• 제목/요약/키워드: maintenance schedule

검색결과 162건 처리시간 0.02초

Maintenance Staff Scheduling at Afam Power Station

  • Alfares, H.K.;Lilly, M.T.;Emovon, I.
    • Industrial Engineering and Management Systems
    • /
    • 제6권1호
    • /
    • pp.22-27
    • /
    • 2007
  • This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek schedule currently being practiced by Afam power station maintenance line. The second alternative is to switch to a seven-day workweek schedule for the morning shift only. The third alternative is to use a seven-day workweek schedule for all three work shifts. The third alternative is chosen, as it is expected to save 11% of the maintenance labour cost.

경쟁적 전력시장에서 계통운용자의 발전기 예방정비계획에 관한 연구 (A study on generator maintenance scheduling of system operator in competitive electricity markets)

  • 한석만;신영균;김발호;박종배;차준민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.447-449
    • /
    • 2003
  • In competitive electricity markets, maintenance schedule is submitted by Genco's and Transco's, and coordinated by ISO with the adequacy criterion. This paper presents an alternative coordination procedure by ISO on the maintenance schedule.

  • PDF

기록물분류기준표의 운영과 과제 (A study on Improving Operation of the Records Disposition Schedule)

  • 박유진
    • 기록학연구
    • /
    • 제8호
    • /
    • pp.57-95
    • /
    • 2003
  • For a good record maintenance according to organization and functions in Korea, it is required to make better use of 'Records Disposition Schedule', which is originally developed as a computerized system that can control the whole records maintenance procedure and manage every record according to organization and functions. 'Records Disposition Schedule' is only a system that allows us to maintain every record according to organization and functions and manage every information about such organization and functions. Accordingly, a well-functioning Records Disposition Schedule requires the exact modification and operation of such schedule depending upon organizational or functional changes. If the Records Disposition Schedule is not reasonably modified and operated depending upon organizational or functional changes, we won't be able to maintain any records in linkage with organization and functions and control the whole works throughout record maintenance.

경쟁적 전력시장에서 계통운용자의 발전기 예방정비계획에 관한 연구 (Generator Maintenance Scheduling of System Operator in Competitive Electricity Markets)

  • 한석만;신영균;정구형;김강원;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권8호
    • /
    • pp.477-483
    • /
    • 2004
  • In competitive electricity markets, maintenance schedule is submitted by generation companies (GENCOs) and transmission companies (TRANSCOs), and coordinated by Independent System Operator (ISO) with the adequacy criterion. This paper presents an alternative coordination procedure by ISO on the maintenance schedule. In this paper, it is focused on modeling a coordination algorithm by ISO for the maintenance schedule based on the Simulated Annealing algorithm. The proposed model employs the minimum information such as generator capacity, forced outage rate and generator maintenance schedules. The objective function of this model represents minimization of adjustment on schedules submitted by GENCOs.

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

TWBP 시장에서 계통운용자의 발전설비 예방정비계획 조정 알고리즘에 관한 연구 (Coordination of Generator Maintenance Schedule in Two-Way Bidding Pools)

  • 한석만;정구형;김발호;박종배;차준민
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권12호
    • /
    • pp.685-688
    • /
    • 2004
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules whenever the collective maintenance schedule reported to SO by Gencos in the pool does not satisfy the specified operating criteria, such as system reliability or supply adequacy. The SO's coordination usually involves sorts of financial conflict among Genco's. This paper proposes a coordination algorithm which minimizes the total financial loss of Genco's while satisfying the required operating criteria.

송전계통을 고려한 발전기 예방정비계획 방법론에 관한 연구 (Method of Generator Maintenance Scheduling Considering Transmission System)

  • 한석만;신영균;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.104-106
    • /
    • 2004
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules whenever the collective maintenance schedule reported to SO by Gencos in the pool does not satisfy the specified operating criteria, such as system reliability or supply adequacy. In this paper, we divide maintenance schedule problem into master-problem and sub-problem. Master-problem is schedule coordination and sub-problem is DC-optimal power flow. If sub-problem is infeasible, we use the algorithm of modifying operating criteria of master-problem.

  • PDF

항공기 엔진 정비 일정 수립을 위한 동적 계획 모델 개발 (Developing a dynamic programming model for aircraft-engine maintenance scheduling)

  • 주성종;신상헌
    • 경영과학
    • /
    • 제13권3호
    • /
    • pp.163-172
    • /
    • 1996
  • According to flying hours, aircraft engines require regular overhaul for preventive maintenance. Because of hostile defense environment of Republic of Korea, the aircraft of republic of Korea Air Force(ROKAF) have been operated at the maximum level of availability and have similar overhaul schedule in several months. The concentration of overhaul schedule in a short period demands additional spare engines far exceeding the spare engines for corrective maintenance. If ROKAF decides to purchase extra engines for the preventive maintenance, the extra engines will be used only for the preventive maintenance and will be excess inventory for the most of aircraft life ccle. Also, the procurement of extra engines is significant investment for ROKAF. To help ROKAF schedule the preventive maintenance without significant spending, this study develops a dynamic programming model that is solvable using an integer programming algorithm. The model provides the number of engines that should be overhauled for a month for multiple periods under given constraints. ROKAF actually used this model to solve a T-59 engine overhaul problem and saved about three billion won at one time. ROKAF plans to use this model continuously for T-59 and other weapon systems. Thus, saving for long term will be significant to ROKAF. Finally, with minor modification, this model can be applied to deciding the minimum number of spare engines for preventive maintenance.

  • PDF

확률론적 FMECA를 이용한 발전설비의 신뢰도 기반 유지보수계획 수립 (Reliability-Centered Maintenance of Generating Unit Using Stochastic FMECA)

  • 주재명;김동민;변용태;김형철;김진오
    • 조명전기설비학회논문지
    • /
    • 제22권1호
    • /
    • pp.58-65
    • /
    • 2008
  • 본 논문은 신뢰도 기반 유지보수(RCM : Reliability-Centered Maintenance) 계획에 의한 발전설비의 유지보수주기를 평가하고 있다. 유지보수주기는 발전설비의 안정성 및 비용을 결정하기 위한 기준으로 활용된다. 본 논문에서는 설비 수명평가를 통해 확률분포를 이용한 확률론적 FMECA(Failure Mode, Effects and Criticality Analysis)에 대해 논하고, 국내 발전 설비 중 비교적 평균수명이 짧은 복합화력 발전소를 선정하여 유지보수 주기를 평가하였다. 발전소 유지보수 평가는 향후 구조 개편된 전력시장에서 유지보수계획 수립 방법의 유용한 지표로 활용 가능할 것이다.