• 제목/요약/키워드: maintenance models

검색결과 649건 처리시간 0.025초

주기적 예방보전의 최적정책에 관한 연구

  • 나명환;손영숙;김문주
    • 한국신뢰성학회:학술대회논문집
    • /
    • 한국신뢰성학회 2005년도 학술발표대회 논문집
    • /
    • pp.115-120
    • /
    • 2005
  • This paper introduces models for preventive maintenance policies and considers periodic preventive maintenance policy with minimal repair when the failure of system occurs. It is assumed that minimal repairs do not change the failure rate of the system. The failure rate under prevention maintenance received an effect by a previously prevention maintenance and the slope of failure rate increases the model where it considered. Also the start point of failure rate under prevention maintenance considers the degradation of system and that it increases quotient, it assumed. Per unit time it bought an expectation cost from under this prevention maintenance policy. We obtain the optimal period time and the number for the periodic preventive maintenance by using Nakagawa's Algorithm, which minimizes the expected cost rate per unit time. Finally, it suppose that the failure time of a system has a Weibull distribution as an example and we obtain an expected cost rate per unit time the optimal period time and the number when cost of replacement and cost of minimal repair change.

  • PDF

Toward A Reusable Knowledge Based System

  • Yoo, Young-Dong
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제3권
    • /
    • pp.71-82
    • /
    • 1994
  • Knowledge acquisition, maintenance of knowledge base, and validation and verification of knowledge are the addressed bottlenecks of building successful knowledge based systems. Along with the increment of interesting in the knowledge based systems, the organization needs to develop a new one although it has a similar one. This causes several serious problems including knowledge redundancy and maintenance of knowledge base. This paper present three models of the reusable knowledge base which might be the solution to the above problem. Three models are : 1) multiple knowledge bases for a single AI application, 2) multiple knowledge bases for multiple AI applications, 3) a single knowledge base for multiple AI applications. A new approach to build such a reusable knowledge base in a homogeneous environment is presented. Our model combines the essential object-oriented techniques with rules in a consistent manner. Important aspects of applying object-oriented techniques to AI are discussed (inheritance, encapsulation, message passing), and some potential problems in building an AI application (decomposition technique of knowledge, search time, and heterogeneous environment) are pointed out. The models of a reusable knowledge base provide several amenities : 1) reduce the knowledge redundancy, 2) reduce the effort of maintenance of the knowledge base, 3) reuse the resource of the multiple domain knowledge bases, 4) reduce the development time.

  • PDF

무기체계 신뢰도 예측시 임무주기 적용 방안에 대한 연구 (Methodologies of Duty Cycle Application in Weapon System Reliability Prediction)

  • 윤희성;정다운;이은학;강태원;이승헌;허만옥
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제11권4호
    • /
    • pp.433-445
    • /
    • 2011
  • Duty cycle is determined as the ratio of operating time to total time. Duty cycle in reliability prediction is one of the significant factors to be considered. In duty cycle application, non-operating time failure rate has been easily ignored even though the failure rate in non-operating period has not been proved to be small enough. Ignorance of non-operating time failure rate can result in over-estimated system reliability calculation. Furthermore, utilization of duty cycle in reliability prediction has not been evaluated in its effectiveness. In order to address these problems, two reliability models, such as MIL-HDBK-217F and RIAC-HDBK-217Plus, were used to analyze non-operating time failure rate. This research has proved that applying duty cycle in 217F model is not reasonable by the quantitative comparison and analysis.

국가 사회기반시설물에 대한 거시적 관점의 미래 유지보수 투자규모에 관한 연구 (A Study on Macroscopic Future maintenance Investment Scale for National SOC Infrastructure)

  • 이동현;전태현;김지원;박기태;김용수
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제21권4호
    • /
    • pp.87-96
    • /
    • 2017
  • 국가 전략적 차원에서 전체 사회기반시설물에 대해 미래에 필요한 유지보수 예산 파악하는 것은 매우 중요한 부분이다. 그러나 현재 국내에서는 전체 대규모 시설물에 적용할 수 있는 유지보수비용 예측 기법이 거의 전무한 실정이다. 본 연구에서는 현재 국내에서 가용한 자료와 적용 가능한 예측모델을 토대로 우리나라 전체 향후 SOC 시설물에 대한 향후 유지보수 투자 규모를 예측하였다. 실제 지출비용과 비교하여 가장 적합한 예측모델을 선정하고 관리주체에서 과거에 지출한 유지보수비용 자료를 이용하여 일부 모델은 개발하여 교량, 터널, 포장, 항만, 댐, 공항, 상수도, 하천, 항만 등의 사회기반시설물에 대한 최적의 미래 유지보수 비용을 산출하였다. 앞으로 10년간 총 비용예측결과, 8종의 사회기반시설물에 대하여 약 23조원이 필요한 것으로 나타났으며, 가장 비용이 크게 발생하는 시설물은 도로포장, 도로교량으로 나타났다.

3차원 그래픽 모델에 근거한 자동화 장비의 설계 및 조종 (3-D Graphical Model-Based Design and Control of Automated Equipment)

  • 서종원;칼하스
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.188-191
    • /
    • 2002
  • This paper concerns 3-D graphical modeling and simulation techniques for design and control of automated equipment for construction and facility maintenance. A case study on the use of 3-D graphics techniques for developing a power plant maintenance robot is presented. By simulating equipment operation within the 3-D geometry models of the work environment the environment design was improved. The 3-D graphical models of the equipment and the work environment were further utilized for the control of the robot from a remote distance. By presenting the real-time updated equipment configuration and the work environment to the operator, the graphical model-based equipment control system helped the operator overcome the problems associated with spatial perception. The collision between the robot and the plant structures was also avoided based the real-time analysis of the dynamically updated graphical models.

  • PDF

복층터널 중간슬래브 유지관리에 따른 응력분포 특성 분석 (Characteristics of Middle Slab Stresses in Double-Deck Tunnel During Maintenance)

  • 조영교;이영훈;박범근;김성민
    • 한국도로학회논문집
    • /
    • 제19권6호
    • /
    • pp.47-56
    • /
    • 2017
  • PURPOSES : The purpose of this study is to investigate the stresses of the middle slab in a double-deck tunnel owing to the slab lift to replace the underlying elastic pads during maintenance work. METHODS : The middle slab was divided into three different sections: typical section, expansion joint section, and emergency passageway section. Finite element analysis models of these three sections of middle slab were developed, and the stress distribution and maximum stresses were obtained using the models when the middle slab was lifted to replace the underlying elastic pads. Various slab lifting methods were examined in this study such as one-, two-, and multiple-point lifts, distributed lifts, and one or both slab side edge lifts. RESULTS : When the slab side edge is lifted, the longitudinal stresses of the slab are almost the same as the principal stresses. This implies that the governing stresses are the longitudinal stresses. The maximum stresses with both-edge lifts are generally smaller than those with one-edge lifts at all three sections of middle slab. CONCLUSIONS : If the middle slab in a double-deck tunnel is lifted for maintenance, the slab should be lifted at multiple points along the longitudinal direction to reduce the tensile stresses.

교량 유지관리용 디지털 트윈 모델 구축을 위한 수치해석모델 개선 기법 (Numerical Model Updating for Bridge Maintenance Using Digital-Twin Model)

  • 윤상귀;신수봉;신도형
    • 한국BIM학회 논문집
    • /
    • 제8권4호
    • /
    • pp.34-40
    • /
    • 2018
  • As the number of aged bridges increases, the development of efficient bridge maintenance techniques is becoming more important. Particularly, there have been many studies on digital-twin models of bridges for maintenance and SHM (Structure Health Monitering). However, in order to use the digital-twin model for maintenance of the bridge, the model updating process that matches the structural response between the real bridge and the digital-twin bridge model must be done. This study presents a model updating method that adjusts bridge's stiffness and boundary condition with genetic algorithm (GA) using static displacements and verified proposed updating method through field test on PSC girder bridge. This study also proposes a conceptual idea to construct an efficient bridge maintenance system by applying the updated numerical analysis model to the digital-twin model.

국산훈련기 신뢰성기반 정비주기 연장방안 연구 (A Study for Maintenance Period Extension based on Reliability of Korea Trainer)

  • 조인탁;박종훈
    • 산업경영시스템학회지
    • /
    • 제43권4호
    • /
    • pp.123-132
    • /
    • 2020
  • Currently, there are two types of trainer in Korea : basic and advanced. Both models have been in operation for more than 10 years, and compared to the early stage of operation, reliability has gradually improved and failure rates have also entered a trend of stabilization. Therefore, it is necessary to extend the maintenance period considering economic feasibility. This study investigates the three maintenance period calculation methods: NAVAIR 00-25-403 [17], DOD, U.S. [4], CERL and US Army [3], with intention to extend the maintenance period of the trainer from current 200 hours to 400 hours. In addition, the maintenance period was calculated by the three methods with actual operational data. Common standards and procedures were established to apply operational data to the existing maintenance period calculation methods, the required reliability indicators were derived, and the maintenance periods was calculated based on the results, additionally, a review on the field applicability of the three maintenance cycles was conducted. An on-site interviews were conducted with the calculation results, and 11 out of the 15 items were expected to be extended by 400 hours. It was suggested that the remaining 4 items could be extended to 400 hours by supplementing the inspection method through additional analysis such as functional analysis, inspection content verification, and site connection.

공동주택의 관리비 추정모델 연구 (A Study on the Maintenance Cost Estimation Model of the Apartment Housing)

  • 이강희;양재혁;채창우
    • 한국주거학회논문집
    • /
    • 제21권2호
    • /
    • pp.59-67
    • /
    • 2010
  • The maintenance cost plays a important role to plan the scale of the apartment housing such as a number of household, building area and building type. Therefore, it is required to forecast the cost considering various maintenance characteristics. The maintenance characteristics are floor area, number of household, heating type, site area and etc.. In addition, the maintenance cost are classified into 5 area. These are a personal expense, facility maintenance cost, energy and water cost, insurance and sanitary cost. These five cost area are related with various characteristics and brought up the estimation model using the stepwise multiple regression analysis. The energy and heating cost share over the 50% in the total cost and the personal expense cost shares about 40%. The personal expense cost per area is 5,272 won/$m^2{\cdot}yr$ irregardless of heating type and the district heating type is a higher cost than other type. In facility maintenance cost, the central heating type is 2,015 won/$m^2{\cdot}yr$ and higher than other type. The estimation models have good statistics in each model. Most of the model have a determination coefficient over 0.7 and Durbin Watson value between 1.5 and 2.5.