의 주요 고려사항을 반영하여 작성하였으며, 실질적 수량 산출, 명확한 발주세부조건 정비, 생산 전후 활동 활성화, 하자보수 물량 확보, 공종별 간섭 사전 협의 및 해소 등이 필수적인 관리활동으로 나타났다.

실업계 고등학교 실내디자인 전공 졸업생에 대한 산업현장의 인식 및 요구에 관한 연구 (A Study on the Cognition and Requirement among the Interior Design Field Workers to Vocational High School Graduate)

  • 오혜경;김대년;천진희
    • 한국실내디자인학회논문집
    • /
    • 제29호
    • /
    • pp.11-18
    • /
    • 2001
  • The purpose of this study is to desirable curriculum for interior design major in vocational high school in order to enhance their competitiveness. The study has been carried out by surveying the cognition and requirement among the people who are working in interior design field. The major findings from the survey research are summarized as follows : 1) Hiring vocational high school graduate is positively responded over sixty percentage. The main reason to hire interior design major in vocational school is because of firm believing their capabilities and their own specialties rather than academic degree. 2) It is believed that new vocational high school graduate is lacking behind in most area at the beginning comparing with new college graduate. However it is believed that high school graduate will become equal to the college graduate after a few years and they are more specialized in certain area that college graduate. 3) The most recommendable area for the vocational high school graduate are CAD and Interior Construction Work. 4) The appropriate text book content of (:AD and interior construction work based on the requirement from the industry are as follows ; Regarding to CAD, a specialized textbook for CAD should be written. It is desirable to) educate how to express plan, elevation, perspective drawing and how to develop the presentation skills. Regarding to the Interior Construction Work desirable to develop a specialized textbook and include on the job training program. On the job training is expected to give a practical knowledge and experience by monitoring and drawing by himself every steps from the architectural area to the material selection.

  • PDF

여객선의 Low Location Lighting에 대한 고찰 (A Study on Low Location Lighting of Passenger Ship)

  • 강기원;권지민
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2017년도 특별논문집
    • /
    • pp.63-66
    • /
    • 2017
  • All passenger ships aboard more than 36 passengers are to be able to easily find escape routes when the escape way by fire with flame spread were onboard vessel (incl. Ferry, Passenger, Ro-pax, Inland Ferry) It should be impossible by ordinary emergency lights. The international Maritime Organization (IMO) gives special requirement for luminescent evaluation onboard test procedure and applicable location of low location lighting. In order to maintain the residual light source for a certain time in the low location lighting with a strip-shaped light source, the light source material must be sufficiently exposed to the light due to the proper placement of the escape route. The lighting arrangement influence how maintain low location lighting strip luminescent which measured onboard in connection with what elements are mainly sustain luminescent.

  • PDF

다이싱 블레이드 제조공정의 생산성향상에 관한 연구 (A Study on the Productivity Improvement of the Dicing Blade Production Process)

  • 문정수;박수용;이동형
    • 산업경영시스템학회지
    • /
    • 제39권3호
    • /
    • pp.147-155
    • /
    • 2016
  • Industry 4.0's goal is the 'Smart Factory' that integrates and controls production process, procurement, distribution and service based on the fundamental technology such as internet of the things, cyber physical system, sensor, etc. Basic requirement for successful promotion of this Industry 4.0 is the large supply of semiconductor. However, company I who produces dicing blades has difficulty to meet the increasing demand and has hard time to increase revenue because its raw material includes high price diamond, and requires very complex and sensitive process for production. Therefore, this study is focused on understanding the problems and presenting optimal plan to increase productivity of dicing blade manufacturing processes. We carried out a study as follows to accomplish the above purposes. First, previous researches were investigated. Second, the bottlenecks in manufacturing processes were identified using simulation tool (Arena 14.3). Third, we calculate investment amount according to added equipments purchase and perform economic analysis according to cost and sales increase. Finally, we derive optimum plan for productivity improvement and analyze its expected effect. To summarize these results as follows : First, daily average blade production volume can be increased two times from 60 ea. to 120 ea. by performing mixing job in the day before. Second, work flow can be smoother due to reduced waiting time if more machines are added to improve setting process. It was found that average waiting time of 23 minutes can be reduced to around 9 minutes from current process. Third, it was found through simulation that the whole processing line can compose smoother production line by performing mixing process in advance, and add setting and sintering machines. In the course of this study, it was found that adding more machines to reduce waiting time is not the best alternative.

TFT-LCD 공장의 생산계획 수립에 관한 연구 (A Study of Production Scheduling Scheme in TFT-LCD Factory)

  • 나혁준;백종관;김성식
    • 산업공학
    • /
    • 제15권4호
    • /
    • pp.325-337
    • /
    • 2002
  • In this study we consider the problem of production planning of TFT-LCD(Thin Film Transistor - Liquid Crystal Display) production factory. Due to the complexities of the TFT-LCD production processes, it is difficult to schedule the production planning, and the study about automated scheduler is insufficient. In addition, the existing production method is a Push-System to raise the operation rate with expensive equipment, that has the problem to satisfy the due-date. This study presents an algorithm having a concept of Pull-System that satisfies the due-date and considers specialties of TFT-LCD production process. We make MPS(Master Production Schedule) according to the sales order, and present algorithms for scheduling about In/Out plan considering factory capacity, line balancing, material requirement, and inventory level of all Array, Cell, and Module processes. These algorithms are integrated as an automated production system, and we implement them in the actual TFT-LCD factory circumstance.

노출콘크리트 마감공법의 시공 프로세스 분석을 통한 설계 시공관리 방안 (The Design and Construction Management of Exposed Concrete Finish Work through the Construction Process Analysis)

  • 송영웅;최윤기
    • 한국건설관리학회논문집
    • /
    • 제6권6호
    • /
    • pp.160-170
    • /
    • 2005
  • 노출 콘크리트 마감공법은 건축설계자의 입면 개념에 따라 일반 및 제물치장 콘크리트 마감공법과 더불어 다양한 마감품질과 표면형태를 나타내며 최근 적용사례가 꾸준히 증가하고 있는 추세이다. 노출 콘크리트 마감공법은 설계 및 시공수준, 마감면의 품질 및 평활도, 색상 및 질감에 따라 타 콘크리트 마감공법보다 공사비 투입이 증가되고 체계적인 설계 및 시공관리가 요구됨에도 불구하고 노출 콘크리트 마감공법에 대한 정의가 불명확하고 설계, 시공, 유지관리 단계별 관리 방안이 구체적으로 제시되지 않아 원가상승, 시공품질 저하, 시공성 저하 등의 문제가 유발되고 있다. 본 연구에서는 노출 콘크리트 마감공법의 체계적인 관리방안 제시를 위하여 국내의 불명확한 노출 콘크리트 마감공법의 정의를 문헌조사 및 사례조사를 통하여 명확하게 제시하고, 노출 콘크리트 마감공법의 색채균일성, 균열발생 억제, 콘크리트 충전성확보 등 노출콘크리트 마감공법의 요구사항과 결함유형을 분석하였다. 이를 바탕으로 노출 콘크리트 마감공법의 시공프로세스를 타 콘크리트 마감공법과 비교 분석하였으며, 노출 콘크리트 마감공법의 설계단계, 시공계획 및 관리단계, 유지 보수 단계별 관리방안을 제시하였다.

디스패칭 룰 기반의 Advanced Planning and Scheduling (APS) 시스템 활용 사례연구 (A Case Study on Application of Dispatching Rule-Based Advanced Planning and Scheduling (APS) System)

  • 이재용;신문수
    • 산업경영시스템학회지
    • /
    • 제38권3호
    • /
    • pp.78-86
    • /
    • 2015
  • Up-to-date business environment for manufacturers is very complex and rapidly changing. In other words, companies are facing a variety of changes, such as diversifying customer requirements, shortening product life cycles, and switching to small quantity batch production. In this situation, the companies are introducing the concept of JIT (just-in-time) to solve the problem of on-time production and on-time delivery for survival. Though many companies have introduced ERP (enterprise resource planning) systems and MRP (material requirement planning) systems, the performance of these systems seems to fall short of expectations. In this paper, the case study on introducing an APS (advanced planning and scheduling) system based on dispatching rules to a machining company and on finding a method to establish an efficient production schedule is presented. The case company has trouble creating an effective production plan and schedule, even though it is equipped with an MRP-based ERP system. The APS system is applied to CNC (computer numerical control) machines, which are key machines of the case company. The overall progress of this research is as follows. First, we collect and analyze the master data on individual products and processes of the case company in order to build a production scheduling model. Second, we perform a pre-allocation simulation based on dispatching rules in order to calculate the priority of each order. Third, we perform a set of production simulations applying the priority value in order to evaluate production lead time and tardiness of pre-defined dispatching rules. Finally, we select the optimal dispatching rule suitable for work situation of the case company. As a result, an improved production schedule leads to an increase in production and reduced production lead time.