• Title/Summary/Keyword: maintenance manpower

Search Result 149, Processing Time 0.021 seconds

A Statistical Method on the Estimation of the Maintenance Manpower of Aircraft (통계적 방법을 이용한 항공기 정비인력산정)

  • 송근우;최석철
    • Journal of the military operations research society of Korea
    • /
    • v.26 no.1
    • /
    • pp.70-88
    • /
    • 2000
  • In this research we consider a statistical model to estimate the optimal maintenance manpower of aircraft which we use at present. We design a multiple regression model, apply to three types of aircraft to estimate the optimal maintenance manpower of aircraft. This paper provides reasonable results about maintenance manpower of aircraft, and contributes accomplishment of mission for air and air support operations.

  • PDF

Factors Affecting on the Work-related Performance Level of TB Control Manpower (결핵관리전담요원의 업무수행정도와 영향요인)

  • Lee, Jin Beom;Kim, Young Im;Choi, Sook Ja;Choi, Young
    • Korean Journal of Occupational Health Nursing
    • /
    • v.23 no.4
    • /
    • pp.254-261
    • /
    • 2014
  • Purpose: The purpose of this study was to investigate the degree of performance of TB control manpower in Korea and to identify the affecting factors associated with it. Methods: This study employed a quantitative observational with cross-sectional design and the subjects were consisted of 189 TB (Tuberculosis) control manpower who were working in both community health centers and private hospitals. Variables included in this study were demographic, social, work-related characteristics, aqhnd self-efficacy. A reliability of the instrument for the performance was Cronbach's ${\alpha}$=.91. Data were analyzed by t-test, ANOVA and multiple regression using SPSS (19th version). Results: The mean value of the degree of work-related performance of TB control manpower was $4.4{\pm}0.49$9 and it was higher than those of general nurses working in any other health care departments. The mean differences in the degree of work-related performance were in self-efficacy, workplace, the number of full charge manpower in TB, the number of participation in in-depth education, and the willingness to job maintenance. In multiple regression analysis, factors associated with TB control manpower' work-related performance were self-efficacy (${\beta}$=.164, p=.025), workplace (${\beta}$=-.186, p=.023), the number of participation in in-depth education(${\beta}$=.339, p<.002), and the willingness to job maintenance (${\beta}$=-.157, p=.036). Conclusion: Results of this study showed that work-related performances of manpower working in private hospital were higher than those of manpower in public health centers. So, it is necessary to enhance nation's active intervention to improve effectiveness and reduction of risk factors in TB policy.

A Study on the Outsourcing of Aircraft Maintenance Contracts

  • Cho, Kyung Rak
    • Journal of Aerospace System Engineering
    • /
    • v.15 no.6
    • /
    • pp.66-71
    • /
    • 2021
  • With the exception of some large domestic airlines with adequate maintenance capability, most low-cost and small airlines do not have the facilities, equipment/tools, or manpower to perform periodic inspections over "C check." They are repaired according to maintenance programs specified by manufacturers. The outsourcing (domestic or overseas) of maintenance contracts is thus crucial to achieve good quality service at low cost, and these contracts therefore need to be signed with a full understanding of what is to be expected. This study aims to determine the requirements to be considered prior to finalizing such contracts.

Program-level Maintenance Scheduling Support Model for Multiple University Facilities (프로그램레벨 다수 대학시설물 유지보수 일정계획 지원 모델)

  • Chae, Hong-Yun;Cho, Dong-Hyun;Park, Sang-Hun;Bae, Chang-Joon;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.303-312
    • /
    • 2018
  • The university facility is made up of multiple buildings and has many maintenance items. In addition, administrative constraints need to be handled within a limited period. Most maintenance work is small scale and multi-work construction, such as waterproofing, needs to be organized. The facility manager makes annual unit price contract with a maintenance company and carries out the maintenance work. On the other hand, delay and rework is occurring because existing maintenance work performed without scheduling based on the manpower input. This study proposed a scheduling model that can support the facility manager to manage maintenance works of multiple university facilities at the program level. The model consists of three stages in order. In object analysis, details of the maintenance items were analyzed and the quantity is calculated based on the quantity takeoff sheet. In resource analysis, the craftsmen and construction period of detailed works are derived for the effective input of craftsmen. In scheduling, the priority of each work and the optimal manpower input are derived. The optimal schedule is selected according to the goodness of fit. The applicability and effectiveness of the prototype was evaluated through a case study and interviews with case participants. The model was found to be an effective tool to support the scheduling of maintenance works for the facility manager.

A Manpower Distribution Model for Software Development Cycle (소프트웨어 개발주기 인력분포 모델)

  • 박석규;박중양;박재홍
    • Journal of the Korea Computer Industry Society
    • /
    • v.5 no.1
    • /
    • pp.9-18
    • /
    • 2004
  • Successful project planning relies on a good estimation of the manpower required to complete a project in addition to the schedule options that may be available. Existing software manpower estimation models present the total manpower and instantaneous manpower distribution for the software life cycle. Putnam's Rayleigh and Phillai et al.'s Gamma models present a model with assumption that the manpower is needed at the system delivery. This means that 40 percent of total manpower is applied at the software development, and the other 60% is applied during maintenance phase. However Warburton observes the manpower is needed during development phase with the peak at the completion of the software design phase. So, the existing models were not appropriate to be applied to practical projects. This paper suggests the Sigmoid model which does not consider the point of manpower peak to fix the problem above. The suggested model showed some improvement when practical data was applied. Therefore, the Sigmoid model can be used as alternative of Rayleigh and Gamma model to estimate distribution of manpower during software development phas.

  • PDF

Structure Evaluation of Korean Health Promotion Programs (우리나라 보건소 건강증진 사업의 구조적측면 평가)

  • Lee Chung Yul;Kim Hee Soonl;Lee Tae Wha;Ham Ok Kyung
    • Journal of Korean Public Health Nursing
    • /
    • v.17 no.2
    • /
    • pp.181-191
    • /
    • 2003
  • Purpose: The purpose of this study was to evaluate demonstration health promotion programs offered by 18 health centers in a structural aspect of the health centers. Methods: The Evaluation Committee was organized with professors from collaboration universities and researchers of this study. Using structure evaluation frame. reports from 18 health centers were reviewed by the committee. Evaluation categories included organizational change, manpower construction, budget, and manpower training and education. Results: Only 5 health centers out of 18 have independent health promotion department. Nurses played a major role for health promotion programs. Other health personnel participated in the health promotion programs included dental hygienists, nutritionists, and exercise specialists. Related to program budgets. local government support rates were varied by the region. Various kind of manpower training was offered to health personnel for the health promotion programs including smoking control. exercise, alcohol, nutrition, and so forth. Conclusion: The study results indicated that establishment of independent health promotion department, maintenance of same manpower construction, provision of diversity manpower training were the factors that foster effective health promotion programs.

  • PDF

Achievements and Tasks of the SMRT Tunnel Monitoring System(TMS) (서울도시철도공사 터널모니터링 시스템의 운영성과와 과제)

  • Park, Jong-Hun;Kim, Man-Hwa;Park, Ki-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.4
    • /
    • pp.381-387
    • /
    • 2012
  • This paper is aimed to analyze the achievements of the Tunnel Monitoring System(TMS), implemented in Seoul subway L5~L8, and to find out improved methods. By introducing the TMS, it is possible to inspect tunnel facilities for 24 hours a day while trains are operated. The inspection capability could be expanded, the accuracy was improved, and the cycle was shortened. The efficiency of manpower was improved and the surplus manpower could be used for other tasks of facilities maintenance. As a result, by introduction of the TMS, the amount of tunnel maintenance was increased by 225% and the train service troubles caused by facility problems were decreased by 53%.

An Empirical Study on Contract Model for IT Outsourcing Application Operation (IT 아웃소싱 어플리케이션 운영 계약모델에 대한 실증적 연구)

  • Kim, Heungshik;Park, Soah
    • Journal of Information Technology Services
    • /
    • v.16 no.2
    • /
    • pp.45-60
    • /
    • 2017
  • The study suggests a contract model of application operation through case study of A bank's IT outsourcing application contract based on workload. The IT outsourcing order form has a problem in that the scope of work is ambiguous due to the integration of operation and maintenance. In this study, application operation and maintenance were separated by referring to application operation history provided in ISO/IEC15504-5 standard. The scope of the IT outsourcing service was clarified by organizing the definition and detail activities of the application operation business. Application operation contract method has generally applied estimation method by the number of input manpower and period by agreement between buyer and client. As there is no activity to calculate the number of input manpower based on the operational work history and based on the standard workload per activity. In this case is not guaranteed due to the simple agreement between the contractors. In this paper, we propose an application operating cost estimation model that measures the size of the operating software using function point analysis that is the basis of application operation tasks. In order to verify the validity of the application operation cost model, we verified the correlation between the application size and the labor cost through regression analysis using SPSS.

The Simulation and Forecast Model for Human Resources of Semiconductor Wafer Fab Operation

  • Tzeng, Gwo-Hshiung;Chang, Chun-Yen;Lo, Mei-Chen
    • Industrial Engineering and Management Systems
    • /
    • v.4 no.1
    • /
    • pp.47-53
    • /
    • 2005
  • The efficiency of fabrication (fab) operation is one of the key factors in order for a semiconductor manufacturing company to stay competitive. Optimization of manpower and forecasting manpower needs in a modern fab is an essential part of the future strategic planing and a very important to the operational efficiency. As the semiconductor manufacturing technology has entered the 8-inch wafer era, the complexity of fab operation increases with the increase of wafer size. The wafer handling method has evolved from manual mode in 6-inch wafer fab to semi-automated or fully automated factory in 8-inch and 12-inch wafer fab. The distribution of manpower requirement in each specialty varied as the trend of fab operation goes for downsizing manpower with automation and outsourcing maintenance work. This paper is to study the specialty distribution of manpower from the requirement in a typical 6-inch, 8-inch to 12-inch wafer fab. The human resource planning in today’s fab operation shall consider many factors, which include the stability of technical talents. This empirical study mainly focuses on the human resource planning, the manpower distribution of specialty structure and the forecast model of internal demand/supply in current semiconductor manufacturing company. Considering the market fluctuation with the demand of varied products and the advance in process technology, the study is to design a headcount forecast model based on current manpower planning for direct labour (DL) and indirect labour (IDL) in Taiwan’s fab. The model can be used to forecast the future manpower requirement on each specialty for the strategic planning of human resource to serve the development of the industry.

A Software Manpower Profile for Software Development Life Cycle (소프트웨어 개발 라이프사이클 인력 프로파일)

  • Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.11D no.5
    • /
    • pp.1123-1132
    • /
    • 2004
  • Successful project planning relies on a good estimation of the manpower required to complete a project. The good estimation can be derived from Rutnam's Rayleigh Model or Phillai et al.'s Gamma Model. These models only can be applied for the projects which the need of manpower is increased exponentially and the highest of manpower is required at the end of development phase. However, in a practical project, most manpower is required during development phase and a small amount of manpower is assigned during maintenance phase. In addition, the Waterfall Model and Unified Process only can be adopted for development phase. So the current development environments cannot be adopted into the existing manpower distribution models which the highest manpower is required at the end of development phase. This paper suggests an appropriate model for development phase to solve this problem. First, the appropriate manpower distribution for development phase of the Waterfall model was derived from Putnam's manpower distribution and then manpower distribution of development phase was derived for Unified Process. After comparing the required manpower of two Processes, total manpower distribution is similar each other even though the required manpower and task is different for each point of development phase. From this result, a unified model is derived and it can be applied for both development processes.