Browse > Article

Coordination of Generator Maintenance Schedule in Two-Way Bidding Pools  

Han Seok-Man (홍익대학 전기정보제어공학과)
Chung Koo-Hyung (홍익대학 전기정보제어공학과)
Kim Balho H. (홍익대학 전기정보제어공학과)
Park Jong-Bae (건국대학 전기공학과)
Cha Jun-Min (대진대학 전기공학과)
Publication Information
The Transactions of the Korean Institute of Electrical Engineers A / v.53, no.12, 2004 , pp. 685-688 More about this Journal
Abstract
In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules whenever the collective maintenance schedule reported to SO by Gencos in the pool does not satisfy the specified operating criteria, such as system reliability or supply adequacy. The SO's coordination usually involves sorts of financial conflict among Genco's. This paper proposes a coordination algorithm which minimizes the total financial loss of Genco's while satisfying the required operating criteria.
Keywords
Generator Maintenance Schedule; Coordination; TWBP Markets; ISO′s Coordination Procedure;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 E. L. da Silva, M. Th. Schilling & M. C. Rafael 'Generation Maintenance Scheduling Considering Transmission Constraints', Trans. IEEE, Vol 15, pp838-843, 2000   DOI   ScienceOn
2 한석만 외, '경제적 전력시장에서 계통운용자의 발전기 예방정비계획에 관한 연구', 대한전기학회논문지, Vol. 53A 8월호, pp. 477-483, 2004   과학기술학회마을
3 한석만 외, '경쟁적 전력시장에서 발전기 예방정비계획 알고리즘에 관한 연구', 대한전기학회 하계학술대회, Vol. A, pp. 643-645, 2003
4 Yaoyu Wang & Edmund Handschin, 'Unit Maintenance Scheduling in Open System Using Genetic Algorithm', Transmission and Distribution Conference, IEEE, Vol 1 , pp.334-339, 1999   DOI
5 D. Chattopadhyay, 'A practical maintenance scheduling program : mathematical model and case study', Trans. IEEE, Vol 13, pp. 1475-1480, 1998   DOI   ScienceOn
6 Z. A. Yamayee, 'Maintenance Scheduling : Description, Literature Survey, and Interface with Overall Operations Scheduling', Trans. IEEE, Vol. 8, 1982   DOI   ScienceOn
7 Jung-Won Jung & Jung-Ik Kim, 'Maintenance Scheduling using a Genetic Algorithm with New Crossover Operators', Trans. KIEE, Vol. 48, pp. 545-552, 1999   과학기술학회마을
8 H. Kim, S. Moon, J. Choi, S. Lee, D. Do and M. M. Gupta, 'Generator maintenance scheduling considering air pollution based on the fuzzy theory', in Porch. IEEE International Fuzzy System Con., Vol. 3, pp. 1759-1765, 1999   DOI
9 M. Shahidehpour & M. Marwali, 'Maintenance Scheduling in Restructured Power Systems', Kluwer Academic Publishers, 2000