• Title/Summary/Keyword: material delay

Search Result 296, Processing Time 0.022 seconds

Surgical Treatment of Cutaneous Angiosarcoma of Scalp:Usefulness of Preoperative Mapping Biopsies (두피에 발생한 혈관육종의 수술시 Mapping Biopsy의 유용성)

  • Kang, Min-Gu;Park, Jong-Lim;Kim, Myung-Good;Minn, Kyung-Won;Koh, Kyung-Suck;Chang, Hak
    • Korean Journal of Head & Neck Oncology
    • /
    • v.23 no.1
    • /
    • pp.37-40
    • /
    • 2007
  • Objectives:Cutaneous angiosarcoma is an infrequent but aggressive neoplasm involving the skin of the face and scalp. Unfamiliarity with the clinical manifestations of cutaneous angiosarcoma frequently leads to misdiagnosis and delay in treatment. Complete surgical resection requires the performance of preoperative staging biopsies to determine the true extent of the neoplasm. Intraoperative frozen section analysis to determine the adequacy of the surgical resection is unreliable due to the high false negative rate. Material and Methods:In five scalp angiosarcoma cases, mapping biopsies were performed at far from the suspected edge of the neoplasm. On permanent pathology, we obtained tumor free margin with occasional focal involvement of the tumor. Results:Frozen-section analysis of the resected margins is inconclusive, for the subtle diagnostic features of angiosarcoma are distorted by the tissue processing required for frozen-section analysis. The characteristic dermal vessels lined by their malignant cells are collapsed by the freezing process. This results in a high rate of false-negative reports and possibly leads to incomplete resection of the neoplasm. Conclusion:Our recommendation is to establish the margins of the tumor by performing preoperative evaluations by mapping biopsies.

Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project (초고층 건설공사 시공단계 리스크 요인 도출 및 분석)

  • Kim, Sooyong;Kim, Sunghyun;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.90-98
    • /
    • 2016
  • High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are 'Operation plan of material lifting', 'Outrigger & Belt Truss Construction', 'Foundation work plan of high-rise building' and 'Considering a Structure concept of high-rise building'.

Electrical Characteristic of Power MOSFET with Zener Diode for Battery Protection IC

  • Kim, Ju-Yeon;Park, Seung-Uk;Kim, Nam-Soo;Park, Jung-Woong;Lee, Kie-Yong;Lee, Hyung-Gyoo
    • Transactions on Electrical and Electronic Materials
    • /
    • v.14 no.1
    • /
    • pp.47-51
    • /
    • 2013
  • A high power MOSFET switch based on a 0.35 ${\mu}m$ CMOS process has been developed for the protection IC of a rechargeable battery. In this process, a vertical double diffused MOS (VDMOS) using 3 ${\mu}m$-thick epi-taxy layer is integrated with a Zener diode. The p-n+Zener diode is fabricated on top of the VDMOS and used to protect the VDMOS from high voltage switching and electrostatic discharge voltage. A fully integrated digital circuit with power devices has also been developed for a rechargeable battery. The experiment indicates that both breakdown voltage and leakage current depend on the doping concentration of the Zener diode. The dependency of the breakdown voltage on doping concentration is in a trade-off relationship with that of the leakage current. The breakdown voltage is obtained to exceed 14 V and the leakage current is controlled under 0.5 ${\mu}A$. The proposed integrated module with the application of the power MOSFET indicates the high performance of the protection IC, where the overcharge delay time and detection voltage are controlled within 1.1 s and 4.2 V, respectively.

Cerebral Hemodynamic Analysis in Pediatric Moyamoya Patients using Perfusion Weighted MRI (관류 강조 자기공명 영상을 이용한 소아 모야모야 환아의 뇌 혈역학 분석)

  • Chang, Won-Seok;Kim, Tae-Gon;Lee, Seung-Koo;Choi, Jung-Uhn;Kim, Dong-Seok
    • Journal of Korean Neurosurgical Society
    • /
    • v.37 no.3
    • /
    • pp.207-212
    • /
    • 2005
  • Objective: Classically, single photon emission tomography is known to be the reference standard for evaluating the hemodynamic status of patients with moyamoya disease. Recently, T2-weighted perfusion magnetic resonance(MR) imaging has been found to be effective in estimating cerebral hemodynamics in moyamoya disease. We aim to assess the utility of perfusion-weighted MR imaging for evaluating hemodynamic status of moyamoya disease. Methods: The subjects were fourteen moyamoya patients(mean age: 7.21 yrs) who were admitted at our hospital between Sep. 2001 to Sep 2003. Four normal children were used for control group. Perfusion MR imaging was performed before any treatment by using a T2-weighted contrast material-enhanced technique. Relative cerebral blood volume(rCBV) and time to peak enhancement(TTP) maps were calculated. Relative ratios of rCBV and TTP in the anterior cerebral artery(ACA), middle cerebral artery(MCA) and basal ganglia were measured and compared with those of the posterior cerebral artery(PCA) in each cerebral hemispheres. Using this data, we analysed the hemodynamic aspect of pediatric moyamoya disease patients in regarding to the age, Suzuki stage, signal change in FLAIR MR imaging, and hemispheres inducing symptoms. Results: The mean rCBV ratio of ACA, MCA did not differ between normal children and moyamoya patients. However the significant TTP delay was observed at ACA, MCA territories (mean = 2.3071 sec, 1.2089 see, respectively, p < 0.0001). As the Suzuki stage of patients is advanced, rCBV ratio is decreased and TTP differences increased. Conclusion: Perfusion MR can be applied for evaluating preoperative cerebral hemodynamic status of moyamoya patients. Furthermore, perfusion MR imaging can be used for determine which hemisphere should be treated, first.

Performance Improvement of Pneumatic Artificial Muscle Manipulators Using Magneto-Rheological Brake

  • Ahn, Kyoung-Kwan;Cong Thanh, TU Diep;Ahn, Young-Kong
    • Journal of Mechanical Science and Technology
    • /
    • v.19 no.3
    • /
    • pp.778-791
    • /
    • 2005
  • A novel pneumatic artificial muscle actuator (PAM actuator), which has achieved increased popularity to provide the advantages such as high strength and high power/weight ratio, low cost, compactness, ease of maintenance, cleanliness, readily available and cheap power source, inherent safety and mobility assistance to humans performing tasks, has been regarded during the recent decades as an interesting alternative to hydraulic and electric actuators. However, some limitations still exist, such as the air compressibility and the lack of damping ability of the actuator bring the dynamic delay of the pressure response and cause the oscillatory motion. Then it is not easy to realize the performance of transient response of pneumatic artificial muscle manipulator (PAM manipulator) due to the changes in the external inertia load with high speed. In order to realize satisfactory control performance, a variable damper-Magneto­Rheological Brake (MRB), is equipped to the joint of the manipulator. Superb mixture of conventional PID controller and a phase plane switching control method brings us a novel controller. This proposed controller is appropriate for a kind of plants with nonlinearity, uncertainties and disturbances. The experiments were carried out in practical PAM manipulator and the effectiveness of the proposed control algorithm was demonstrated through experiments, which had proved that the stability of the manipulator can be improved greatly in a high gain control by using MRB with phase plane switching control method and without regard for the changes of external inertia loads.

Estimation for optimum crush depth to prevent reflection crack for Rubblized-PCC in PCC pavements (노후콘크리트포장 원위치 파쇄기층(Rubblized-PCC)의 반사균열 억제를 위한 적정 파쇄 깊이 산정)

  • Lee, Seung-Woo;Chon, Sang-Min
    • International Journal of Highway Engineering
    • /
    • v.6 no.4 s.22
    • /
    • pp.101-108
    • /
    • 2004
  • Asphalt overlay method is a general method to extend the of life old concrete pavements. However, reflection cracks are the typical problem of the AC overlay on distressed concrete pavement. Joint sealing, stress absorbtion layer have been used to prevent reflection cracks however partial success of to delay the timing of reflection cracking was recognized. Reflection crack problem can be eliminated by using rubblization method, which crush concrete pavement slab into piece of aggregate size that can be used base material. Previous research on rubblization method indicated that the size of rubblized PCC ranged 40-70mm at upper layer, and more than 100mm at lower layer. In this study, the adequate depth of rubblized PCC that ran prevent reflection cracking of AC overlay is estimated base on the simulation test of reflection cracking with 0, 10, 20cm rubblized PCC base.

  • PDF

Establishment of the Repair Cycle of the Components of the Apartment Housing

  • Lee, KangHee;Ahn, YongHan;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.14 no.2
    • /
    • pp.69-75
    • /
    • 2014
  • Building has been deteriorated over the year after construction. The deterioration has caused to hinder the living condition and to decrease the building value. Thus, it is important to prevent or delay the building deterioration as well as to proceed the maintenance. The long-term repair program for the apartment in Korea plays a key role to make the repair plan after construction and to assure the function decent. This is not flexible to the change of the material and component because the program is provided by the Korean-law. Many items are omitted in the long-term program so that the maintenance experts face many difficulties to make a repair plan. In this paper, it aimed at providing the repair cycle and repair ratio according to the repair scope, which are not provided in the current program. This study shows that the repair ratio is presented with quartile range in 25%, 50%, 75% and 100%. This has an advantage to take an overall look in repair items. Under this presentation of the repair ratio, each item has a unique repair value. Second, the repair scope is divided into partly repair, fully repair, partly alteration and fully alteration. If a fully repair has a repair ratio close to 100%, it would mean that a fully repair is a fully alteration. Third, the short repair cycle means that it requires to maintain the function or performance of the components in a short term.

Performance Improvement of Stratified Thermal Storage Tank Using Heat Insulator (단열층 사용을 통한 성층 축열조 성능개선)

  • Lim, Se Hwa;Lee, Tae Gyu;Shin, Seungwon
    • Transactions of the KSME C: Technology and Education
    • /
    • v.2 no.1
    • /
    • pp.65-72
    • /
    • 2014
  • The purpose of this study is to design a heat insulator for reducing available energy loss in stratified thermal storage tank. Heat insulator is operated by buoyancy effect from density difference between hot and cold water without extra equipment. Analysis model using the Matlab Simulink was developed to estimate the internal temperature distribution in thermal storage tank and also used to select proper material and thickness of the heat insulator. Operational feasibility was confirmed through reduced scale experiment. As a result, heat insulator can effectively delay the formation of thermal boundary layer between hot and cold water. In reduced scale experiment, heat insulator can preserve additional 1540J of available energy. When applied to the real thermal storage tank, increase of 6% thermal storage efficiency can be expected.

Modeling of RC shear walls strengthened by FRP composites

  • Sakr, Mohammed A.;El-khoriby, Saher R.;Khalifa, Tarek M.;Nagib, Mohammed T.
    • Structural Engineering and Mechanics
    • /
    • v.61 no.3
    • /
    • pp.407-417
    • /
    • 2017
  • RC shear walls are considered one of the main lateral resisting members in buildings. In recent years, FRP has been widely utilized in order to strengthen and retrofit concrete structures. A number of experimental studies used CFRP sheets as an external bracing system for retrofitting of RC shear walls. It has been found that the common mode of failure is the debonding of the CFRP-concrete adhesive material. In this study, behavior of RC shear wall was investigated with three different micro models. The analysis included 2D model using plane stress element, 3D model using shell element and 3D model using solid element. To allow for the debonding mode of failure, the adhesive layer was modeled using cohesive surface-to-surface interaction model at 3D analysis model and node-to-node interaction method using Cartesian elastic-plastic connector element at 2D analysis model. The FE model results are validated comparing the experimental results in the literature. It is shown that the proposed FE model can predict the modes of failure due to debonding of CFRP and behavior of CFRP strengthened RC shear wall reasonably well. Additionally, using 2D plane stress model, many parameters on the behavior of the cohesive surfaces are investigated such as fracture energy, interfacial shear stress, partial bonding, proposed CFRP anchor location and using different bracing of CFRP strips. Using two anchors near end of each diagonal CFRP strips delay the end debonding and increase the ductility for RC shear walls.

A Case Study on the Construction of Concrete Lining in Parallel with Blasting in a Long Tunnel (장대터널 굴착시 발파-라이닝 병행시공 사례연구)

  • Ryu Joung-Hoon;An Hyung-Jun;You Jin-O;Choi Byung-Hee
    • Explosives and Blasting
    • /
    • v.24 no.1
    • /
    • pp.39-48
    • /
    • 2006
  • The various alternatives to reduce the construction period and cost in the wide and long tunnel have been attempted recently. However, the concrete lining forming process after finishing tunnel excavation may delay construction period considering the specific conditions of the wide and long tunnel. The concrete lining is indispensible for the road tunnel. For this reason, the blasting-lining synchronizing study had been carried out to reduce construction period in the Gyea-Ryong Tunnel. Lining models were installed at four different distance conditions the floor of the tunnel. After model installation, hundreds of blasting vibration measurements and concrete material tests were performed to calculate the safe distance between blasting point and concrete lining form. The study also introduces a method which can obtain the better ability of construction by improving working environment with the ventilation and the relocation of tunnel equipments in the working places.